Hammer Project KV020 S-KPI CBO

Slides:



Advertisements
Similar presentations
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Post Launch Tuning Cingular UMTS.
Advertisements

Source: GSM Association, 2010 Mobile Networks. Source: GSM Association, Coverage and Capacity Mobile communications networks are designed for both.
Service specific load management
Layer 3 Messaging and Call Procedures
RNO Wind Part II.
AB 11 22 33 44 55 66 77 88 99 10  20  19  18  17  16  15  14  13  12  11  21  22  23  24  25  26  27  28.
RF OPTIMISATION IN GSM NETWORKS Regional Telecom Training Centre, Trivandrum :
Capacity and Load Sharing in Dual-Mode Mobile Networks
Interview and drive test tips
Slide title In CAPITALS 50 pt Slide subtitle 32 pt KPI Reporting and Analysis Templates Naren Mohan
Independent Study Division of Adult Education Compliance Rules Handbook.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Cingular UMTS Phase II Markets Pre-Launch RF Activities.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt H igh S peed D ownlink P acket A ccess Naren Mohan
Slide title In CAPITALS 50 pt Slide subtitle 32 pt HANDOVER Overview.
1 © NOKIA Streaming QoS/Musa Aldarawsheh, April 8 th 2005 Author: Musa Aldarawsheh Senior I&V Engineer/ Nokia Networks Supervisor: Prof. Sven-Gustav Häggman.
06/09/2005Master's Thesis Seminar - Jesse Kruus 1 Analyzing and Developing Base Load for WCDMA Base Station Automated Testing System Thesis written at.
Business Id © NetHawk All rights reserved. Confidential April 2005NetHawk NetHawk Quality of Service products Markus Ahokangas, MSc Product.
LTE Mobility. Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt POST LAUNCH TUNING.
Rev PA1 WCDMA RAN PM - Supplemental Information 3/3/20051 WCDMA RAN PM Supplemental Information.
Page: 1 Technology Planning IS-95 IS-2000 Hand-off Analysis Prepared by Dragan Nerandzic, Bell Mobility.
InnoSys Park Brake Tool Master Control Panel Screens Revision A, 12Dec /12/20071.
Spring Hill Assembly1 InnoSys Park Brake Tool Master Control Panel Screens 1 3-Mar-2008.
2G Vs 3G Drive TEST with tems
Cost & Management Accounting Break-even Analysis Lecture-31 Mian Ahmad Farhan (ACA)
親愛的吉姆舅舅: 今天吃完晚餐後,奶奶說,在家 裡情況變好以前,您要我搬到城裡跟 您住。奶奶有沒有跟您說,爸爸已經 好久沒有工作,也好久沒有人請媽媽 做衣服了? 我們聽完都哭了,連爸爸也哭了, 但是媽媽說了一個故事讓我們又笑了。 她說:您們小的時候,她曾經被您追 得爬到樹上去,真的嗎? 雖然我個子小,但是我很強壯,
HUAWEI 3G CAPACITY OPTIMIZATION.
Signaling Flow of WCDMA Advanced Radio Interfaces ZTE University.
4 Starting Tips to Keep Your Car in Top Condition
Yupana Experience & Solutions October /24/2015Confidential.
KPI ANALYSIS REASONS AND SOLUTIONS.
LTE L17A O&M courses and RBS 6000 / Baseband related courses
Coverage Map Accuracy 2nd Nov 2016.
Guide of Genex Assistant for LTE
Hammer Project KV020 S-KPI CBO
Celcom Golden cluster Post Drive test peak result
Content Layer3 Message Analysis.
Executive Summary GFR has been successfully implemented on 22th April 2014 POC MATARAM: Perceived Drop Rate, SDCCH Drop Rate, SDCCH Success Rate , TBF.
Project hammer T00278 LTE DT Analysis Celcom CA Project
Project CA project T00087 oss KPI justification - Appendix CA Project
Hammer Project Celcom CA SSO Project
Project hammer d00346 Sub Cluster CA - SSO Celcom CA Project
Author: Mathias Nyman Supervisor: Prof. Sven-Gustav Häggman
Hotspot KPI Guideline YL.Y
4G_CA project_OSS Justification
Single Site Acceptance Report for TIGO UMTS Project Phase II
Project hammer Cluster C00200 CA - SSO Celcom CA Project
Hammer Project KV020 S-KPI CBO
Hammer Project Celcom CA SSO Project
Project hammer d00219 Sub Cluster CA - SSO Celcom CA Project
UMTS Call Drop Analysis
Celcom LTE CA Project_OSS
PC_SBE_09 WCDMA OSS Analysis
4G_CA project_OSS Justification
Celcom LTE CA Project_OSS
LTE Mobility LTE Mobility.
Hammer Project Celcom CA SSO Project
PROJECT BAU MODERNIZATION
Soft Handoff Soft handoff for MC 1X and DS works as in IS-95-B
Project hammer PC_CA_SWE_07 CA Celcom CA Project
Project hammer PC_CA_ERE_06 LTE DT ANALYSIS Celcom CA Project
By Norton Setup CA TollFree (US/CA/AU/UK)
Hauwei hcs in dual band netwrok
Self-Management for Unified Heterogeneous Radio Access Networks ISWCS 2015 Twelfth International Symposium on Wireless Communication Systems Brussels,
دور المجتمع المدني في ترشيد وتحسين كفاءة الطاقة آفاق جديدة ومتجددة...
Network-Health Report
AS Apply a design process and design principles to identified needs and opportunities Sample 1. Merit.
Optimisation of Softer Handover in UMTS Network
X Documentation Batch No Date Pass/Fail Signature /10/05
IC; sc, ic.
Presentation transcript:

Hammer Project KV020 S-KPI CBO 2016-08-26 Project CA project S00102 oss KPI justification - Appendix © Ericsson AB 2016

Multitech 3G kpi Justification PROJECT BAU MODERNIZATION 2016-10-26 Multitech 3G kpi Justification

S00102 3G oss kpi justification # Description Target Value Technology Baseline KPI Result PASS/FAIL Comments   3G 2016-12-16 00:00 to 2016-12-22 00:00 2017-04-17 00:00 to 2017-04-23 00:00 Please find the OSS Analysis sheet. A.19.4.19.1 Cell Availability Maintain/Improved 99.82 99.50 Fail Refer to OSS Analysis A.19.4.19.2 CSSR_AMR 99.83 99.85 PASS A.19.4.19.3 CSSR_PS 99.69 99.68 Nornal fluctuation A.19.4.19.4 AMR Call Drop Ratio 0.28 0.15 A.19.4.19.5 PS Service Drop Ratio 0.44 0.46 A.19.4.19.6 SHO Success Rate (AMR Service) 99.95 99.97 A.19.4.19.7 SHO Success Rate (PS Service) 99.93 99.90 A.19.4.19.8 HS-DSCH Service Cell Change Success Rate 99.99 99.98 A.19.4.19.9 HSDPA RAB Setup Success Rate 98.88 98.91 A.19.4.19.10 HSUPA RAB Setup Success Rate 99.84 A.19.4.19.11 HSDPA Retainability 0.68 A.19.4.19.12 HSUPA Retainability 0.66 0.67 A.19.4.19.13 CS Inter-RAT Handover Success Ratio 95.64 96.69 A.19.4.19.14 CS Inter-Frequency HHO Success Rate 97.97 97.95 A.19.4.19.15 PS Inter-Frequency HHO Success Rate 96.18 96.34 A.19.4.19.16 RTWP -102.54 -102.65 A.19.4.19.17 PRACH propagation delay(KM) 0.612656954 0.613868721 A.19.4.19.18 CS Traffic(Erl) 3126.62 3142.52 A.19.4.19.19 CS RAB attempt 176752.00 196022.00 PS RAB attempt 1246201.00 1527095.00 A.19.4.19.20 PS traffic(MB) 2249554.52 4888144.76

S00102 3G oss kpi justification Analysis: Cell availability failed in the selected result period main due to cell down time auto caused by neighbor site RW10268 & RA40271 , which had alarms existed then, and after that alarms disappeared.

Hammer Project KV020 S-KPI CBO 2016-08-26 © Ericsson AB 2016