Dubna/JINR Status & Plans

Slides:



Advertisements
Similar presentations
CSC Test Beam Data Analysis Alexander Khodinov and Valeri Tcherniatine.
Advertisements

7/5/05,MEG DC,je MEG DC 1.Foils 2.Wires 3.Frames + tools 4.Preamplifier 5.Gas pressure control 6.final.
Progress report NeuLAND Outline Short reminder about NeuLAND Timing RPC concept Open questions - Impedance matching RPC prototype at GSI Next steps Collaboration.
Christine KOURKOUMELIS University of Athens ATLAS Muon Chamber construction in Greece and alignment studies for H  ZZ  4μ decay Como, 8/10/03.
Status of PNPI R&D for choice of the MUCH tracking base detector (this work is supported by INTAS) ■ Introduction ■ MICROMEGAS ■ GEM ■ MICROMEGAS+GEM ■
Shashlik type calorimeter for SHIP experiment
Ivan Vitev & E906 Muon Identifier Status Patrick McGaughey and the muon radiography team E866 Meeting at FNAL June 20-21, 2007 Large Muon Tracker at LANSCE.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
Status of straw-tube tracker V.Peshekhonov, D.Peshekhonov, A.Zinchenko JINR, Dubna V.Tikhomirov P.N.Lebedev Physics Institute, Moscow Presented on the.
RPCs of BESIII Muon Identifier  BESIII and muon identifier  R&D  Mass production  Installation Zhang Qingmin Advisor: Zhang Jiawen.
M. Bianco On behalf of the ATLAS Collaboration
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
Luca Spogli Università Roma Tre & INFN Roma Tre
The GEM activities at Tsinghua University Zhigang Xiao 1, Yan Huang 1, Rensheng Wang 1, Haiyan Gao 1,2 1 Department of Physics, Tsinghua University 2 Dept.
PNPI, R&D MUCH related activity ● Segmentation ● Simulation of the neutral background influence ● R&D of the detectors for MUCH ● Preparation to the beam.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
Magnetized hadronic calorimeter and muon veto for the K +   +  experiment L. DiLella, May 25, 2004 Purpose:  Provide pion – muon separation (muon veto)
2002 LHC days in Split Sandra Horvat 08 – 12 October, Ruđer Bošković Institute, Zagreb Max-Planck-Institute for Physics, Munich Potential is here...
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
Test Beam Results on the ATLAS Electromagnetic Calorimeters Lucia Di Ciaccio – LAPP Annecy (on behalf of the ATLAS LAr Group) OUTLINE Description of the.
Paul Rubinov on behalf of Gene Fisk, Kurt Krempetz 22 Aug 2012.
Electronics for Range System Prototype Tests A. Piskun ITEP, Moscow, 28 April, 2010.
CBM 12 th Meeting, October 14-18, 2008, Dubna Present status of the first version of NIHAM TRD-FEE analogic CHIP Vasile Catanescu and Mihai Petrovici NIHAM.
1 PANDA FWD Meeting, GSI-Darmstadt, Preparation of the TDR for the forward tracker University Ferrara + Jagiellonian University, Cracow Main.
FEE for Muon System (Range System) Status & Plans G.Alexeev on behalf of Dubna group Turin, 16 June, 2009.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
PANDA experiment at FAIR (JINR Participation) project PANDA A.G.Olshevskiy for JINR PANDA team VBLHEP – DLNP – LIT - BLTP.
BMBF-JINR PANDA Meeting, Dubna, November 15, 2013 G.Alexeev (for muon group) Status of Project and Related Topics * Report to the Muon Review Panel ( CERN,
FWD Meeting, Torino, June 16th, News from Cracow on the forward tracking J. Smyrski Institute of Physics UJ Tests of CARIOCA and LUMICAL preamplifiers.
1 The Scintillation Tile Hodoscope (SciTil) ● Motivation ● Event timing/ event building/ software trigger ● Conversion detection ● Charged particle TOF.
G.Alexeev for Dubna group ITEP, April 28, 2010 Muon System Status Report from Dubna Hardware : * Full Scale prototype - in preparation to be put in work.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
STATUS of BIG PROTOTYPES A. Piskun (for Dubna group) Protvino, 7 June 2011 _________________________________________________ Full Scale Prototype Range.
A high rate fast precision tracking trigger with RPCs
Work on Muon System TDR - in progress Word -> Latex ?
Activity: TDR: * Range System Prototype is on the way to CERN
Setup for automated measurements (parametrization) of ASD2 chip
Status of the forward tracker design
Electronics for Range System Prototype Tests
News from Cracow on the forward tracking
MDT second coordinate readout: status and perspectives
FSC status and plans Pavel Semenov IHEP, Protvino
Muon simulation status from Dubna
PANDA Muon Group Meeting, Protvino 7 June 2011 G
MDT and analog FEE mass production:
Entrance Muon Counter (EMC)
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
SHiP straw tracker prototype tests
Huagen Xu IKP: T. Randriamalala, J. Ritman and T. Stockmanns
Progress report since june 2010
G.Alexeev for Dubna group ITEP, April 28, Muon System Status Report from Dubna.
GRPC activity for EuDHCAL in IHEP-Protvino
IHEP group Shashlyk activity towards TDR
News on second coordinate readout
ITEP /4/2010 – II Panda Russia Meeting – Maria Pia Bussa
Work packages status in Torino and perspectives
Chris Smith California Institute of Technology EPS Conference 2003
GEM-based Digital Hadron Calorimetry for SiD
Han Jifeng BESIII MUON GROUP IHEP, CAS
BESIII RPC Detector Jiawen Zhang
Development of Gas Electron Multiplier Detectors for Muon Tomography
Ion Backflow Studies at Cornell
Muon Detector Jiawen ZHANG 16 September 2002.
High Rate Photon Irradiation Test with an 8-Plane TRT Sector Prototype
Pre-installation Tests of the LHCb Muon Chambers
RPC Front End Electronics
Single rate plateau curve with different gas mixture
Resistive Plate Chambers performance with Cosmic Rays
Limited Streamer Tube Project Summary
Gain measurements of Chromium GEM foils
Presentation transcript:

Dubna/JINR Status & Plans PANDA Range System Dubna/JINR Status & Plans G.Alexeev on behalf of Dubna group Turin, June 16, 2009

Software activity: Hardware activity: * Muon Filter conceptual design * Forward Range System conceptual design * MDTs in PANDAroot for FRS * MDTs in PANDAroot for MF -> pending a decision on concept Hardware activity: * Study of MDTs at test stand : - “closed” vs “open” geometry (cosmic + Fe-55) - strip signals amplification and r/o for “open” geometry - coordinate accuracy with strip r/o, r.m.s. ~ 0,5 mm * Design, production and tests of FE electronics - on stand and prototypes * Full scale RS prototype ( 2m x 4m) -> second coordinate r/o with long strips : - mechanics and MDTs are ready - FE electronics is funded (BMBF) and being manufactured now - beam test start is scheduled for autumn 2009 (within COMPASS/CERN) * RS prototype ( 1m^3) : - funds are requested (BMBF) - to be conducted on PS beam lines at CERN - for details see next presentation -> RS prototype beam test, the Proposal to PANDA

PANDA µ - Filter 700 MDTs Dipole Target Spectrometer 2600 MDTs FRS 900 MDTs Dipole RICH ECAL Target Spectrometer 2600 MDTs TOTAL : about 4200 MDTs PANDA Muon and Hadron Detection in PANDA by Range System

End Cap and Muon Filter

Side view

Top view

General view of Forward Range System (FRS) with beam pipe.

FRS module (G~=18.5 t) Single FRS module in assembly process (park position of support platform; not shown)

(60mm/Fe + 30mm/MDT)x16 Superposition of FRS with inclined beam pipe: 4 modules(of 4 plates each) with lateral shift of 14.4 mm; beam pipe hole is 300mm x300 mm.

(60mm/Fe + 30mm/MDT)x16 (beam pipe perpendicular to FRS; inclined beam fits the pipe aperture with ~48mm gap. 48 48 48

MDTs in PANDAroot Target Spectrometer Endcap Barrel FRS beam

MDTs in PANDAroot for TS endcap (MDTs for MF = “clone” of TS_EC)

Test stand : different types of MDTs and FE electronics MDT module Ampl-8.3 QTC part

An artistic view of tested MDTs G10 board, 4 strips, 1cm wide each 4 layers, 4 strips on each layer

Fe-55 spectra for MDT with closed and open cathode geometry Fe-55 spectra vs anode voltage for 70% Ar + 30% CO2 gas mixture Significant background for small detector cell 10X10 mm ( 5.9 keV X-ray attenuation length about 28 mm) The same position of 5.9 keV peak at 100V anode voltage shift

Gas gain for counting rate plateau range For gas gain calculation we used dependance of 5.9 keV peak position vs anode voltage

Comparison of MDTs with closed and open cathode geometry Curves of cosmic counting rate for MDT with open cathode geometry have right shift about 80 volts and the same curves shape. Plateau range is about 200 V

Wire and strip signals Signals after the AMPL-8.3 on 50 Ohm load Single event Averaged

Strip Signal Amplification Card (A2-16) A2-16 card (two cascade Ampl-8.3 with 16 analog outputs). Amplifiers AMPL-8.3 Trace 1: Anode signal, K≈60 mV/μA Trace 2: Strip signal, inverted, K≈480 mV/μA To Amplitude Analysis from MDT Ampl 8.3 Ampl 8.3

Track reconstruction with 1cm x 8 cm strips Tracks are near vertical and close to the center σ ≈ 0.5 mm

A2DB-32 Board * double cascade amplification (0,1-10 uA input signals +/-, Ampl-8.3) * 32 channels analog output +/- (>=50 Ohm load ) * 32 channels logic output (ECL, LVDS – Disc-8.3)

Full scale RS prototype (2m x 4m) for 2nd coordinate strip R/O (manufactured, pending for r/o electronics) 45 short MDTs (360 wire r/o channels, maximum) 24 long MDTs (192 wire r/o channels, maximum) 4 m long strips, 1 cm width (192 strip r/o channels) 2 m long strips,1 cm width (360 strip r/o channels)

RS prototype for beam test 1530 mm 1000 mm 1060 mm Fe volume ~ 1 m3 ( ~ 8 t ), 288 MDTs 1 m long 2000 channels of wire r/o + 2000 channels of strip r/o

Plans for 2009 * MDTs layout in PANDAroot for whole Spectrometer (Dubna, GSI, Torino) – MDTs for MF to be a dded * Benchmark processes study in PANDAroot (Dubna, Torino) * Study of prototypes: - full scale (2m x 4m) RS prototype ( COMPASS, 2009 ->) - RS prototype (1 m3) beam test -> the Proposal to PANDA ( Dubna/JINR + ? at PS/CERN , 2010 ->)