COOLING LHC RACKS PROCUREMENT

Slides:



Advertisements
Similar presentations
CMS Week March presented by John Coughlan RAL FED Hardware Status Pre-Series Manufacture Final Production Plans.
Advertisements

27 September 2005A.Ciocio - ID Week1 SCT Service Installation Overview Status of Type IV Cable Installation Type II/III Cable Installation Plan for the.
SCT Power Supply Installation Schedule Jan Bohm, Prague AS, 4 th November 2005 The SCT Power Supply System will be installed in 22 LV&HV racks situated.
Whole School Attendance Whole School Attendance 94.64% Overall School Absence 5.36%
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
29 November 2005A.Ciocio - SCTSG1 Type IV Cables and PP3 Status of Type IV installation Connector in situ work Status of PP3 Testing.
ชุดใบพัด ประหยัดพลังงาน EnergySavingGuarantee President Chemical Co., Ltd. รูปงานติดตั้ง.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
JPV, TB of Nov.15 th, ‘Rack Status‘ Jean-Pierre Vanuxem, PH-AIS.
Electronic Systems Support LHC Crates 2005 Paul Harwood PH Electronic Systems Support Group (PH-ESS) Meeting Sept 1, 2004.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
RWA, 8/12/2006 Present Preliminary Production Plan All still preliminary, as we are re-establishing production. January 9 th,2007: –Delivery of 2 ring.
The Construction of the LHC Detector Gas Systems ? Ferdi Hahn PH-TA1-GS Detector Steering Meeting 4th of June 2004.
LARP CM15 Magnet Testing Working Group SLAC, November 2 nd 2010.
Electronic Systems Support Demonstrator Racks Rack coordination meeting 12 October 2004.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
Compressor status AWAKE Technical Board meeting 19 August 2015.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
Comment on the LHCb upgrade cooling plan Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
17/03/2003 Referee Meeting M. Beretta 1 MDT Barrel - Complete LV-HV rack 6U 1U 4U 2U 45U 19” Tangential Fan High Voltage Crate Low Voltage Crate Heat Exchanger.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
V. Bobillier1 Cable installation status.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
Wiener Maraton & Turbines Pascal Perret LPC Clermont 16 April 2008.
Status of integration in USA15. Status of rack layout 20/03/2015FTK Italia - A. Lanza2 Rack Y A2 equipped with turbine cooling system and nominal.
Interventions on electrical distribution and racks’ infrastructure still to be done during LS1 and their impact W.Iwanski.
Dominique Boutigny December 12, 2006 CC-IN2P3 a Tier-1 for W-LCG 1 st Chinese – French Workshop on LHC Physics and associated Grid Computing IHEP - Beijing.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
P. 1Mario Deile – TOTEMino: Status and Schedule Mario Deile Zone 2.Gas system 3.Cooling water 4.Cables 5.Safety 6.Schedule, Project Plan 7.Schedule.
S A Griffiths CM42 June 2015 Electrical & Control.
10 mm is the same as... 1 cm. 20 mm is the same as... 2 cm.
FTK infrastructures and DCS 02/12/20101FTK Initial Design Review - A. Lanza  Crates  Single rack layout  Cabling  Rack placement  DSS  DCS.
Schedule for the FAIR Antiproton Target
Cabling for LHCb Upgrade
Status of LHCb PC Farm prototype
Rack Design Proposal as of 01/03/2013
FTK infrastructure in USA15 Status and plans for 2015 A
11 T Dipole Integration & Plans M. Karppinen
LEP cryostat Procurement strategy and plans
John Gordon, STFC-RAL GDB 10 October 2007
CMS Area Working Group Meeting
ATF2 Magnet Power Supplies
OMP 15th May 2017 Krzysztof Brodzinski and Nicolas Bonetti
(Procurement, testing of magnets)
YETS & LS2 Reminder G. Girardot 20 juin 2017.
LHCb electronics, 12th June 2014
John Gordon, STFC-RAL GDB March 11, 2009
SR1 cleanroom extension
Electrical and electronic systems projects
Bernd Panzer-Steindel CERN/IT
Luca dell’Agnello Daniele Cesini GDB - 13/12/2017
Euromedim proposal (Applying HEP methods in medical imaging)
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
ATLAS USA15 - Rack 52U with 9U crates, remote PS
Track Finder Crate, Backplane and Parts
TileCal ROD Commissioning Counting Room Installation
ELENA Magnet Installation Planning
BLM planning 24/02/2014.
BLM planning 03/03/2014.
III. Correction Dipoles MDG Accessories for all Magnets V. Summary
Buying CERN-Standard Crates
ชุดใบพัดประหยัดพลังงาน
LS1 status 17/03/2014.
Overall time schedule of SRF activities
Friday 1st October : Van der Meer scans
Presentation transcript:

COOLING LHC RACKS PROCUREMENT

Contents Turbine + monitoring Deflectors Fan trays Enclosures and accessories

Turbine + monitoring Contract situation Project has been split in two contracts : Long and short metal turbines :BM55 with Rack Peruzzi/Automelec Zielh-Abbeg fans supplied by CERN Monitoring boards supplied by CERN 19” crate fabricated by Rack Peruzzi Electrical installation + testing by Automelec Long and short plastic turbines :BM56 with Automelec/Rack Peruzzi Plastic fans supplied by Automelec

Turbine + monitoring Pre-series orders 100pcs of long plastic turbine units; 85 delivered; 15pcs on delivery 38+1pcs delivered to CMS 39+1pcs delivered to ATLAS 2+1pcs delivered to LHCb 1pc delivered to ALICE 2pcs at CERN Stores Who need the last 15pcs of the pre-series order?

Turbine + monitoring Series orders Long and short metal turbines 205pcs (long) ordered by CMS 220pcs (long) ordered by ATLAS 32pcs (long) ordered by LHCb 26pc (short) ordered by ALICE Long and short plastic turbines 90pcs (long) + 110pcs (short) ordered by CMS 0pcs ordered by ATLAS 16pcs (long) + 13pcs (short) ordered by LHCb 97pc (long) ordered by ALICE TOTAL = 809 units

Turbine + monitoring + Delivery planning 1st batch : 40pcs short plastic turbines end of November  CMS 2nd batch : 60pcs long metal turbines end of December  LHCb Following batches : 100pcs / month 709pcs on order! Priorities to be agreed today !

Deflector Separate contract with Rack Peruzzi No problem with deliveries Lead time approximately 4 weeks

Fan trays 06.61.77.710.8 PC 355.00 AXIAL FAN UNIT 19" 725 mm 12 fans Lead time = 6 weeks

Enclosures and accessories Deliveries are on going; Always transport problems from Poland Accessories are kept on stock at the CERN Stores Rack enclosures on direct delivery Contract ends 31/12/2005; Do you need more enclosures ?