R2E impact of TCL settings: input for 2017 operation

Slides:



Advertisements
Similar presentations
Collimation with retracted TCSGs R. Bruce, R. Kwee, S. Redaelli.
Advertisements

Simulation priorities for 2015 R. Bruce for task 5.2.
Will we still see SEEs? (a word trick game) R2E Project Meeting - draft presentation for Chamonix 2012 – 19 th January 2012 M. Calviani (EN/STI) for the.
K. Potter RADWG & RADMON Workshop 1 Dec WELCOME TO THE 4th RADWG & RADMON WORKSHOP 1 December 2004.
TS-LEA, CERN, 1211 Geneva 23 1 T. Wijnands TS/LEA, C. Pignard AB-CORADWG-RADMON day – 1 December 2004 LHC Power Converters & Radiation T. Wijnands TS/LEA.
R2E Weekly Report status AT/MB/MC – 4 th R2E Project Meeting – 7 th April 2011.
Studies of radiation hardness of ECAL modules 1Yu. Guz 2013/05/28.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
2 nd BLMTWG meeting, B. Auchmann, O. Picha, with A. Lechner.
Status of FLUKA Simulations for Collimation BLM Thresholds 6 th BLM Threshold Working Group 10/02/2015 E.Skordis On behalf of the FLUKA team Sixtrack input.
DS Heat Load Scenarios in Collision Points and Cleaning Insertions. Prepared by F. Cerutti, A.Lechner and G. Steele on behalf of the FLUKA team (EN-STI)
Nov 28, 2013 Power Converters Availability for post-LS1 LHC TE-EPC-CCE.
TRIUMF and ISIS Test Facilities Radiation 2 Electronics (R2E) LHC Activities TRIUMF and ISIS test facilities Rubén García Alía, Salvatore Danzeca, Adam.
Simulation comparisons to BLM data E.Skordis On behalf of the FLUKA team Tracking for Collimation Workshop 30/10/2015 E. Skordis1.
LMC Update - R2E Failures December 5 th 2012 (R2E) Mitigation Project: LMC Update December 5 th 2012 R2E SEE Update M. Brugger on behalf.
Heat Deposition Pre-Evaluation In the context of the new cryo-collimator and 11-T dipole projects we present a review of the power deposition studies on.
Radiation monitoring: what do we have and what do we need? M. Calviani, M. Brugger, P. Peronnard, J. Saraiva, G. Spiezia (EN/STI) R2E/Availability Workshop.
Report from the MCWG, 4 th R2E Committee Meeting M. Calviani for the MCWG (link), EN/STIlink.
Case study: Energy deposition in superconducting magnets in IR7 AMT Workshop A.Ferrari, M.Magistris, M.Santana, V.Vlachoudis CERN Fri 4/3/2005.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
NM4SixTrack Implementation of new composite materials for HL-LHC collimator upgrades in SixTrack “Tracking for SixTrack” workshop – CERN, R.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
TE-MPE-CP, RD, 28-Sep Problems with QPS DAQ Systems During LHC Operation, 1 st Results from 2010 CNRAD Tests R. Denz TE-MPE-CP.
CERN Converter Control Electronics Strategy for LHC Machine Electronics : Limitations & Risks
Results of TCL scans D. Mirarchi, M. Deile, S. Redaelli, B. Salvachua, Collimation Working Group, 22 nd February 2016.
2 nd BLMTWG meeting, B. Auchmann, O. Picha, with A. Lechner.
1 st BLMTWG Meeting, , B. Auchmann, O. Picha with help from M. Sapinski, E.B. Holzer, A. Priebe.
ENERGY DEPOSITION AND TAS DIAMETER
A few slides about ‘Very’ ;-) VERY Quick look on IR7 – RadLevels (Ion versus Proton Run) [good and bad refers to losses in the machine] PLEASE NOTE THREE.
Ion Run 2015: measurements in cells 11 for P1 and P5 P–Ion Run 2016: analysis of cell 8 for P1, P5, P2 and P8 Corinna Martinella EN-EA R2E-MCWG 04/07/2017.
Planning and strategy for HL-LHC R2E
CALIFES 2015 run preliminary results
R2E-MD preliminary report – 3rd/4th July th July LSWG meeting
Francesco Cerutti, Andrea Tsinganis WP10 Energy deposition & R2E
S. Roesler (on behalf of DGS-RP)
Outline Introduction to LHC Power Converters Remaining Inventory Observed Availability New inventory – FGClite Cumulative & SEE Effects Maintenance.
RADMON Salvatore Danzeca (EN/STI) on behalf of the R2E Project and RADMON team Thanks to all the RADMON Team!
LV Safe Powering from UPS to Clients
Injection region BLMs – ECR
R2E – Experience and Outlook for LS1
Dosimeters installation during the EYETS 28/03/17
TI8/WIC Incident & UJ87/UA87 Radiation Levels & Analysis
Automatic Generation of the Radiation Level Weekly Reports Update 28
X X X QURA PLC X RM01_R X RM01_L Long-Term?: QURC(A,B) QUI (-1)
Review of the MQW and MBW lifetime taking into account results from the reading of the dosimeters collecting data in the 2016 RUN Dosimeter (installation,
Automatic Generation of the Radiation Level Weekly Reports Update 18
IP7 losses scaling and impact on forecast for HL-LHC era
Dose levels at the SPS, monitoring and calculation.
Halo scraping and loss rates at collimators
Status and evolution of radiation dose on 60A power converters
Update on expected HL-LHC radiation levels
Disabling Rules.
Energy deposition studies in IR7 for HL-LHC
LHC Morning Meeting - G. Arduini
Saturday 12:00 Fill 1992 in stable beams.
Interpretation and use of BLM Data
Collimator Control (SEUs & R2E Outlook)
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
BLM changes HV software interlock (SIS)
Collimation margins and *
HL-LHC operations with LHCb at high luminosity
Radiation To Electronics Collimation Areas (IR7/3)
FLUKA Energy deposition simulations for quench tests
R2E LMC Update (Weeks 32/33) Post-Mortem database: SEE analysis and link to existing RadWG list in preparation Shielding block delivery crisis solved:
Summary for LPC (March 7th, Ralph Assmann)
Monday :15 fill 3523 dumped by BPMs IP6
Another Immortal Fill….
RADWG Meeting February 2017
Radiation levels in the service galleries in IP1 and IP5
LHC Physics Debris Simulation Update
Presentation transcript:

R2E impact of TCL settings: input for 2017 operation LHC Collimation Working Group #216, 10 Apr 2017 Rubén García Alía, on behalf of the R2E project

LHC Collimation Working Group #216 Introduction Quick overview of 2016 radiation levels related to TCL6 settings in P1 and P5 Projections for 2017 and impact on relevant equipment R2E recommendation for 2017 TCL6 settings April 10, 2017 LHC Collimation Working Group #216

TCL setting R2E impact: general overview w/o TCL6 with TCL6 FLUKA studies on the radiation in the Point 5 Q6-Q7 area:Roman Pots, TCL6 and RR, L. Esposito et al, LHC Collimator Working Group #168, January 2014 April 10, 2017 LHC Collimation Working Group #216

TCL setting R2E impact: general overview TCL6 effective in reducing losses in DS cell 9 Impact from collision debris: comparison of ATS and nominal optics, F. Cerutti et al, 3rd ATS optics preparation and validation meeting –December 7, 2016 April 10, 2017 LHC Collimation Working Group #216

TCL setting R2E impact: general overview TCL6 open: larger levels in DS, beginning of cell 9 Normalized Losses (Gy/fb-1) TCL6 closed: larger levels in RRs 2016 BLM measurements, proton-proton run (O. Stein, 25th MCWG, Feb 17) April 10, 2017 LHC Collimation Working Group #216

LHC Collimation Working Group #216 Levels in RR: 2016 2016 settings agreed with R2E input (174th LMC meeting, Feb 2014) – failures in the ARC were expected to dominate Different scenario due to lower ARC levels and FGC sensitivity (and now FGClite deployment) Similar levels per TCL operation mode and luminosity are expected for 2017 Point 1 (TCL6 open): ~5·107 HEH/cm2/40fb-1 Point 5 (TCL6 open): ~2.5·107 HEH/cm2/40fb-1 Point 5 (TCL6 closed): ~2.5·108 HEH/cm2/40fb-1 P1 & P5 UJ, RR and DS levels: 2016 measurements M. Kastriotou et al, MCWG #25, February 2017 April 10, 2017 LHC Collimation Working Group #216

LHC Collimation Working Group #216 Levels in DS: 2016 P1 RadMON cell 9 location: L1: Between MBB9 and MQ9 R1: between MQ9 and MBB9 P5 RadMON cell 9 location: L5: between MQ9 and MBB9 R5: below MBB9 No visible impact of TCL settings on radiation levels RadFET dose levels (40 fb-1): 9L1: 30 Gy 9R1: 4.2 Gy 9L5: 33 Gy 9R5: 5.4 Gy Cell 8: visible impact of TCL settings, but low absolute values (<1 Gy/40 fb-1) Analysis: Maria Kastriotou, Corinna Martinella April 10, 2017 LHC Collimation Working Group #216

Impact on equipment: EPC Sensitive systems and SEE cross sections in RRs (P1 and P5): FGC2: 120A (x72), 600A (x56) and 4-6-8 kA (x60): 1.5·10-10 cm2/unit Power: 600A (x56): 3.0·10-10 cm2/unit Roughly 17 R2E events estimated for 2017 (10x FGC2 + 7 power part) expected for 2017 with TCL6 closed settings (factor ~10 less for TCL6 open) Uncertainty related to equipment SEE cross section and count statistics Input from Yves Thurel and Slawosz Uznanski, TE-EPC April 10, 2017 LHC Collimation Working Group #216

Impact on equipment: QPS DS area mainly affected by open TCL6: between MQ8 and MBA9 Possibly sensitive equipment: nQPS crate, underneath MBB Therefore, hardly impacted by TCL6 settings And shown to be robust during 2015 ion-ion run Therefore, OK for TCL6 open settings Input from Reiner Denz, TE-MPE-EP April 10, 2017 LHC Collimation Working Group #216

LHC Collimation Working Group #216 Conclusions From an R2E perspective, operating with TCL6 open is preferred due to: The reduced radiation levels in the RRs and therefore reduced number of EPC failures leading to dump The acceptable increase in the DS radiation levels, mainly impacting MBA9 April 10, 2017 LHC Collimation Working Group #216

LHC Collimation Working Group #216 Extra slides April 10, 2017 LHC Collimation Working Group #216

Impact of TCL on DS cell 8, IP5 TCL6 closed April 10, 2017 LHC Collimation Working Group #216

LHC Collimation Working Group #216 DS levels in IP5 - left Symmetric as to what is seen in right side April 10, 2017 LHC Collimation Working Group #216

LHC Collimation Working Group #216 DS levels in IP1 - left Similar to P5, TCL6 in (as expected) April 10, 2017 LHC Collimation Working Group #216

LHC Collimation Working Group #216 DS levels in IP1 - right DS BLM peak around MBA9 not visible for P1 right April 10, 2017 LHC Collimation Working Group #216

LHC Collimation Working Group #216 Fill 5020 example TCL6 in roughly 30 min before luminosity start April 10, 2017 LHC Collimation Working Group #216