Vendor Definition of DAM Commitment

Slides:



Advertisements
Similar presentations
INSULATING PRICE RESPONSIVE LOAD FROM RUC CAPACITY SHORT CHARGE Mark W. Smith J. Kay Trostle August 2008 DSWG.
Advertisements

QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
March 13, 2013 Day-Ahead Market (DAM) Clearing Process follow-up from February WMS Matt Mereness, ERCOT Manager DAM & CRR.
RCWG Update to WMS April 9, VCMRR-VC for Cancellation of RUC Committed Resources Paragraph (3) of Nodal Protocol Section regarding Cancellation.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Split Generation Resources (SGRs) (Also known as Jointly Owned.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee February 7, 2008.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes January 28, 2009 WMS Meeting.
1 Settlement Changes R5 (SEP 2015) and R5.5 (OCT 2015) Blake Holt ERCOT COPS 9/14/2015.
Settlement of Mothballed RMR Resources for System Capacity November 15, 2011 RDTF Meeting Ino González ERCOT November 14, 2011.
Guidelines for Verification of Resource Specific Fuel Adders RCWG Paul Vinson.
Market Mitigation Concept Group Update Jim Galvin April 26, 2004.
Mitigated Offer Cap Presented to: NATF Date: September 29, 2009 By: Mark Patterson, Manager Market Operations Support (ERCOT) 1September 29 NATF Meeting.
E x p e r i e n c e C o m m i t m e n t SM ERCOT Nodal – Fuel Cost Analysis Verifiable Cost Working Group October 6, 2008.
Nodal Program Update and SEWG Update COPS 1/11/2011 Jim Galvin.
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
RCWG Update to WMS May 6, Real-Time Mitigation During Exceptional Fuel Events Option 3 – Increase MOC’s during Cold Weather Events When ERCOT.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
RCWG Update to WMS July 11, Alternatives to Address Negative Prices At its June meeting, WMS directed RCWG to bring back something to vote on. RCWG.
Lead from the front Texas Nodal 1 Texas Nodal Startup Eligibility Day-Ahead and RUC Make-Whole Settlements ERCOT Settlements & Billing.
7 August, 2006 TPTF MMS Issues Review Brandon Whittle Lead, Real-Time Market Operations.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Load Resources Negative RRS Bidding in the Nodal Market Credit Working Group January 30, 2008.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
TPTF Verifiable Cost Sub-group Summary Final Report 3/xx/2008 Jim Galvin- TPTF VC Sub-group Chair.
NPRR 617 Overview and Justifications. Overview Current protocols place restrictions on Day-Ahead Three-Part Supply Offers – Part 1 (Startup Offer) – capped.
TPTF Verifiable Cost Sub-group Summary Report to TPTF 1/21/2008 Jim Galvin- TPTF VC Sub-group Chair.
WMS Meeting, October 10, RCWG Continuing Efforts  NPRR 747 Price Correction No consensus on this issue  RCWG needs additional guidance on the.
DAM Self-Commitment Issues & Solutions Shams Siddiqi, Ph.D. (512) March 3, 2008.
DAM Self-Commitment Issues & Solutions, Part 2 Shams Siddiqi, Ph.D. (512) April 21, 2008.
RUC Startup Discussion. Problem The RUC language in the Nodal Protocols allows little or no ability for a generator to recover risk associated with operating.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs for Nodal WMS Meeting.
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs Process Settlement and Data Aggregation Working.
1 Nodal Stabilization Market Call December 16, 2010.
Utilization of Fuel Costs in Ercot Markets Ino González RCWG Meeting 2/24/2016.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Reliability Unit Commitment (RUC) Settlements Business Requirements.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Reliability-Must-Run (RMR) Cost Evaluation and Settlement Basis Ino González ERCOT RMR Workshop May 24, 2016.
1 February, 2012 QMWG S&B Protocol Clarifications QSE-Requested Decommitment of a DAM Commitment ERCOT Mandy Bauld.
Reliability Must Run Resources for Summer Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.
WRUC – Long Lead Time Commitments QSE Manager’s Working Group ERCOT Operations March 23, 2016.
Use of ONTEST Resource Status over Telemetry: – ERCOT protocol permits the use of telemetered Resource Status code “ONTEST” during periods of start-up.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
Fuel Cost Components in the Fuel Adder
Cutover Market Call November 29, :30 PM
Hourly Offers Schedule Update Examples
Exceptional Fuel Costs in LMP
Fuel Cost Components in the Fuel Adder
NPRR833 Workshop: Contingency Processing in CRR, DAM and SCED
ERCOT Market Design & Operations
Resource Cost Working Group
Current FRRS Language & Explanation of Posted Data
General Overview Of Resource Costs
Ancillary Service Trades and Ancillary Service Settlement
Real-Time Co-optimization of Energy & Ancillary Services
Real-Time Co-optimization of Energy & Ancillary Services
Resource Cost Working Group
The New Texas Wholesale/Retail Market
Sales Tax, Discounts, & Commission
Outline Energy demand and prices Reserves and new sources of energy supply.
Michael Daly Becky Gifford
Presentation transcript:

Vendor Definition of DAM Commitment Shams Siddiqi, Ph.D. shams@crescentpower.net (512) 263-0653 October 8, 2007

Outline of Presentation Problems with Vendor definition of “DAM Commitment” and its Solution Serious problem but Easy to fix – does not require any change to the Protocols Problems with using a single FIP/FOP percentage for both Startup and Minimum Energy caps Minor problem but may require a Protocol change to fix Missing FOP in Energy Offer Curve cap Minor problem requiring Protocol change October 8, 2007

Definition of “DAM Commitment” Vendor definition is “any award of Energy Offer Curve even if that offer is not part of a Three-part Offer” Correct definition is “award of Three-part Offer (eligible for Make-whole Payment)” Not defined explicitly anywhere, but correct definition implied in Protocols No change in Protocols or Requirements docs required for correct definition – however, may want to add as note in Requirements doc October 8, 2007

Protocols on “DAM Commitment” 4.4.9.1 (3) A QSE may submit an Energy Offer Curve without also submitting a Startup Offer and a Minimum-Energy Offer for the DAM and during the Adjustment Period, but only Three-Part Supply Offers are used in the RUC process. A QSE that submits an Energy Offer Curve without also submitting a Startup Offer and a Minimum-Energy Offer is considered not to be offering the Resource into the RUC, but that does not prevent the Resource from being committed in the RUC process like any other Resource that does not submit an offer in the RUC. 4.4.9.3 (5) For any hour that is a RUC-Committed Interval or a DAM-Committed Interval for a Resource, a QSE for that Resource may not change an Energy Offer Curve, except as specified in (a) and (b) below: Linked Energy and Ancillary Service offers are only allowed with Energy Offer Curves (and not with DAM Energy-only Offers) October 8, 2007

Problems of Vendor definition Say a unit is in the money and you want the DAM to choose the last 50MW as either Energy or AS (whichever is more profitable) If QSE submits Energy Offer Curve (EOC) with linked AS offers and QSE is awarded in DAM, QSE cannot change the EOC (so QSE’s 500MW unit would be offered at cap) Only way around this is to offer entire unit in DAM and buy back 450MW This is problematic because – (1) it has large credit implications; (2) may be perceived as a “wash trade”; and (3) may have tax implications for some October 8, 2007

Solution to “Commitment” Issue Adopt the correct definition of DAM Commitment: “Award of Three-part Offer that is eligible for Make-whole Payment” October 8, 2007

Single FIP/FOP % Problem 4.4.9.2.1 Startup Offer and Minimum-Energy Offer Criteria (f) Percentage of FIP to the extent that the startup and minimum energy will be supplied by gas to determine the offer cap; and (g) Percentage of FOP to the extent that the startup and minimum energy will be supplied by oil to determine the offer cap. Coal unit could startup using Oil but run using coal Solution: Separate FIP/FOP percentages for Startup and Minimum Energy October 8, 2007

Missing FOP in Energy Offer Cap 4.4.9.3.3 Energy Offer Curve Caps for Make-Whole Calculation Purposes Only has FIP in calculating Caps; but FIP/FOP percentage specified when submitting Energy Offer Curves Solution: Include “Fuel Index Price (FIP) or Fuel Oil Price (FOP), as specified in the Energy Offer Curve” language in 4.4.9.3.3 similar to language in Mitigated Offer Cap 4.4.9.4.1 October 8, 2007