Revision reflects an evolution, not a revolution

Slides:



Advertisements
Similar presentations
Roadmap for Sourcing Decision Review Board (DRB)
Advertisements

1 May 2009 ver. 5.5 Materiel Development Decision (MDD) MDA: Approves AoA Study Guidance Determines acquisition phase of entry Identifies initial review.
“Common Process for Developing Briefings for Major Decision Points” INSTRUCTIONS Provide Feedback via to: Lois Harper PEO C4I and Space
Small Projects & Tailoring Using the PPA 1:15 – 2:15 Teresa Kinley, OPHPR With Panelists: Susan Wilkin, NCCDPHP Andy Autry, NCBDDD Carol Waller, NCEH/ATSDR.
ENVIRONMENTAL MANAGEMENT PLAN
Iterative development and The Unified process
LRFS Info Brief for LCL FIPT
OASD Logistics and Materiel Readiness
Organization Mission Organizations That Use Evaluative Thinking Will Develop mission statements specific enough to provide a basis for goals and.
OASD Logistics and Materiel Readiness
DEVELOPMENTAL TEST & EVALUATION DT&E – From Concept to Combat Integrated Test Process Darlene Mosser-Kerner Developmental Test & Evaluation OUSD(AT&L)/Systems.
Regional Policy Common Strategic Framework The Commission's revised proposal for the CPR - COM (2012) 496 of 11 Sept.
Chapter 6 Supporting Knowledge Management through Technology
1 Update to the Coordinated Human Service Transportation Plan for the National Capital Region Beth Newman Transportation Planner Item 11 December 16, 2009.
0 Office of Performance Assessments and Root Cause Analyses (PARCA) PARCA EVM Update Presenter: Phone:
Human Resources Management Out of Cycle Certification Personnel and Readiness Information Management Human Resource System MARCH 2015 NOTE: This document.
Life Cycle Logistics.
H&PE New Curriculum, New Approach Health & Physical Education Department - TCDSB.
1 1 Defense Acquisition Guidebook Progress Update March 27, 2012.
United States Agency for International Development Bureau for Global Health Office of Population and Reproductive Health Policy Update.
| 1 Weapon System Acquisition Reform- Product Support Assessment DAU SYMPOSIUM 13 April 2010 Presented by: Basil Gray Where Innovation.
WMO Regional WIGOS Implementation Plan (R-WIP-I) I.Zahumensky.
Implementing Program Management Standards at Duke Energy.
NFM: Modular Template Measurement Framework: Modules, Interventions and Indicators LFA M&E Training February
Module 9: Transition and Exit Strategy ASEAN Training of Trainers (TOT) on Disaster Recovery.
MIL-HDBK-502A, “Product Support Analysis”
Supportability Design Considerations
Life Cycle Logistics.
Workplace Projects.
Johann ZIRNGIBL CSTB / France
MDD to Milestone A Requirements Management Activities
DAG Chapter 4 Systems Engineering Design Considerations
ISA 201 Intermediate Information Systems Acquisition
Performance-Based Logistics
CBHDA Small Counties Strategic Planning Meeting Operationalizing the Medicaid Managed Care Final Rule May 18, 2017.
MODULE 7 Creating the Facility Software Surveillance Plan (SSP)
The Orientation Toolkit for CARE Offices
PSM Lessons Learned Background
11 ii. Develop a plan for aDSM
Software Project Management
Milestone A to Milestone B Requirements Management Activities
the actual procurement
ISA 201 Intermediate Information Systems Acquisition
ISA 201 Intermediate Information Systems Acquisition
ISA 201 Intermediate Information Systems Acquisition
Purpose Provide an update on recent major changes to law, policy, and guidance that affect the way we conduct IA&E activities National Defense Authorization.
Targeted District Review Report
Life Cycle Cost View Program Acquisition Cost Procurement Cost
Lesson 4 Systems Engineering Plan Exercise Team #
2014 Developing Competencies for HR Success
MDD to Milestone A Requirements Management Activities
Steering Committee Meeting
Defense Business Systems (CLE077) Sprint
DAU Acquisition Training Symposium April 3, 2018
A B C Solution Analysis Technology Maturation & Risk Reduction
Part C State Performance Plan/Annual Performance Report:
Software Project Management
Planning and Implementing a Service Project
API 17Q – Subsea Equipment Qualification
Portfolio Committee On Sports and Recreation 7 November 2017
Joint WG on Guidance for an Integrated Transport and Storage Safety Case for Dual Purpose Casks TM TM to Produce Consolidated Drafts of the IAEA’s.
Career Portfolios C. Dixon
PROJECT DOCUMENTATION
Approaches to Implementing in Your Organization
CS 8532: Advanced Software Engineering
AFLCMC/LG-LZ “Did You Know"?
Progress Report on proposed GUID on Information TECHNOLOGY Audit
Second Avenue Subway Project Execution Strategy
Purpose Provide an update on recent major changes to law, policy, and guidance that affect the way we conduct IA&E activities National Defense Authorization.
Presentation transcript:

Revision reflects an evolution, not a revolution LCSP Outline v2.0 Revisions are made to: Reflect new statute/policy Incorporate lessons learned Clarify guidance Expand the Funding section to include O&S Cost Estimates, Should Cost Initiatives, and Affordability Stress the tailorability of the document Introduce “Critical Thinking Questions” Reference appropriate DAG sections (future) Plan is to make the LCSP outline stable (ie, update infrequently), while the DAG will evolve to capture new content, best practices, lessons learned, etc. (12-18 month content review). Revision reflects an evolution, not a revolution

Comparison of LCSP Outlines LCSP Outline v1.0 (2011) Introduction Product Support Performance Product Support Strategy Product Support Arrangements Product Support Package Status Regulatory/Statutory Requirements Influencing Product Support Integrated Schedule Funding Management Supportability Analysis Additional Sustainment Planning Factors LCSP Annexes LCSP Outline v2.0 (2017) Introduction Product Support Performance Product Support Strategy Product Support Package Status Design and Sustainment Requirements Integrated Schedule Cost and Funding Management Supportability Analysis LCSP Annexes Incorporated into Section 3 Section renamed Expanded into Cost and Funding to include O&S cost estimates, Should Cost Initiatives, and Affordability Strategy What's Driving What’s Done Where Performance Measures Weapon System Supply Chain Programmatics Requirements -> Contract Management Approach Implementation Status Schedule Reviews Test Results Financial Funding Should Cost Critical thinking questions added to illustrate the thinking required to ensure that sustainment planning is comprehensive, cohesive, and actionable.

Implementation ASD(L&MR)Memo to the Components Review and Approval process unchanged from DoDI 5000.02 (Enclosure 1, Table 2) Timeline New programs and programs in acquisition: Decision reviews more than 9 months away must transition to revised outline Decision review less than 9 months away, may use 2011 outline but must transition to revised outline for subsequent decision reviews Programs in sustainment are not required to transition their sustainment planning document to the revised outline format.