July 2, 2007 ID week @ CERN S. Terada KEK Module and Service Structure Designs -Super module conceptual design- - FEA thermal analyses- -Test of angled.

Slides:



Advertisements
Similar presentations
Development of super module structures at Glasgow Calum I. Torrie 20 th April 2007.
Advertisements

Detector module development for the CBM Silicon Tracking System Anton Lymanets for the CBM collaboration Universität Tübingen, Kiev Institute for Nuclear.
General needs at CERN for special PCB’s Philippe Farthouat CERN.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
R&D of module and service structure -Super module concept - Takashi Kohriki.
Outer Stave Prototype Update E. Anderssen, M. Cepeda, M. Garcia-Sciveres, M. Gilchriese, N. Hartman, J. Silber LBNL W. Miller, W. Shih Allcomp, Inc ATLAS.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
Mechanical Work Plan Discussion Bill Cooper Fermilab.
M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna
ATLAS Tracker Upgrade Stave Collaboration Workshop Oxford 6-9 February 2012 ABC 130 Hybrid.
D. Lissauer, BNL. 1 ATLAS ID Upgrade Scope R&D Plans for ATLAS Tracker First thoughts on Schedule and Cost.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
M.Oriunno, SLAC Stave cable and module options. M.Oriunno, SLAC Background - module The IBL electrical unit for data output is a single chip The use of.
— Test board for CBM01B2 baby detectors — Anton Lymanets & Johann Heuser CBM collaboration meeting GSI, 27 February 2008 Microstrip detector testing at.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Y. Ikegami, T. Kohriki, S. Terada Y. Unno (KEK), K. Hara (Univ. of Tsukuba) G. Barbier, F. Cadoux, A. Clark, D. Ferrere, S. Gonzalez-Sevilla, D. La Marra,
1 Engineering issues for FPCCD VTX Detector Y. Sugimoto KEK July 24, 2007.
Low Mass Rui de Oliveira (CERN) July
The Mechanical Structure for the SVD Upgrade
Stave Hybrid/Module Status. Modules Stave Module Building 2 Mechanical Chip Gluings Mechanical Wirebonding Electrical Chip Gluings Electrical Wirebondings.
Neil Jackson University of Liverpool Hiroshima Symposium June THE ATLAS SEMICONDUCTOR TRACKER (SCT) A PRESENTATION ON BEHALF OF THE ATLAS.
End-of-stave region. 2 Space Z-dimension is critical –Keep gap small (might help getting rid of stubs) Edge of last barrel silicon (at corner) is 1277.
Simon Kwan - FermilabCMS Tracker Upgrade Workshop – June 3, Update on the Phase 1 FPIX Half Disk Design Simon Kwan Fermilab on behalf of the USCMS.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
PH/DT2 Scientific Tea PH-DT2 Scientific Tea, 29 April 2005 : The CMS Tracker - Mechanical Aspects Antti Onnela, PH-DT2: 1. CMS Tracker and.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
25/02/2010 Y. Ikegami, KEK Advanced Silicon Radiation Detectors, Manchester1 Development of silicon strip-module for very high radiation environment G.
News on Mechanical Design Dirk Wiedner July /4/20121Dirk Wiedner Mu3e meeting Zurich.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
SLHC SCT Hybrid (CERN 2nd July 2007)1 SLHC SCT Hybrid Concept Ashley Greenall The University of Liverpool.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
14-oct-2014 GEM detector configuration 1 12 stations: Z = 30 – 45 – 60 – 80 – 100 – 130 – 160 – 190 – 230 – 270 – 315 – 360 Stereo angles: 0 – 7.5 deg.
01/10/2009 Y. Ikegami, KEK RD09, Florence1 Development of low-mass, high-density, hybrid for the silicon microstrip sensors in high track density environment.
FPIX Upgrade – Status of CO 2 Cooling Studies S.Grünendahl, FNAL for the FPIX Upgrade Mechanical Group H. Cheung, G. Derylo, S.G., S. Kwan, C.M. Lei, E.
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
Upgrade plans for ATLAS. Nigel Hessey (Nikhef) is overall ATLAS upgrade coordinator.
EC: 7 DISK concept Preliminary considerations
October 2014Silicon Pixel Tracker – Chris Damerell 1 Tracking sensor, one of 12,000, 8x8 cm 2, 2.56 Mpixels each Matching endcaps (only one layer shown)
Stave thermal analysis Cooling connections CO2 warm Test
The STS-module-assembly:
SVD Electronics Constraints
ATLAS Internal ID Service Integration
Progress with System Integration of the CBM Silicon Tracking Detector
T. Bowcock University of Liverpool
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
Grid Pix Field Simulations and precision needed for a module
Local Supports for Inclined Layout: CERN Update
Hybrid Pixel R&D and Interconnect Technologies
? ENDCAP: Mechanics IFIC-Valencia.
Sensor Layout Options Aim is to understand the implication and constrains of possible sensor design/layout on the general ID Layout. Keep both ATLAS “drum”
WP9 ITS Mechanics and Cooling
End Cap.
LumiCal mechanical design, integration with LDC and laser alignment
Phase 2 Outer Tracker Module analysis
Services Layout – Update
Adapting the via last Design
2S module geometry updates Module positioning concepts
Rod adaptors for module tests Module positioning studies
Hybrid Mechanical/Thermal Design ideas
HCAL Modules -First Ideas
Mimosa18 on PCB (from the chip side)
アトラスシリコン半導体飛跡検出器:ATLAS Silicon-strip Tracking Detector
Neutron guide Shielding Concept
Recent updates to the 2S module geometry Towards first dummy modules
Updates on the Silicon Tracker 2S Module
Presentation transcript:

July 2, 2007 ID week @ CERN S. Terada KEK Module and Service Structure Designs -Super module conceptual design- - FEA thermal analyses- -Test of angled wire bonding- Japanese SCT group

Super module concept Basic concept is to mount the modules on to cylinder Fabricate and test individual modules Thin module - front-back correlation Overlapping geometry without sensitive gap Failed module is replaceable Make a row of modules into a unit with super-frame Unit is testable with cooling loops included Cooling might be required in both sides Make the cooling pipe to slide so that the move of the pipe should not be transmitted to the module Mass of the super-frame could be compensated with elimination of dog-legs of the service harness reduction the number of brackets - slender and one per two modules Carbon-carbon cooling blocks instead of Al blocks length of the cooling pipe is twice, but compensated with smaller diameter and no solder (of the cooling block)

Four hybrids/module, four connectors/module Square sensors (9 Four hybrids/module, four connectors/module Square sensors (9.754 cm x 9.754 cm)

Two hybrids/module, two connectors/module

Hybrid - Conceptual layout

Hybrid-Service connection Mass reduction in the connection (1)Not to use a connector,two methods: (a)direct soldering,no Al conductor (b)wire-bonding,thick wire,with reinforcement (2)Use a miniature connector,three methods: (a)ZIF FPC-connector (b)Low-profile PCB-PCB connector(a la PIXEL) (c) Low-profile PCB-PCB connector(a la SCT) Note:all are similar once a reinforcement piece is included (3)Reduce the number of connectors (a)4 connectors/module(2 connectors x2 sides) (b)2 connectors/module(1 connectors x2 sides)

SuperModule

SuperFrame

SuperModule - expanded

End view at Z=0

End view at end

Bracket on cylinder

SuperModule on cylinder

SuperModule installation

FEA thermal analyses using ANSYS (2-dimensional calculation) • 0 FEA thermal analyses using ANSYS (2-dimensional calculation) • 0.1mm thick thermal grease around cooling pipe (2W/m/K) •Dead air between sensor and hybrid (0.024W/m/K)

sLHC 

Next step Calculation/estimation of the diameter of the cooling pipe More realistic 3-D thermal and mechanical FEA calculations Design of the service cables/harness Number of traces, including DCS Investigation of the connectors in industry Minimization of parts Tabulation of materials, comparison Design of the hybrids Manufacturing of the super-frame model for mechanical and thermal measurements Optimization of 3rd mounting points

Test of Angled Wire Bonding Company: HAYASHI Precision Electric Co., Ltd Bonding machine: K&S8060 Wire: Al/Si(1%). ø25µm Bonding tool: K&S 4WFM6-2015-T6F-M00 Dummy sensor: ATLAS98, 80µm strip pitch Dummy ASIC 55µm pitch Al. pad on Si. substrate Level difference: 1.850.05mm 1st.Bond: Dummy ASIC 2nd.Bond: Dummy sensor

Test of Angled Wire Bonding Test piece L=3.3mm L=4.3mm L.D=1.85mm

Test of Angled Wire Bonding Max. bonding angle Dummy ASIC 0.0551287.04mm Dummy sensor 0.0812810.24mm (10.247.04)21.6mm L=3.3mm  tan-1(1.6/3.3)25.9 L=4.3mm  tan-1(1.6/4.3)20.4

Test of Angled Bonding L1=3.3mm, L2=4.0mm Max. angle = 26° Good loop shape 1st bond: OK 2nd bond:  need to keep weld width to be narrower than 1.5 times wire diameter 2nd bond on sensor 1st bond on ASIC

Test of Angled Bonding L1=4.3mm, L2=5.0mm Max. angle: 20.4° Good loop shape 1st bond: OK 2nd bond: OK 2nd bond on sensor 1st bond on ASIC

Test of Angled Bonding mean r.m.s. Pull values All wires broke at the neck of the 1st bond

Test of Angled Bonding Sensor with 74.5µm strip pitch (ATLAS07) ASIC 0.0551287.040mm Sensor 0.07451289.536mm (9.5367.040)21.248mm Max. angle of L=3.3mm: tan-1(1.248/3.3) 20.7 Max. angle of L=4.3mm: tan-1(1. 248/4.3)16.2 Adding ASIC positioning accuracy of 0.2mm 1. 2480.21.448mm Max. angle of L=3.3mm: tan-1(1. 448/3.3)23.7 Max. angle of L=4.3mm: tan-1(1. 448/4.3)18.6(L=4.1mm: 19.5)  L=4.3(4.1)mm OK (less than 20.4)

Test of Angled Bonding Summary Wire bonding of L1=4.3mm, L2=5.0mm, level diff.=1.85mm, max. angle= 20.4° was tested to be OK. Considering a positioning accuracy of ASIC = 0.2mm, sensor strip pitch of 74.5µm (ATLAS07), taking a bond length of L=4.3mm, max. bonding angle becomes 18.6, or L=4.1mm, max. angle becomes 19.5.  OK (less than 20.4) Width of the 2nd bond weld should be narrower than 1.5 times the wire diameter. (minimum=~1.2)