The UniBoard A RadioNet FP7 Joint Research Activity, 9 partners

Slides:



Advertisements
Similar presentations
Beamformer implementations (Mike Jones, Kris Zarb Adami, David Sinclair, Chris Shenton) Starting with top level considerations for now, ie Not, which FPGA.
Advertisements

Griffin Single Station Correlator(UNI)
Onsala Space Observatory Present status and technical directions of the EVN Michael Lindqvist Onsala Space Observatory, Sweden Arpad.
DATA TRANSMISSION SYSTEM MIKE REVNELL. OUTLINE Top level specifications Basic architecture Fiber plant DTS module Digitizers Formatter Deformatter Transition.
PELICAN Imaging Framework Imaging on short timescales leads to very large correlator output data rates. In order to cope with these rates and produce updated.
BDT Radio – 2b – CMV 2009/10/09 Basic Detection Techniques 2b (2009/10/09): Focal Plane Arrays Case study: WSRT System overview Receiver and.
Signal Processing for Aperture Arrays. AAVS1 256 antenna elements distributed over –4 stations –64 elements each.
DBBC3 Development - Digital Base-Band Converter 3
Dec 2010 AAVP Cambridge workshop AAVP AAVS1/2-low demonstrators Jan Geralt Bij de Vaate.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Digital Signal Processing.
Only Sky is a limit, So lets the real job start S. Pogrebenko, , &
Status of Korean Participation in the SKA Project Minho Choi (KASI) SKA Japan Workshop NAOJ, Mitaka.
ASKAP Signal Processing Overview DIFX Users and Developers Meeting
SKA Introduction Jan Geralt Bij de Vaate Andrew Faulkner, Andre Gunst, Peter Hall.
Road to MeerKAT KAT-7 DBE Alan Langman. meerKAT Overview Objectives of meerKAT Location Location Location MeerKAT Engineering Specification Prototypes.
Simulations of Beamforming Algorithms Stelio Montebugnoli, IRA-INAF, Medicina (BO), Italy, Giovanni Naldi, IRA-INAF, Medicina.
XNTD/SKAMP/LFD Correlator 4th RadioNet Engineering Forum Workshop Next Generation Correlators for Radio Astronomy and Geodesy June 2006, Groningen,
The BEST-2 SKA pathfinder is composed by 32 receivers. The front ends are installed on the focal lines of 8 cylinders, offering a collecting area of about.
Casper Signal Processing Workshop 2009 SKA Signal Processing (Preliminary) Wallace Turner Domain Specialist for Signal Processing.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
RadioNet3 & SKA Franco Mantovani Project Scientist RadioNet3 Max-Planck-Institut für Radioastronomie, Bonn Istituto di Radioastronomia - INAF, Bologna.
© ASTRON On the Fly LOFAR Station Correlator André W. Gunst.
Field Trials of an RFI Adaptive Filter for Pulsar Observations M. Kesteven, R.N. Manchester, G. Hampson & A. Brown Australia Telescope National Facility.
AAVS processing: Uniboard implementation. UNIBOARD Jive led FP7 project UniBoard, high integration density >> processing / m3
RFI Mitigation at Westerbork: algorithms, test observations, system implementation Willem Baan, Peter Fridman & Rob Millenaar.
Review of developments in Australasia and mainland Asia Steven Tingay Swinburne University of Technology Next Generation correlator meeting, JIVE 27 -
A real-time software backend for the GMRT : towards hybrid backends CASPER meeting Capetown 30th September 2009 Collaborators : Jayanta Roy (NCRA) Yashwant.
Netherlands Institute for Radio Astronomy 1 CSP SKA-low correlator meeting, Dwingeloo, 24 – 27 November 2014 RadioNET3 WP8 RadioHDL: FPGA Firmware Development.
TOG, Torun, April 2009 Arpad Szomoru, JIVE EVN/JIVE Technical developments.
UniBoard Meeting, October 12-13th 2010 Jonathan Hargreaves, JIVE EVN Correlator Design UniBoard Meeting, October th 2010 Contract no
The UniBoard a RadioNet FP7 Joint Research Activity Arpad Szomoru, JIVE.
Engineering Commissioning May 2016 SKA1 LOW – Assembly, Integration & Verification Adam MacLeod AIV Consortium Manager & ASKAP System Engineer.
What is FABRIC? Future Arrays of Broadband Radio-telescopes on Internet Computing Huib Jan van Langevelde, JIVE Dwingeloo.
Netherlands Institute for Radio Astronomy 1 APERTIF beamformer and correlator requirements Laurens Bakker.
Netherlands Institute for Radio Astronomy 1 Bits & Chips - Smart Systems, November 20th 2014 DSP & UniBoard Astron Hajee Pepping.
Netherlands Institute for Radio Astronomy 1 ASTRON is part of the Netherlands Organisation for Scientific Research (NWO) Board Design Gijs Schoonderbeek.
Netherlands Institute for Radio Astronomy 1 ASTRON is part of the Netherlands Organisation for Scientific Research (NWO) Square Kilometer Array Low Central.
JIVE UniBoard Correlator External Review
UniBoard: Xilinx or Altera
Digital Receivers for Radio Astronomy
Technical Operations and R&D at JIVE
Low Cost Radar and Sonar using Open Source Hardware and Software
Digital readout architecture for Velopix
Mid Frequency Aperture Arrays
ASKAP High Time Res Capabilities
Mark 5 / VLBA Correlator Topics
EXPReS, NEXPReS, UniBoard
RadioNet FP7 Joint Research Activity
The UniBoard Generic Hardware for Radio Astronomy Signal Processing
Signal Processing for Aperture Arrays
LFD Correlator MWA-LFD Kick-off Meeting San Diego 5-June-2006
Phased Array Feeds Wim van Cappellen
The Development of Broadband VLBI Technologies in SHAO
JIVE UniBoard Correlator (JUC) Firmware
UniBoard2 applied in the Square Kilometer Array
ECE 448 Lecture 6 Finite State Machines State Diagrams vs. Algorithmic State Machine (ASM) Charts.
May 2003 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3a-Wisair contribution on multi band implementation]
The Uniboard  FPGA Processing for Astronomy
UNIBOARD : VLBI APPLICATION CHARACTERIZATION
Aperture Array Simulations
Progress on EXPreS at JBO Ralph Spencer
The e-EVN Arpad Szomoru, JIVE.
Realizing an universal digital processing platform
Correlator Growth Path
New DCM, FEMDCM DCM jobs DCM upgrade path
DBBC Stutus Report November 2007
ECE 448 Lecture 6 Finite State Machines State Diagrams vs. Algorithmic State Machine (ASM) Charts.
Advanced Radio Astronomy in Europe Contract no.:
Multiprocessors and Multi-computers
Multiprocessor System Interconnects
Presentation transcript:

The UniBoard A RadioNet FP7 Joint Research Activity, 9 partners Multi-purpose, scalable, high performance, generic interfaces (10GE, DDR3) Per board: 8 Altera Stratix IV FPGAs (40 nm), 2  16  10 Gbps, each front node to all back node mesh (more info: see poster) JIVE: project lead, ASTRON: hardware development KASI, INAF, ShAO, Universities of Bordeaux, Orléans, Manchester, Oxford: various applications Prototype undergoing tests now Currently under development: VLBI correlator (JIVE), digital receiver (INAF, BORD), pulsar binning machine + RFI mitigation (UMAN, UORL) Coming soon: APERTIF correlator + beam former (ASTRON), all-station LOFAR correlator (ASTRON + University of Amsterdam, Oxford), more applications on the way huib 08/06/10 Contract no. 227290 /28

SKA-like configurations Corner turning done in network 256 telescope correlator, 1GHz, 2 pol, 8 bits Could be built now using existing hardware (infiniband switches) 320 UniBoards, 16 switches Future scalability depends on capacity of future switches huib 08/06/10 /28

SKA-like configurations (2) Combination of UniBoards into larger systems via backplane Will be developed through NWO-funded ExBox project (JIVE-ASTRON collaboration) Application in APERTIF (ASTRON) Correlator for 12 dual pol dishes, 300 MHz bandwidth, 37 beams 32 UniBoards Application in AARTFAAC (University of Amsterdam-ASTRON collaboration) Correlator for 576 signal paths, ~ 17.5 MHz bandwidth 12 UniBoards APERTIF correlator huib 08/06/10 /28

Next: UniBoard2 Possible Joint Research Activity in RadioNet3, follow-up of current project, start date 2012 (if approved by EC...) Received strong support from RadioNet community Same basic idea, development of generic hardware complemented by a number of applications Consolidate and build on expertise obtained through UniBoard project Strong emphasis on power efficiency (green computing) Production-ready in 2015/2016 Complete re-design, using the next generation 28 nm FPGAs, possibly one generation beyond that (some slack in start date of project) Non-leaded components Possible use of 40GE, 100GE Investigation into effects of hard-copy and partial hard-copy Tuning of algorithms and firmware design to minimize power consumption Balancing of system parameters and performance to minimize power consumption Standardized interfaces and coding conventions to facilitate sharing and re-use of firmware blocks among developers of different applications huib 08/06/10 /28

Useful milestones End of 2010, a well-documented power-consumption budget for the UniBoard Mid-2011 (after implementation of correlation and digital receiver design) , a report on the suitability of the specific FPGAs we have chosen (size, number of DSPs, amount of logic) and implications for a SKA implementation Report on the computing demands posed by different configurations and implications for hardware platform (length of baseline, frequency, number of bits, field of view vs. frequency smearing, bandwidth smearing) huib 08/06/10 /28