Uppsala Commitment to ESS and FREIA Planning

Slides:



Advertisements
Similar presentations
Thomas Parker, Head of Energy Division Responsible Renewable Recyclable Thomas Parker October 2013.
Advertisements

RF Development for ESS at Uppsala University
ESS linac Mats Lindroos, Cristina Oyon and Steve Peggs.
Roger Ruber, Volker Ziemann, Gergana Hamberg Uppsala University
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS TAC Lund, 8 July 2010 Roger Ruber (Uppsala University) for the ESS Linac RF Team.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
The ESS ADU project Mats Lindroos Head of the ESS Accelerator Division Lund,
H. Herzog, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN LARGE SCALE CRYOGENIC.
Introduction and Charge to the Review of ESS Target building and Instrument Hall design requirements Roland Garoby November 2014, Lund
Test Stands Roger Ruber Uppsala University ESS TAC4 16 Feb
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
STF Plan & Schedule H. Hayano, KEK. Superconducting RF Test Facility Comprehensive Test Facility dedicated to ILC SC-RF R&D (expandable to FEL, ERL) for.
Workshop on cryogenic and vacuum sectorisations of the SPL CERN, 9 th -10 th November 2009 Workshop Organisation and Goals Vittorio Parma TE-MSC.
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
Anders Sunesson RF Group ESS Accelerator Division
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
News from ESS Cristina Oyón, Mats Lindroos, Steve Peggs November 2009.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
Preliminary Functional Analysis of ESS Superconducting Radio-Frequency Linac C. Darve, N. Elias, J. Fydrych, D. Piso European Spallation Source ESS AB,
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Copyright © 2015 SCKCEN ADS accelerator developments presently on-going for MYRRHA and possibly for the Chinese-ADS Dirk Vandeplassche 1 Eucard-2 — APAE.
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
Status of the SPL study R. Garoby – 25/11/2010 Fifth SPL Collaboration Meeting November 2010 / CERN.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS/SPL Collaboration Meeting Lund, 29 June 2010 Roger Ruber (Uppsala University) for the ESS.
J. G. Weisend II for the ESS Team Energy Efficiency & Recovery at ESS.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
FREIA: HIGH POWER TEST STAND Rutambhara Yogi & FREIA Group ESS RF Group Unit Leader for Spoke Power and RF Distribution FREIA Group Unit Leader, Uppsala.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
H. Danared | Collaboration Board | Page 1 Status of In-Kind Contributions Håkan Danared Legnaro, 1 December 2014.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Chapter Editor: John Weisend TDR Chapter 6 Cryogenic System, Vacuum System & Test Stands.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
Operation Status of the RF Systems and Taiwan Photon Source
WP High Beta Cavities Delivery
Cryogenics at the European Spallation Source ESS
WP5 Elliptical cavities
Overview and System Design for ESS LLRF Systems
Accelerator Research and Innovation for European Science and Society
Ideas for medium and long term facility upgrade Roberto Corsini for the CLIC Accelerator Collaboration.
Hosting Orsay Walid KAABI
Sébastien Bousson (CNRS-IN2P3-IPN Orsay)
WP11: electron and proton beam testing
Test plan of ESS HB elliptical cavity
ESS RF Development at Uppsala University
Superbeams with SPL at CERN
recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA
Optimum cryomodule length at the ESS
Collaboration Board Meeting Closing Hasan Padamsee
ADS Accelerator Program in China
IHEP ILC Cavity Status Jiyuan Zhai (IHEP)
Cryomodules Challenges for PERLE
CLIC Feasibility Demonstration at CTF3
RF introduction Anders Sunesson RF group leader
Roger Ruber for the FREIA team 11 June 2013, Uppsala
Facility for Research Instrumentation and Accelerator Development
Presentation transcript:

Uppsala Commitment to ESS and FREIA Planning Roger Ruber for the FREIA team Dept. of Physics and Astronomy Uppsala University

Accelerator Physics at Uppsala University Concentrating on RF and instrumentation … Cyclotron (since 1948) CELSIUS ring (1984 – 2006) CTF3 / CLIC Two-beam Test Stand & RF breakdown issues FP6-EuroTeV, FP7-EuCARD NorduCLIC FEL FLASH Optical Replica Synthesizer, XFEL Laser Heater Stockholm-Uppsala FEL Centrum ESS RF systems 02-Jul-2012 Roger Ruber - ESS Commitment and FREIA Planning

The European Spallation Source (ESS) Lund, Sweden, next to MAX-IV 17 member states 5 MW pulsed neutron source 14 Hz rep. rate, 4% duty factor >95% reliability for user time Cost estimates (2008 prices) 1,5 G€ / 10 years 50% by Sweden, Denmark, Norway Time frame: 2019 first neutrons 2019 – 2025 consolidation and operation 2025 – 2040 operation High intensity allows studies of complex materials, weak signals, time dependent phenomena 02-Jul-2012 Roger Ruber - ESS Commitment and FREIA Planning

ESS Time Line for Construction Uppsala RF development 02-Jul-2012 Roger Ruber - ESS Commitment and FREIA Planning

ESS RF Systems single pass linear proton accelerator 5 MW p+: 50 mA, 2.5 GeV, 14 Hz, 2.86 ms < 1 W/m losses 95% user beam time reliability ~200 RF systems (352 + 704 MHz) NC or SC accelerating cavity RF source, amplifiers, distribution, controls auxillary systems cryogenics, water and air cooling 02-Jul-2012 Roger Ruber - ESS Commitment and FREIA Planning

Why RF Development and Testing? Validation technical design and performance validation under close-to-realistic conditions ensure reliability & contingency ease of installation & maintenance Optimization technical design improve cost, energy and resource effectiveness for construction & operation Acceptance testing of series components RF system: power source, amplifiers, distribution and controls complete cryomodules with multiple cavities & components Training of staff participate in testing to prepare for operation 02-Jul-2012 Roger Ruber - ESS Commitment and FREIA Planning

ESS-UU Collaboration 2009 ESS has need for R&D and test stand, but small staff, no buildings, existing test stands occupied start discussion with UU on 704 MHz RF development proposal for ESS dedicated test facility at UU 2011 Spring: ESS-UU contract on 704 MHz RF R&D ESS changes to 14 Hz rep rate, 2.89 ms beam pulse Fall: ESS changes pulse modulator strategy → delays UU test stand 2012 UU starts work on 352 MHz RF for spoke resonators spoke resonators require new power source development spoke resonators have never been used in an accelerator maintain compatibility with 704 MHz development 02-Jul-2012 Roger Ruber - ESS Commitment and FREIA Planning

UU Responsibility for ESS Accelerator Contribution to the Technical Design Report (WP8) design concept 352 MHz spoke source design concept RF distribution Contribution to the construction planning effort (WP19) survey test stand infrastructure and requirements study of upgrade scenarios RF systems for ESS power upgrade Development 352 MHz RF power amplifier for spokes (WP19) 1st prototype, soak test with water load and SRF spoke resonator, incl. LLRF RF system test prototype spoke cryomodule (WP19) high power test with 2nd RF power amplifier and LLRF Acceptance testing spoke cryomodules (under discussion) for all final cryomodules before installation Development klystron pulse modulator (under discussion) full soak test incl. klystron and RF system, if available with SRF cavity 02-Jul-2012 Roger Ruber - ESS Commitment and FREIA Planning

Where do we fit in … 02-Jul-2012 Roger Ruber - ESS Commitment and FREIA Planning

FREIA Facility for Research Instrumentation and Accelerator Development Cryogenic centre (kryocentrum): liquid helium and liquid nitrogen production and distribution horizontal test cryostat RF test stands (ESS RF development) 352 MHz RF source prototyping for ESS spoke cavities spoke cryomodule prototyping and acceptance testing at full power General infrastructure small workshop with “clean” room (preparation vacuum chambers) control room for operation cryo plants, RF systems and experiments concrete bunkers for RF and neutron experiment stations 02-Jul-2012 Roger Ruber - ESS Commitment and FREIA Planning

How? space new 1000 m2 FREIA hall electricity, air conditioning, water cooling cryogenic cooling (LHe) new 100 l/h liquefier radiation protection shielding (neutrons, X-rays) specific test equipment cryostat RF power people accelerator group TSL FREIA 02-Jul-2012 Roger Ruber - ESS Commitment and FREIA Planning

Construction Progress 1 July 2013 25 June 2012 14 May 2012 02-Jul-2012 Roger Ruber - ESS Commitment and FREIA Planning

Dependencies and Deliverables 02-Jul-2012 Roger Ruber - ESS Commitment and FREIA Planning

FREIA Planning 02-Jul-2012 Roger Ruber - ESS Commitment and FREIA Planning