Tim Barrass Split ( ?) between BaBar and CMS projects.

Slides:



Advertisements
Similar presentations
CMS Applications – Status and Near Future Plans
Advertisements

Status Report University of Bristol 3 rd GridPP Collaboration Meeting 14/15 February, 2002Marc Kelly University of Bristol 1 Marc Kelly University of Bristol.
B A B AR and the GRID Roger Barlow for Fergus Wilson GridPP 13 5 th July 2005, Durham.
12th September 2002Tim Adye1 RAL Tier A Tim Adye Rutherford Appleton Laboratory BaBar Collaboration Meeting Imperial College, London 12 th September 2002.
13th November 2002Tim Adye1 RAL Tier A Status Tim Adye Rutherford Appleton Laboratory BaBar UK Collaboration Meeting University of Bristol 13 th November.
Grid in action: from EasyGrid to LCG testbed and gridification techniques. James Cunha Werner University of Manchester Christmas Meeting
Production Planning Eric van Herwijnen Thursday, 20 june 2002.
11 Dec 2000F Harris Datagrid Testbed meeting at Milan 1 LHCb ‘use-case’ - distributed MC production
CMS Report – GridPP Collaboration Meeting VIII Peter Hobson, Brunel University22/9/2003 CMS Applications Progress towards GridPP milestones Data management.
ATLAS-Specific Activity in GridPP EDG Integration LCG Integration Metadata.
CMS Report – GridPP Collaboration Meeting VI Peter Hobson, Brunel University30/1/2003 CMS Status and Plans Progress towards GridPP milestones Workload.
3 Sept 2001F HARRIS CHEP, Beijing 1 Moving the LHCb Monte Carlo production system to the GRID D.Galli,U.Marconi,V.Vagnoni INFN Bologna N Brook Bristol.
BaBar MC production BaBar MC production software VU (Amsterdam University) A lot of computers EDG testbed (NIKHEF) Jobs Results The simple question:
BaBar Grid Computing Eleonora Luppi INFN and University of Ferrara - Italy.
23 Oct 2002HEPiX FNALJohn Gordon CLRC-RAL Site Report John Gordon CLRC eScience Centre.
Cosener’s House – 30 th Jan’031 LHCb Progress & Plans Nick Brook University of Bristol News & User Plans Technical Progress Review of deliverables.
8th November 2002Tim Adye1 BaBar Grid Tim Adye Particle Physics Department Rutherford Appleton Laboratory PP Grid Team Coseners House 8 th November 2002.
Nick Brook Current status Future Collaboration Plans Future UK plans.
- Iain Bertram R-GMA and DØ Iain Bertram RAL 13 May 2004 Thanks to Jeff Templon at Nikhef.
March 2003 CERN 1 EDG and AliEn in Prague Dagmar Adamova INP Rez near Prague.
CMS Report – GridPP Collaboration Meeting V Peter Hobson, Brunel University16/9/2002 CMS Status and Plans Progress towards GridPP milestones Workload management.
11 December 2000 Paolo Capiluppi - DataGrid Testbed Workshop CMS Applications Requirements DataGrid Testbed Workshop Milano, 11 December 2000 Paolo Capiluppi,
ATLAS and GridPP GridPP Collaboration Meeting, Edinburgh, 5 th November 2001 RWL Jones, Lancaster University.
SouthGrid SouthGrid SouthGrid is a distributed Tier 2 centre, one of four setup in the UK as part of the GridPP project. SouthGrid.
19th September 2003Tim Adye1 RAL Tier A Status Tim Adye Rutherford Appleton Laboratory BaBar UK Collaboration Meeting Royal Holloway 19 th September 2003.
The Experiments – progress and status Roger Barlow GridPP7 Oxford 2 nd July 2003.
A B A B AR InterGrid Testbed Proposal for discussion Robin Middleton/Roger Barlow Rome: October 2001.
Open Science Grid & its Security Technical Group ESCC22 Jul 2004 Bob Cowles
Geant4 Training 2006 Short Course Katsuya Amako (KEK) Gabriele Cosmo (CERN) Susanna Guatelli (INFN Genova) Aatos Heikkinen (Helsinki Institute of Physics)
Andrew McNabGrid in 2002, Manchester HEP, 7 Jan 2003Slide 1 Grid Work in 2002 Andrew McNab High Energy Physics University of Manchester.
11th November 2002Tim Adye1 Distributed Analysis in the BaBar Experiment Tim Adye Particle Physics Department Rutherford Appleton Laboratory University.
11th April 2003Tim Adye1 RAL Tier A Status Tim Adye Rutherford Appleton Laboratory BaBar UK Collaboration Meeting Liverpool 11 th April 2003.
The GridPP DIRAC project DIRAC for non-LHC communities.
BaBar and the GRID Tim Adye CLRC PP GRID Team Meeting 3rd May 2000.
Materials for Report about Computing Jiří Chudoba x.y.2006 Institute of Physics, Prague.
The MEG Offline Project General Architecture Offline Organization Responsibilities Milestones PSI 2/7/2004Corrado Gatto INFN.
The DataGrid Project NIKHEF, Wetenschappelijke Jaarvergadering, 19 December 2002
Enabling Grids for E-sciencE INFSO-RI Enabling Grids for E-sciencE Gavin McCance GDB – 6 June 2007 FTS 2.0 deployment and testing.
The GridPP DIRAC project DIRAC for non-LHC communities.
Best 20 jobs jobs sites.
J Jensen / WP5 /RAL UCL 4/5 March 2004 GridPP / DataGrid wrap-up Mass Storage Management J Jensen
LHCb Computing 2015 Q3 Report Stefan Roiser LHCC Referees Meeting 1 December 2015.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
18/12/03PPD Christmas Lectures 2003 Grid in the Department A Guide for the Uninvolved PPD Computing Group Christmas Lecture 2003 Chris Brew.
EDG Project Conference – Barcelona 13 May 2003 – n° 1 A.Fanfani INFN Bologna – CMS WP8 – Grid Planning in CMS Outline  CMS Data Challenges  CMS Production.
BaBar-Grid Status and Prospects
Grid Computing, ORACLE and CERN
Moving the LHCb Monte Carlo production system to the GRID
EO Applications Parallel Session
BLAHPd developments (David, Massimo, Giuseppe)
Data Challenge with the Grid in ATLAS
Grid related projects CERN openlab LCG EDG F.Fluckiger
The LHCb Software and Computing NSS/IEEE workshop Ph. Charpentier, CERN B00le.
ALICE Physics Data Challenge 3
Grid2Win: Porting of gLite middleware to Windows XP platform
LHCb Computing Model and Data Handling Angelo Carbone 5° workshop italiano sulla fisica p-p ad LHC 31st January 2008.
UK Testbed Status Testbed 0 GridPP project Experiments’ tests started
Dirk Düllmann CERN Openlab storage workshop 17th March 2003
LCG middleware and LHC experiments ARDA project
Short Course IEEE NSS/MIC 2003 Katsuya Amako (KEK) Makoto Asai (SLAC)
Integrating SRB with the GIGGLE framework
Gridifying the LHCb Monte Carlo production system
MonteCarlo production for the BaBar experiment on the Italian grid
Kanga Tim Adye Rutherford Appleton Laboratory Computing Plenary
Computing activities at Victoria
Status and plans for bookkeeping system and production tools
Short to middle term GRID deployment plan for LHCb
Production Manager Tools (New Architecture)
The LHCb Computing Data Challenge DC06
Presentation transcript:

Tim Barrass Split 50-50 (100-100?) between BaBar and CMS projects. Interested in issues of persistent data management and grid integration. Fresh from a PhD modelling volcanic ash clouds in Earth Sciences- so am coming up to speed with what’s going on in particle physics.

Non-BaBar work CMS work Implement and begin to stress test the LCG POOL Objectivity replacement at CERN and Bristol. General Contribute to testing the EDG RLS by installing the service at Bristol. Attend two OO coding courses at RAL in December.

BaBar goals Q4 2002 Have been getting up to speed with BaBar computing environment. Creating test federations and doing MC runs. Work with ROOT trees and files. Create a snapshot of the conditions db at RAL to link jobs against. Develop a BaBar Grid testbed at Bristol (with Wahid). Attend the Dec collaboration meeting at SLAC.

BaBar goals Q1 2003 Contribute to conversion of Mini-DST to a ROOT format (a la Micro-DST). Help develop BaBar Grid infrastructure. Stress test file transfers with other BaBar Grid sites, and MC job submission (as other sites are currently doing). Use the testbed to access (“gridify”?)BaBar farms at Bristol.