Reconciling Power Flow (PF) with Production Cost Model (PCM) Cases

Slides:



Advertisements
Similar presentations
Parallel Flow Visualization Data Requirements Parallel Flow Visualization Data Requirements NERC ORS Meeting Toronto, Ontario September 23-24, 2009 Jim.
Advertisements

WESTERN ELECTRICITY COORDINATING COUNCIL OPERATIONS COMMITTEE June 18, 2009 Salt Lake City, UT Base Case Coordination System (BCCS) Request For Information.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) May 15, 2013 Joe Seabrook Puget Sound Energy.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
1. 2 NERC Bulk Electric System (BES) Definition (NERC Glossary of Terms Used in Reliability Standards) FERC Order 693 FRCC Handbook Review Task Force.
Update on System Adequacy Planning (SAP) Activities May 5 th -6 th 2015 SPSG Meeting Ben Brownlee, P.E.., Dan Beckstead, Stan Holland, Vijay Satyal PhD.
Proposed Generation Expansion Process For Review and Discussion March 1, 2011.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
System Review Work Group Update John Gross, SRWG Chair Presented to TSS Jan. 22, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
TEPPC Review Task Force January 11, Purpose Advise and make recommendations on Future potential future generation and load balance Adequacy of the.
2026 Common Case Development Byron Woertz, Manager—System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
PG&E’s Distribution Resources Planning READ AND DELETE For best results with this template, use PowerPoint 2003 Planning the “Networked Grid“ Integrated.
CREPC/WIRAB Meeting April 27, 2016 Salt Lake City, UT Thomas Carr Western Interstate Energy Board Evolution of Grid Planning in the West.
Texas Nodal Electrical Buses and Outage Scheduling.
Nodal Planning Go Live Austin, TX February 3, 2011
System Review Work Group Update to TSS John Gross, SRWG Chair Presented to TSS May 17, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
RELIABILITY COORDINATOR TOPICS 2006 FRCC SYSTEM OPERATOR SEMINAR.
This module will dig deeper into Smart Grid implementation issues. It will focus on two key issue of particular interest to the PNW: 1)How the Smart Grid.
RASRS Report to Operating Committee March 21, 2017
Transmission Planning Base Case Loads & Transmission System Model
RAC Implementation Status
Studies Work Group Update
DWG Meeting March 7, 2017 (Update to a Meeting held July 26, 2016)
John Dumas Director, Wholesale Market Operations
TEPPC Review Task Force Meeting February 4-5, 2016
Progress Report for the May 26th 17:31 Event
Reliability Assessment Committee Proposal TSS Meeting
Philip Augustin TSS Chair
Subteam 1a Competitive Solicitations Framework Working Group Meeting
Energy and Ancillary Services Design Stream Working Group Meeting 6
Updates to the Path Rating Process for Approval by the PCC
Nick Hatton Associate Engineer March 9, 2017
Economic Operation of Power Systems
ISO New England System R&D Needs
Unscheduled Flow Administrative Subcommittee MIC/OC Report
Outline Background Study Assumptions Study Results To Do
Reliability Assessment Committee
ECEN 460 Power System Operation and Control
Technical Advisory Subcommittee Process Improvement Discussion
Production Cost Modeling Data Work Group
Planning Tools Overview
Jamie Austin, PacifiCorp
EU-IPA12/CS02 Development of the Renewable Energy Sector
Module 4 Smart Grid Implementation Issues
DEC System Voltage Planning - June 2018
ColumbiaGrid Planning Meeting WECC Update February 9, 2017
Mid-Continent Area Power Pool
Jonathan young ColumbiaGrid
ADS and WPR Seed Case Background
Transforming Scenario Narratives into Study Cases
RAC Implementation Status
ADSTF Update: Resource Mapping and Proposed Solution
2018 State of the Interconnection Overview
Jonathan Young SDWG Chair
Planning Tools Overview
Modeling Subcommittee (MS) Updates
Andrew Christensen, SRWG Chair
ADSTF Update: Resource Mapping and Proposed Solution
SRWG Chair Report March 2015 WECC HQ
Unscheduled Flow Administrative Subcommittee ISAS Report
Jamie Austin, PacifiCorp
ADS and WPR Seed Case Background
2018 WECC Loads and Resources Data Request Part 1
Jonathan Young SDWG Chair
System Review Work Group Update to TSS
System Review Work Group Update to TSS
WECC Scenario Task Force (WSTF)
Presentation transcript:

Reconciling Power Flow (PF) with Production Cost Model (PCM) Cases Donald Davies Western Electricity Coordinating Council

Western Electricity Coordinating Council Anchor Data Set Proposal from Joint PCC-TEPPC Review Task Force (JPTRTF) Task Force Report – Anchor Data Set – Appendix B Purposes – Common representation of loads, resources, transmission 10 years in the future Common foundation for load, resource, and transmission topology data Consistent processes and protocols for gathering planning data Western Electricity Coordinating Council

Western Electricity Coordinating Council Anchor Data Set Transmission Topology Resources Load Forecasts Other – generator unit start-up times, variable O&M costs, emission costs Western Electricity Coordinating Council

Recent Helpful SRWG Initiatives SS – for station service load Identification of Turbine Type Identification of non-conforming loads Identification of balancing authorities Identification of Long IDs Identification of Substations Also helpful to match up to WSM Identification of Netted generators with NT Western Electricity Coordinating Council

Information from PF used by PCM Generators Must Match Load Location Transmission Topology and Voltage Control Status of Generator Step-up transformers Adaptive Voltage Control Transmission Topology Must Match Generator Station Service Load Generator Dispatch among units on River Systems and combined cycle plants Western Electricity Coordinating Council

Western Electricity Coordinating Council Generators Must Match PCM Generators are indexed to PF generators In some instances the PCM includes generators that are not represented in the PF or vice-versa Suggested Solution: Existing generators – Both PF and PCM Need to follow requirements of the Data Preparation Manual Planned generators – Need to identify represented generators following processes in PCM and they need to be included in the PF with adequate transfer capability. at high voltage buses if needed? Include necessary transmission Enhancements. Western Electricity Coordinating Council

Western Electricity Coordinating Council Load Location PCM Needs a credible load (geographical) pattern for as many hours as possible Suggested Solution: PF should identify BA for each load to match load forecast and hourly load profile used for PCM PF should identify non-conforming loads and PCM should consider in locating BA level Loads PCM can use multiple initial power flow cases with different load patterns (such as seasonal) Western Electricity Coordinating Council

Status of Generator Step-up Transformers The PCM needs step-up transformers closed, while PF cases often open step-up transformers for off-line units Suggested Solution Close all generator step-up transformers in moving from PF to PCM Set generator status to off for generators at 0 output in moving from PCM to PF. Western Electricity Coordinating Council

Adaptive Voltage Control PCM does not consider Voltage Control, PF Requires appropriate voltage control Suggested Solution: Where possible – use automatic voltage control device operation, including when representing manual operator actions Western Electricity Coordinating Council

Transmission Topology Must Match The PF and the PCM need to represent the same future transmission projects Suggested Solution: Those compiling the PF should represent the transmission projects for the PF case to match the projects desired for the PCM Other scenarios can be studied if automation (such as epcl code) is available to facilitate adding or removing identified transmission projects Western Electricity Coordinating Council

Generator Station Service Load PF should explicitly Identify Generator Station Service Load. PCM are currently set up to net station service load Suggested Solution Net station service load when loading a PF into a PCM Unnet station service load when exporting a PF from the PCM if stability studies are required Another option - Ignore this problem Western Electricity Coordinating Council

Western Electricity Coordinating Council Generator Dispatch among units on River Systems and combined cycle plants In the PCM, River Systems and Combined Cycle Plants have over-simplifed allocation of output. A PF requires better allocation Suggested Solution: Determine where these over-simplifications occur in the PCM and either do a better job of allocating output (may require program changes), or do some kind of post processing when exporting to a power flow case Western Electricity Coordinating Council

Western Electricity Coordinating Council Donald Davies Phone: 801-883-6844 donald@wecc.biz Western Electricity Coordinating Council