Urgent Operational Needs – Rapid Acquisition

Slides:



Advertisements
Similar presentations
Bulk Petroleum Executive Agent Cynthia F. Smith PETRO May 30, 2012.
Advertisements

Introduction to the Joint Capabilities Integration and Development System (JCIDS) CAPT Keith Bowman, Joint Staff, J-8 Hello, I am Captain John Costello.
Joint Contingency Contracting
C2 Integration Division Marine Corps Combat Development Command
Process for Meeting Immediate Warfighter Needs
Office of the Secretary of Defense Defense Microelectronics Activity (DMEA) Defense Microelectronics Activity (DMEA) Doug Casanova Defense Microelectronics.
United States Army Combined Arms Center TIER III SUPPORT.
SEABEE COMBAT WARFARE NCF OFFICER SPECIFIC
CLR 252 Developing KPPs Note from SME:
1 Contractors on the Battlefield Mr. Gary Motsek Assistant Deputy Secretary of Defense (Program Support) November 12, 2009.
PMP® Exam Preparation Course
DoD Acquisition Domain (Sourcing) (DADS) Analysis of Alternatives (AoA) E-Business/SPS Joint Users’ Conference November 15-19, 2004 Houston, TX.
1 Pipeline Measurement Process Review Committee Kickoff Session Paul Blackwell Office of the Deputy Assistant Secretary of Defense for Supply Chain Integration.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
US Special Operations Command UNCLASSIFIED UNCLASSIFIED 1 Acquisition, Technology, and Logistics Support to SOF Warfighters Ms. Leah Treppel Deputy for.
CoCom Involvement in the Joint Capabilities Process November 4, 2003.
New 5000 Documents 14 May 2001 New 5000 Documents 14 May 2001 Defense Systems Management College Acquisition Policy Department.
Joint Capabilities Integration and Development System (JCIDS) Nov 2010
Crisis Action Planning Process پروسه پلان گذاری عملکرد بحران Situation Development Crisis Assessment COA Development COA Selection Execution Planning Execution.
D Appendix D.11. Toward Net-Centric Acquisition Oversight A Proposal for an Acquisition Community of Interest (COI) MID 905 Streamlined Acquisition.
AT&L / Logistics & Material Readiness Office of Deputy Assistant Secretary (Supply Chain Integration) Government Furnished Materiel Requisitions GFP Working.
MPE – Enabling ALL to securely SEE, DECIDE, ACT MPE - Highlights  Establish Core Implementation Working Group  Build Joining, Membership, and Exiting.
Class I Executive Agent (EA) Readiness Assessment Preliminary Results February 2012.
DOD Non- Standard Equipment Review Panel (NSERP)
9/4/2003 Preparing Warriors Individually through Development and Distribution of Joint Knowledge 1 Joint Knowledge Development and Distribution Capability.
1 CCSAS Governance An Overview 2007 Annual Child Support Training Conference and Expo September 18, :30 – 12:00.
ATEC Safety Verification Process
Joint Forces Command Working Group Brief-Backs
DoD Template for Application of TLCSM and PBL
Lesson Objectives Determine the key Requirements Manager activities and the role of the ICD leading up to the MDD and during Materiel Solution Analysis.
DoDAF 2 Was Designed to Support DoD’s 6 Core Processes
DOTmLPF-P Change Recommendations
DOTmLPF-P Change Recommendations
Requirements Overview
Dr. Ellen Livingston Office of Naval Research September 2017
CAD/PAD Development Process
DOTmLPF-P Change Recommendations
Mr. Rich Webster (703) Headquarters Marine Corps
MDD to Milestone A Requirements Management Activities
DOTmLPF-P Change Recommendations
Urgent Operational Needs – Rapid Acquisition
TechStambha PMP Certification Training
Architecture Tool Vendor’s Day
Air Force Airborne SIGINT Architecture & Analysis
ISA 201 Intermediate Information Systems Acquisition
Urgent and Emergent Operational Needs and Their Fulfillment
DOTmLPF-P Change Recommendations
MDD to Milestone A Requirements Management Activities
Materiel Development Decision (MDD) to Milestone A (MS A)
Materiel Development Decision (MDD) to Milestone A (MS A)
Provide Financial Management Support
PPBE JEOPARDY!.
Project Ideation Agile Down-to-Earth © 2016.
Joint Staff J8, Deputy Director for C4
Defense Logistics: Integrated and Efficient
Module 5: Medical Group Supervisor Medical Supply Coordinator
Mid-Tier Acquisition Framework Reference Tool for PMs
Financial Management Modernization Program
Joint DOTmLPF-P Change Recommendations (DCRs)
MODULE B - PROCESS SUBMODULES B1. Organizational Structure
Workshop Session I.
Performance Management Training
Joint Program Executive Office for Chemical and Biological Defense
Unit 8: Course Summary.
Strategic Planning Process
Joint DOTmLPF-P Change Recommendations (DCRs)
The Department of Defense Acquisition Process
The Army Maintenance Program at the Platoon/Section Level
MExW Needs Analysis Issue Quad
Mr. Michael Petee Headquarters United State Special Operations Command
Presentation transcript:

Urgent Operational Needs – Rapid Acquisition

Lesson Objectives Describe Urgent Operational Need situations, procedures, and lessons learned Recognize situations that call for a Rapid Response List the differences between a Rapid Acquisition and Traditional Acquisition Describe actions to transition a Rapid Response into a Program of Record (POR)

Urgent Operational Needs Urgent needs are generated during a NCA-directed combat operation and if not met will result in loss of life or mission failure COCOM/Joint Force Commanders use JUON process to rapidly acquire joint / theater-wide capabilities Services use Service procedures to rapidly acquire Service-unique capabilities Requirements Managers and Program Managers must work together to ensure success Whoever writes the JUON becomes a de-facto Requirements Manager The DOD 5000 and CJCS 3170 series acquire weapons systems using a traditional, deliberate process, usually taking a few years even when the system uses maximum streamlining. Sometimes, the warfighters need a new capability as soon as possible. What does DOD and the JCIDS process do when warfighters need something NOW? Each Service uses various methods to shorten the acquisition timelines to meet urgent and compelling needs during crisis and conflict, but service policies and procedures do not provide an opportunity to address theater-wide multi-Service combatant commander joint urgent operational needs. The action officer or NCO who writes the JUON for the combat command becomes a de-facto Requirements Manager; however, Requirements Managers must be involved in follow-on actions for recurring or ongoing requirements. Underline loss of life or mission failure………good bumper sticker

Traditional Acquisition vs. Rapid Acquisition Processes 6/11/2018 Traditional Acquisition Future Focused, ACAT Programs Very Structured Process Evolved Requirements Analysis of Alternatives Lengthy Development High Visibility on Program Large Investment Rapid Acquisition Now-focused, ACAT II or below Streamlined process Specific, combat requirement Quick assessment of alternatives Limited development High visibility on results Limited investment May transition to PoR 75% solution acceptable

Joint Urgent Operational Needs JUONs can be initiated by: A COCOM / Joint Force Commander A Service Component Commander through its COCOM A COCOM commander’s delegated representative COCOM-validated JUONs are submitted to the Joint Staff J8 and the Joint Rapid Acquisition Cell JS Gatekeeper (DDR, J-8) will assign JUON to appropriate FCB Joint Rapid Acquisition Cell (JRAC) will work with Services for solutions / funding Joint Improvised Explosive Device Defeat Organization (JIEDDO) will address IED issues JUON format is on SIPRnet: http://www.acqs.osd.pentagon.smil.mil/jrac When warfighters report situations that put life at risk or risk mission failure, every service has its own Rapid Response procedure. When the situation is a joint problem, the joint Rapid Response procedure is the Joint Urgent Operational Needs (JUON). JUON validation and resourcing involves: Functional Capabilities Boards (FCBs) The Gatekeeper The Joint Rapid Acquisition Cell (JRAC) The JUON Sponsor, generally a Service

Notional JUON Flow Chart Generate JUONS JRAC Coordinates assessment of JUONs with JS, services and S&T community JUON Validated by Joint Staff J8 Existing Solution? Tech Dev < 2Yr? Feedback to JCS, Originator & COCOM No No Yes Yes Feedback to JCS, Originator & COCOM Fund & Field Revise Request? Monitor Execution Yes Yes No No COCOM Generate S&T Program Joint Staff “Stability and counter-insurgency missions require 75% solutions over a period of months…” Secretary Gates, Foreign Affairs, Jan/Feb 2009 JRAC Components

JUON Process Functional Capability Board (FCB) Joint Staff will: 6/11/2018 Functional Capability Board (FCB) Joint Staff will: Conduct triage of JUONs (assess and prioritize) Convene a working group Recommend if the JUON should be validated and if so an initial sponsor Deputy Director, Requirements, J-8, Joint Staff will: Validate requirement Notify COCOM if JUON is not validated Notify Joint Rapid Acquisition Cell of determination Recommend a sponsor Lower case triage… no cap….triage = prioritize and assess Bullets: Prioritize JUON, Determine level of effort required, Recommend initial sponsor… voice over “and work with JRAC

JUON Process JRAC Director, Rapid Fielding Directorate will: Host a JUON Working Group to review alternative solutions and funding sources Identify JUON sponsor and any supporting sponsors DS/A (sponsor) will within 45 days submit a JUONs Management Plan: To fund and field the item(s) coordinated with COCOM Will be approved by the JRAC in coordination with the Joint Staff and COCOM The DS/A must: Develop an acquisition plan Obtain service-level approval (ACAT II and below) to begin production

JUON Limitations JUONs are not intended to bypass DODI 5000.02 JUON materiel solutions must be ACAT II or below Should be inherently joint in nature No stand-alone funds are available to fund JUONs JRAC will develop options to fund them from within existing budget line-items

Urgent Solutions Must consider full-range of DOTMLPF solutions Must be technologically feasible and affordable Must be supported by viable CONOPs for fielding, training and sustaining Should not require extensive research, development and testing Validated, resourced and fielded outside of established JCIDS and acquisition processes

Inherent Risks 6/11/2018 Solution Failure – rapid fielding may result in a solution that does not perform as planned Short-term success may not meet longer-term needs Inadequate sustainment planning: May result in requirements for multiple upgrades or for more costly improvements Issues if we must transition to a new sustainer other than the initial provider Short learning curve Transition to Program of Record (PoR) may require backward development of required DoD 5000 documentation

Transition to Program of Record (PoR) 6/11/2018 Who decides if a solution to an Urgent Operational Need needs to enter the formal acquisition process? ACAT I – Defense Acquisition Executive (DAE) makes the PoR decision ACAT II or below – Component Acquisition Executive (CAE) / Service Acquisition Executive (SAE) makes the PoR decision May need Material Development Decision (MDD) depending on: Status of procurement If the fielded solution needs additional development Funding for additional quantities and sustainment is Service responsibility

Backup Slides

Military Service Rapid Response Procedures Army: Operational Needs Statement (ONS). Initiated thru operational commander’s chain-of-command, endorsed by 06 or higher, submitted via SIPRNet to HQDA (DCS G-3/5/7) (AR 71-9) Navy & Marine Corps: Urgent Need Process (UNP). Initiated via Service chain-of-command. Certified by Naval Component Commander or Marine Corps component commander of supported COCOM (SECNAVNOTE 5000). Air Force: Urgent Operational Need from Warfighting Commander to lead MAJCOM (AFI 63-114) Army (AR 71-9, 28 Dec 2009): Operational Needs Statement (ONS). Submitted through the operational commanders chain of command, endorsed by a O–6/Colonel or higher for DCS, G–3/5/7 validation and sourcing. ONS will be submitted using the equipment common operating picture (ECOP) collaborative planning information technology system. ECOP is a SIPRNET, collaborative web-based database and documentation library for requesting and sourcing materiel and nonmateriel solutions to urgent warfighter needs. Operational field commanders submit and track ONS and equipment sourcing documents (ESD) submitted. Navy & Marine Corps (SECNAVNOTE 5000, DON Urgent Need Process, 12 March 2009): An urgent need is an exceptional request from a Navy or Marine Corps component commander for an additional warfighting capability critically needed by operating forces conducting combat or contingency operations. Failure to deliver the capability requested is likely to result in the inability of units to accomplish their missions or increases the probability of casualties and loss of life. Also, see MCO 3900.15B, 10 Mar 2008, Urgent Universal Need Statement Processing. Air Force (AFI 63-114, Rapid Response Process,12 June 2008): Urgent Operational Need (UON) process begins when a Warfighting Commander identifies a capability gap/ shortfall that could result in loss of life and/or prevent mission accomplishment and requests Air Force assistance. The lead MAJCOM validates the UON and determines the most expeditious and effective solution. UONs may be answered by the lead MAJCOM using any one of several different processes, of which Combat Capability Documents (CCD) and the Rapid Response Process (RRP) is only one. The MAJCOM usually documents UON requirements with an AF Form 1067, Modification Proposal, or a CCD; however, other requirements documents may be used. A CCD is used when the MAJCOM requires CSAF assistance with the reprogramming or identification of funds and/or PMD actions.

U.S. Special Operations Command Rapid Response Process USSOCOM Combat Mission Need Statement (C-MNS) supports urgent new or existing materiel needs Operational unit prepares the C-MNS C-MNS endorsed by Theater Special Operations Command (TSOC) Commander and USSOCOM component HQ USSCOM forms rapid response team to rapidly identify, validate, approve and field a solution. Normally fields new or existing materiel within 180 days of C-MNS approval. The USSOCOM Combat Mission Need Statement (C-MNS) process, documented in USSOCOM Directive 71-4, “Combat Mission Need Statement (CMNS) Process,” supports urgent and compelling new or existing materiel needs identified during preparation for or active special operations force (SOF) combat and/or contingency operations. A C-MNS must satisfy at least one of two criteria: (1) critical shortfall on the overall success of the mission (mission failure); or (2) critical combat survivability deficiency (loss of life). The C-MNS process supports expeditious acquisition of new or existing materials, normally fielded within 180 days of C-MNS approval. The solution must be sustainable through duration of combat or contingency operations. C-MNS materials are no longer maintained or sustained after the operation unless a capability document is approved in accordance with Directive 71-4. C-MNS approval includes resourcing to finance a rapid capability solution affordably. A C-MNS is prepared by the operational unit in the field, endorsed by the theater special operation command (TSOC) commander and endorsed by the USSOCOM component for USSOCOM validation and approval. Although the process parallels the JCIDS process in format, the C-MNS does not substitute for this process. Upon C-MNS receipt, a HQ USSOCOM rapid response team is formed from subject matter experts in each USSOCOM staff directorate and applicable components to identify, validate, approve and field a solution rapidly.