Overview and System Design for ESS LLRF Systems

Slides:



Advertisements
Similar presentations
ESS End-to-End Optics and Layout Integration Håkan Danared European Spallation Source Catania, 6 July 2011.
Advertisements

ESS LLRF System Anders J Johansson.
LLRF Requirement and Parameters at ESS Rihua Zeng, Anders J Johansson LLRF workshop, Hamburg,
Roger Ruber, Volker Ziemann, Gergana Hamberg Uppsala University
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS TAC Lund, 8 July 2010 Roger Ruber (Uppsala University) for the ESS Linac RF Team.
European Spallation Source RF Systems Dave McGinnis RF Group Leader ESS Accelerator Division SLHiPP-1 Meeting 9-December-2011.
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
ORNL/SNS Spallation Neutron Source Low-Level RF Control System Kay-Uwe Kasemir, Mark Champion April 2005 EPICS Meeting 2005, SLAC.
RF Distribution Alternatives R.A.Yogi & FREIA group Uppsala University.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Tomasz Czarski, Maciej Linczuk, Institute of Electronic Systems, WUT, Warsaw LLRF ATCA.
Dave McGinnis Chief Engineer – Accelerator Division
LLRF-05 Oct.10,20051 Digital LLRF feedback control system for the J-PARC linac Shin MICHIZONO KEK, High Energy Accelerator Research Organization (JAPAN)
1Matthias LiepeAugust 2, 2007 LLRF for the ERL Matthias Liepe.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
Anders Sunesson RF Group ESS Accelerator Division
Alexander Aleksandrov Oak Ridge National Laboratory
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
Cornell digital LLRF system S. Belomestnykh LLRF05 workshopCERN, October 10, 2005.
ESS LLRF and Beam Interaction. ESS RF system From the wall plug to the coupler Controlled over EPICS Connected to the global Machine Protection System.
ESS RF System Design Stephen Molloy RF Group ESS Accelerator Division SLHiPP2 4-May-2012.
Preliminary Functional Analysis of ESS Superconducting Radio-Frequency Linac C. Darve, N. Elias, J. Fydrych, D. Piso European Spallation Source ESS AB,
0 Plenty Energy Clean Environment Healthy Life Commissioning and Initial Operation of the KOMAC 100-MeV Proton Linac KOMAC / KAERI Kyung-Tae Seol
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
Digital LLRF: ALBA and Max-IV cases RF&Linac Section - ALBA Accelerators Division Angela Salom.
ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS/SPL Collaboration Meeting Lund, 29 June 2010 Roger Ruber (Uppsala University) for the ESS.
Digital RF control at LBNL Gang Huang on behalf of the LBNL LLRF team LLRF2015.
Performance of the cERL LLRF System Takako Miura (KEK) LLRF'15, Shanghai, Nov 4, 2015 (T. Miura) 1 Compact ERL (Energy Recovery LINAC)
Page Beam Instrumentation mini- workshop Conclusions from the Hardware, Timing and MPS mini-workshop Lund, Miha Reščič Deputy Head of
Overview of long pulse experiments at NML Nikolay Solyak PXIE Program Review January 16-17, PXIE Review, N.Solyak E.Harms, S. Nagaitsev, B. Chase,
Matthias Liepe. Matthias Liepe – High loaded Q cavity operation at CU – TTC Topical Meeting on CW-SRF
BE-RF-FB THE LINAC4 LOW LEVEL RF 02/11/2015 LLRF15, THE LINAC4 LOW LEVEL RF2 P. Baudrenghien, J. Galindo, G. Hagmann, J. Noirjean, D. Stellfeld, D.Valuch.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech Jalmuzna, Technical University of Lodz, Department of Microelectronics and Computer.
LLRF development of SSRF RF Group and Linac Group
ESS LLRF and Beam Interaction
Rihua Zeng RF group, Accelerator division
RF cell Anders Sunesson RF group leader
ESS Phase Reference Signal Distribution
Test of the dressed spoke cavity
WP5 Elliptical cavities
LLRF Research and Development at STF-KEK
Uppsala Commitment to ESS and FREIA Planning
LLRF for ESS: Requirements and System design
ILC LLRF Status Ruben Carcagno, Brian Chase
LLRF systems status update
Emanuele (ESS), Alessandro (CERN), Mikel (Tekniker), Hayley (ISIS)
Rihua Zeng RF Group, Accelerator Division, ESS ERIC Oct 29, 2015
Test plan of ESS HB elliptical cavity
Challenges and Perspectives of Accelerator Driven Systems (ADS)
1- Short pulse neutron source
Superbeams with SPL at CERN
EffiCAS Efficient Facility for Ions at CAS
CEPC RF Power Sources System
Implications of HOMs on Beam Dynamics at ESS
Test plan of ESS HB elliptical cavity
First High Power Test of the ESS Double Spoke Cavity package
Managing Parameters Karin Rathsman
FAIR pLinac RFQ Meeting pLinac RF Power Sources
RF systems introduction
Krzysztof Czuba ESS LLRF Quarterly Meeting
Risk, Schedule, Deliveries
Introduction CDR Normal Conducting Linac LLRF
European Spallation Source ERIC
Status of the ESS High Power RF Systems
RF introduction Anders Sunesson RF group leader
Roger Ruber for the FREIA team 11 June 2013, Uppsala
PDR of Master Oscillator
Presentation transcript:

Overview and System Design for ESS LLRF Systems Anders J Johansson, Lund University, sweden

European Spallation Source 5 MW Neutron source 2 GeV proton linac Pulsed at 14 Hz, 2.86 ms long pulses. Rotating tungsten target

ESS Accelerator 1 RFQ 3 Pillbox buncher cavities in MEBT. Source LEBT RFQ MEBT DTL Spokes Medium b High b HEBT Target 352.21 MHz 704.42MHz Pulsed 14 Hz 3.6 MeV 90 MeV 216 MeV 561 MeV 2000 MeV 62.5 mA 1 RFQ 3 Pillbox buncher cavities in MEBT. 5 Drift Tube Linac sections. 26 Superconducting spoke cavities. 36 Superconducting medium-b cavities. 84 Superconducting high-b cavities.

ESS RF power amplifiers One power amplifier per accelerating cavity 2.8 MW Klystron for RFQ 30 kW Solid State for Buncher 2.8 MW Klystron for DTL 2x200kW Tetrode combined for Spoke 1.5 MW Klystron for Medium- Beta Elliptical 1.2 MW IOT for High Beta Elliptical

Field Stability Current requirements for regulation accuracy of the cavity field. RFQ +/- 0.2 % RMS amplitude +/- 0.2 o RMS* Normal Conducting +/- 0.2 o RMS Super Conducting +/- 0.1 % RMS amplitude +/- 0.1 o RMS Relaxed requirements for initial 10 us. Time Cavity Field Beam 2.86 ms *Relative the phase reference line. All other phase requirements relative the beam.

Timing and Phase Reference MRF timing system in gallery distributes triggers. Phase reference line in tunnel.

RF Cell LLRF: PI-control Adaptive feedforward Inner klystron loop Beam current variation compensation

High level LLRF architecture Procedures Schemes that involve longer times and multiple pulses. Algorithms Updates that take place between pulses (68 ms). Functions Real-time control within a pulse (3.5 ms). Procedures Scripts CPU EPICS Algorithms Software CPU PCIe LLRF Functions Firmware FPGA

Platform: MTCA.4 Modular design Adaptable to different cavities. Facilitates incremental upgrades Simplifies end of life management Temperature controlled rack

MTCA cards in crate for RFQ RFQ has 22 sensors, uses multiple acquisition cards. MCH FPGA+ADC/DAC+RTM CPU FPGA+ADC/DAC+RTM Timing FPGA+ADC/DAC+RTM FPGA+ADC/DAC+RTM PSU PSU 1 2 3 4 5 6 7 8 9 10 11 12

704.42 MHz Medium-b MTCA.4 LLRF CPU Timing Timing FPGA/ADC RF/VM CB control on backplane Timing triggers MCH supervision External I/O Ethernet on backplane CPU LO-generation Phase reference Cavity Pickup VM out PreAmp Out PowerAmp out PowerAmp Refl Cavity In Cavity Refl Clk Timing LO/REF Timing FPGA/ADC RF/VM Interlock Modulator Voltage Beam current Vectormodulator out FPGA PZ Piezo 1 Piezo 2 MCH Fan Tray x 2 EPICS, Supervision PSU x 2 230 V AC

Tuning Slow tuners The cavities are mechanically tuned to the right frequency. Temperature for RFQ Slug tuners for DTL and buncher cavities. Cavity deformation for spoke and elliptical cavities. The stepper motors for the cold cavities are within the cryomodule. The motor controllers will be controlled from the LLRF system over EPICS.

Tuning Fast tuners The superconducting cavities have additional piezo actuators. There are two piezo actuators per cavity for redundancy. Will be used to reduce Lorenz force detuning. Triggered by timing system Control electronics integrated into LLRF crate.

Status Two test benches up and running at Lund University 352.21 MHz Test benches controlled from a central ”control room” computer and screens. One prototype running at Freia test hall at Uppsala University.

ESS LLRF Collaboration The LLRF system is designed by Lund University, Sweden. The LLRF hardware for 352.21 MHz part is planned to be delivered from ESS Bilbao, Spain. The LLRF hardware for 704.42 MHz is planned to be delivered from Polish Electronics Group, Poland. One RTM card designed by SLAC under contract. In addition, all collaborators are doing additional design work on separate components of the complete system.

ESS RF and LLRF presentations at LLRF 2015 Olof Troeng ”Cavity field control for ESS” (Tuesday) Fredrik Kristensson ”ESS digital LLRF prototype and testbenches” (Wednesday) Anders Sunesson ”RF system development at ESS”, (Thursday) Anders J Johansson ”Overview and system design for ESS LLRF systems (Thursday) Rihua Zeng ”Investigation of energy efficiency improvements in LLRF control at ESS” (Thursday 13:55) Anders Svensson ”ESS phase reference signal distribution” (Friday 9:55) Bo Bernhardsson