Status of the Mechanics at Ciemat.

Slides:



Advertisements
Similar presentations
CALICE - European DHCAL meeting Ciemat Mechanical Workshop and test of the Stainless steel plate machining for the CALICE-HCAL. Enrique Calvo Alamillo.
Advertisements

CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
WA105 General Meeting at CERN 21 & 22-January-2014 Enrique Calvo Alamillo.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler.
Planning a Mentoring Program A CALENDER FOR A FIRST-YEAR TEACHERS’ PROGRAM.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
Mechanical design, analysis and integration of pre-alignment systems for CLIC M.Anastasopoulos / BE-ABP-SU.
X Meeting of the Future Linear Colliders Spanish Network10-Feb-2014 Enrique Calvo Alamillo.
HGC4ILD - High Granularity Calorimeters for ILD WS 2-Feb-2015 LLR (Paris) 2-Feb-2015 Enrique Calvo Alamillo.
CBM Superconducting Dipole Magnet
MUON_EDR-06 (Alignment) Enrique Calvo Alamillo February 28-March 1, 2002 Link Mechanics: Status.
PMT Survey Summary Enrique Calvo Alamillo Chooz 10 February 2010.
Ciemat Mechanical Structure Proposal for a DHCAL m 3 Prototype. Enrique Calvo Alamillo Paris
PMT Support Structure. Final Design. Enrique Calvo Alamillo KOBE - 3 March 2008.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
Thoughts about the MQXF development plan P. Fessia Thanks to discussions within the MDT section (P. Ferracin, J. C. Perez, E. Todesco, P. Ferracin), L.
Tomelleri S.r.l. ® Copyright 2007 © ASTRONOMY AND RESEARCH September 19th 2008 VST Meeting1.
1m 3 SDHCAL Mechanic Structure M.C Fouz 8/10/2010 The 1m 3 prototype Mechanical Structure is financed by: Spanish HEP National Program by the project FPA
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
John LeRose March 12, A Program of three “projects” to assemble the Super BigBite Spectrometer for a series of experiments in Hall A There is a.
DHCAL m3 module Ciemat status Enrique Calvo Alamillo EVO meeting 1 July 2010.
CRYOSTATS DESIGN. WA105 – Cryostat Cut-out WA105 – external walls penetrations & GTT All the information needed has been sent this morning to GTT, and.
PANDA FTOF Prototyping Anton A. Izotov, Gatchina
Technical Support Activities in PH-ADO-PO
Mechanical Designs of The Central Detector Jinyu Fu
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
2 October 17 th, AACHEN. Double Chooz collaboration meeting. CIEMAT.
Hall C Users Meeting SHMS Structure Installation A pictorial review Mike Fowler Hall C Engineering 21 Feb 2014 M. Fowler Hall C Users Group, 2014.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
1 Proposal of the mechanical support on the Buffer for the 10“ PMTs by Enrique Calvo Alamillo.
Enrique Calvo Alamillo Ds DHCAL m 3 modular structure. 2. Basic modular distribution. 3. Guiding and repositioning system. 4. Detector.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory Oxford, UK July 7, 2011 July 7, 2011.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
Tomelleri S.r.l. ® Copyright 2007 © ASTRONOMY AND RESEARCH July 23rd 2008 VST Meeting1.
Meeting at Chooz PMTs Mechanical support on the Buffer. Updates. Enrique Calvo Alamillo
PMT installation meeting at CIEMAT Enrique Calvo Alamillo Chooz 3 March 2009.
- PROPOSAL FOR A SOLUTION OF A “STRAW MODULE” INTEGRATION - INFN-LNF - SPAS -STRAW MODULES INTEGRATION- INFN-LNF-SPAS- December D. Orecchini – P.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Mechanical design of the Pre-Production Detector Unit Model of KM3NeT Mario MUSUMECI and Riccardo PAPALEO KM3NeT PP DU subgroup coordinators.
PANDA Yoke unsolved Interface problems Presented by E. Koshurnikov (Dubna) December 9, 2011, GSI.
FARICH status E.A.Kravchenko Budker INP, Novosibirsk, Russia.
CSP 25th November 2010 Technical agreement number 3: overview
Enrique Calvo Alamillo DAEGU
Complementary ISTC Projects #3888, 3889p
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
Teleconference ACS – FREIA 17th October 2017
SciFi option for neutrino target tracker
Mini-drawers, FE-ASIC , Integrator
Status of the PANDA Magnet
Buffer CABLES routing proposal
CLAS12 - CT meeting 10 October 2013
Teleconference ACS – FREIA 31st October 2017
Far Detector Activities Late 2017 – Early 2018
MicroMegas Mechanical Meeting --- Cern April 2014
Status of the cryogenic system for B180
Introduction to the technical content The Q4 magnet (MQYY) for HL-LHC
Technical Support Activities in PH-ADO-PO
Undulator Assembly Procedure
OLYMPUS Collaboration Meeting Luminosity Monitor Calorimeter
General Assembly Meeting
as a prototype for Super c-tau factory
Teleconference ACS – FREIA 19th June 2017
Status report on CATA-01/POLA-01 coincidence measurements
Progress and plans, Mechanics system of CEPC
Michail Anastasopoulos Lead Detector – Design Engineer
UPPSALA UNIVERSITY_GERSEMI PROJECT
Polarized 3He target installation
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
Presentation transcript:

Status of the Mechanics at Ciemat. http://wwwae.ciemat.es/~calvo/Double_Chooz/Presentations/ Enrique Calvo Alamillo 18-09-2007 Double Chooz collaboration meeting at Oxford

Double Chooz collaboration meeting at Oxford Index Status of the tools being built at ciemat. Fully equipped PMT pressure test. Lastest proposal of the PMT mechanical support. Last distribution of the PMTs on the Buffer. Next steps. Double Chooz collaboration meeting at Oxford

Double Chooz collaboration meeting at Oxford Status of the tools being built at ciemat (1). Manufacture of the following tools is in progress at CIEMAT workshops (according to the drawings supplied by Patrick Perrin, J.François Millot and Loris Scola) One tool unit for the gamma catcher. Two rotation tools units. Will be ready in a couple of weeks. Expected to be delivered to Saclay by end of October. Ready. To be delivered to Saclay by end of October. Preassembly and verification of these tools is planned at CIEMAT during the first week of October. Engineers from Saclay will participate in this process. Double Chooz collaboration meeting at Oxford

Double Chooz collaboration meeting at Oxford Status of the tools built at ciemat (2). Three tool units for the target. One tool unit for the transport. Will be ready by end of November or beginning of December. And delivered to Saclay during January. Will be ready by end of November or beginning of December. And delivered to Saclay during January. Double Chooz collaboration meeting at Oxford

Double Chooz collaboration meeting at Oxford Status of the tools built at ciemat (3). Photos of the status of the different tools: -Tool unit for the gamma catcher. Double Chooz collaboration meeting at Oxford

Double Chooz collaboration meeting at Oxford Status of the tools built at ciemat (4). Photos of the status of the different tools: -Tool unit for the gamma catcher. Double Chooz collaboration meeting at Oxford

Double Chooz collaboration meeting at Oxford Status of the tools built at ciemat (5). Photos of the status of the different tools: -Rotation tools units. Double Chooz collaboration meeting at Oxford

Double Chooz collaboration meeting at Oxford Plans of the pressure test (1). Infrastructure needed will be ready by the end of September. http://wwwae.ciemat.es/~calvo/Double_Chooz/Drawing/Pressure_TEST/ Double Chooz collaboration meeting at Oxford

Double Chooz collaboration meeting at Oxford Plans of the pressure test (2). We are planning to do tests with a PMT, fully assembled with mechanical support structure and magnetic shielding, inside a box which we will fill with oil. In this box we will provide enough pressure to simulate the conditions that the system will have in Double Chooz. The level of pressure, in the worst case at the detector will be aprox 0,5 kg/cm2, which we will obtain by using an oil column of 7 meters high. The box will have an acrylic transparent door so that we can observe if there are any effects. We plan to verify the PMT´s with different orientations (5 are foreseen). And maybe perform a long term test. We should be able to appreciate deformations, or movements, of the supports at the level of milimeters by simply having some reference marks in the walls of the box. Suggestions to make other tests with this system are welcome. Double Chooz collaboration meeting at Oxford

Lastest proposal of the PMT supports (1). This proposal is in agreement with the concentrator and shielding requirements. -Magnetic Shielding Ø 300 mm. -Distance from the top of the PMT to the Magnetic Shielding is 55 mm. One prototype is under fabrication in the workshop and will be ready on next week (will be used in the pressure test). Double Chooz collaboration meeting at Oxford

Lastest proposal of the PMTs support (2). Double Chooz collaboration meeting at Oxford

Lastest proposal of the PMTs support (3). http://wwwae.ciemat.es/~calvo/Double_Chooz/Drawing/PMT/ASSEMBLY/ Double Chooz collaboration meeting at Oxford

Double Chooz collaboration meeting at Oxford Lastest distribution of the PMTs on the Buffer. This picture summarized the lastest distribution of the PMTs studied with the MC simulation. From the point of view of the integration this distribution have interference problem on those three positions. This imply that it is necessary move the theoretical position of the PMTs on those point as minimum as possible. Double Chooz collaboration meeting at Oxford

Double Chooz collaboration meeting at Oxford Next steps. With the optimal PMT distribution from MC simulation, finalize the PMTs support structure on the Buffer. Design of the mechanical devices to permit machine/weld the different fixation points on the buffer with the acceptable tolerance. Optimize the fabrication process of the different mechanical PMT support pieces. Detailed step by step Cleaning Procedure for the PMT mechanical support pieces, following the TDR. Define the assembly procedure for the PMTs support pieces. Define installation process of the PMTs on the buffer. Define the tooling necessary for those Jobs. Define the Space Requirements to do the previous task. Pressure test at Ciemat during October. Double Chooz collaboration meeting at Oxford