Offsite Manufacture.

Slides:



Advertisements
Similar presentations
1 Location of Partners and customers Who are our customers? MSSL Centre for Process engineering European Space Agency JOANNEUM RESEARCH Swedish Research.
Advertisements

18 July 2001 Work In Progress – Not for Publication 2001 ITRS Test Chapter ITRS Test ITWG Mike Rodgers Don Edenfeld.
European R&D Support Programme ACCESSING EUROPEAN FUNDING FOR RESEARCH AND DEVELOPMENT.
Company Profile National specialized in steel-House technology exploitation, designing, construction, National has had invested 2 million USD at first.
Who we are Blue Clarity are a team of experienced and diverse construction professionals whose expertise offers a bespoke CAD, survey and design package.
HIGH COUNCIL FOR ECONOMY, INDUSTRY, ENERGY AND TECHNOLOGIES 1 Metrology policies to foster the competitiveness of industry J.F. Magaña.
Formative assessment of the Engineering Design process
Procurement Client-Based Approach Siân Mathews, Strategic Partnership Advisor, Skills Strategy 2011.
Economic and sustainable implications of standardised components and modular assembly.
Engineering Engineering Apprenticeships 1 Interested in Engineering Apprenticeships?
Mission Why? General Contractors Insurance Manufacture Labor Sub Contractor Regulatory Agencies Big Business.
Designing a Product Product design is usually a problem that requires a creative Design and/or manufacturing solution.
Are you fit for nuclear? Opportunities for SMEs in the nuclear sector.
Civil Contractors Federation ‘2014 Earth Awards’ Submission Template CATEGORIES 1 and 2 ONLY Company Name (NOTE: if an Alliance then the name of the companies.
Civil Contractors Federation ‘2012 Earth Awards’ Submission Template CATEGORY 1 and 2 ONLY Company Name (NOTE: if an Alliance then the name of the companies.
TWO QUESTIONS: DOES THE UK WANT A CHEMICAL INDUSTRY? AND IS IF SO IS THE UK A PLACE FOR THE INDUSTRY TO INVEST AND GROW? Dr Diana Montgomery Deputy Chief.
Level 2 Unit 4 Producing Engineering Solutions Engineering Diploma Level 2 Unit 4 Producing Engineering Solutions An Approach to Unit Delivery and Assessment.
“Coal Sector Policy Support Programme” This project is funded by the European Union Implemented by Human Dynamics Consortium TACIS Project: “Coal Sector.
Cannon Place, London, UK Resource Efficiency in Construction Eddy Taylor – Head of Sustainability, Laing O’Rourke BASE London, 11 July 2013.
Martin Clarke British Precast 11 February 2009 The Sustainability Advantages of Concrete Structures.
LIANZA Sept Getting it together for libraries : Designing a collaborative learning centre Karen Kealy, Manager, Planning and Projects Information.
Increased Flexibility programmes in partnership with Land-Based Colleges.
Playground Design Process © 2011 Project Lead The Way, Inc. Design and Modeling.
Formative assessment of the Engineering Design process Review questions in handout Write brief, informal answers to each question.
MARKETING & SALES CONS 7820 Professional Business Management COW 5.
Development through partnership Infrastructure Delivery Management Toolkit: 2010 Edition Delivery Process 2: Project Management 1.
Integrated QHSE Policy Statement Kloeckner metals UK is the largest mill independent multi metal stockholder & distributor in the UK and Ireland, and a.
WORK BASED LEARNING. - Create a ‘Work Led’ learning environment - Support learner development and progression - Getting students ‘Work Ready’ - Create.
DfMA – What does it mean? Rob Francis, Skanska. “The distinctive timber viaducts were constructed using common materials which was preserved by Kyanising.
1 Interfaces, Engineering and Standards. 2 Interfaces LoKI Interface document description for deliverables Elements: PBS number, Deliverable description,
Exciting lighting name: group:. product disassembly.
Innovation Centre, National Technological Park – Daughters of Charity Limerick. New Directions Learning Event, Tullamore Court Hotel, May 18 th 2016.
Orientations towards the Scoping Paper H2020 Transport Programme Committee Brussels, 22 June 2016 SMART, GREEN and INTEGRATED TRANSPORT.
e-Learning through e-Government
SHORT COMPANY PROFILE 2016.
INTRODUCTION Kaizen is the Japanese word for "improvement" or "change for the better" refers to a philosophy or practices that focus upon continuous.
The research on usage parameters of wooden buildings
Civil Contractors Federation ‘2017 Earth Awards’ Submission Template CATEGORIES 1 and 2 ONLY Company Name (NOTE: if an Alliance then the name of the.
The Waikato Trades Academy
Nuclear’s Role in Advancing Clean and Secure Energy
Director: Research Coordination, Monitoring and Evaluation
The Forever Open Road programme
GCSE Graphic Products Revision 2008 Examination.
Sustainability and the Built Environment
2017 MHA Annual Event - Celebrations and Aspirations
The Times 100 Business Case Studies
About Xperdyte Xperdyte, the software solution tailor-made for the South African Manufacturer. This comprehensive solution addresses all the critical.
Joseph C. Kvedar Director, Telemedicine Partners HealthCare Systems
How do we address the skills crisis?
Light Gauge Steel Frame
The Newcastle experience
Ann Hodgson, Ken Spours, David Smith and Julia Jeanes
“Effective professional development for teachers is a core
A practical guide to deploying Collaborative Planning and Production Control Keith Bennett and Arran McDonald (Bourton Group)
Centimfe Technological Center for the Mold Making, Special Tooling and Plastic Industries.
Chris Blundell PhD Student Department of Land Economy Supervisor
05 November 2018 Offsite data for onsite assembly Rob Gardiner Armstrong Ceilings Commercial Technical Manager EMEA.
Construction Supply Chain Modeling: Issues and Perspectives (Part 1)
Life after grad By-Nolan Kenoras.
Radisson Blu, London Stansted
Project delivery RIBA stages Define design deliver Key Objectives 1 2
Unit 5 M2: compare traditional and modern construction operations and processes in terms of overall productivity and costs 1) List Traditional methods.
KICK-OFF Overview and thematic approach 19th of June 2017
Civil Contractors Federation ‘2014 Earth Awards’ Submission Template CATEGORIES 1 and 2 ONLY Company Name (NOTE: if an Alliance then the name of the.
Offsite Construction Manufacturing BACH
CICA Project of the Year Entry Template
Presentation by: Ajay Kumar KC
Computer Services Business challenge
EPA Resources for Exporters
Introduction Objectives Common Issues with planning Key importance of CP in construction industry HOW TO IMPROVE THE CONSTRUCTION INDUSTRY THROUGH COLLABORATIVE.
Presentation transcript:

Offsite Manufacture

What we do Manufacture M&E building services solutions for the construction industry Offer customisable solutions that meet the demands of our clients Manufacture these products in a clean and productive facility away from the building site Challenge the norms Innovate through product development Offer something which is fairly unique to the construction industry

Why we do it To enable better health and safety on site To enhance product quality To improve productivity On site: less congestion and improved co-ordination between trades Off-Site: improved as a result of using manufacturing methodologies To reduce programme and allow quicker project delivery To meet innovative construction demands, particularly the limitations of on-site labour To reduce the environmental impact

OffSite manufactured solutions compared against traditional. Why we do It - Programme OffSite manufactured solutions compared against traditional.

Why we do It - Programme Improved Trade interfaces 60% services in 1st visit Logistics Waste Productivity Reduced timescales

Why we do it - Interfaces Improved Management Damage Health & Safety Clear progress Defects

Our Process We are a solutions provider We have a standard process not standard products. Our skill is design for Manufacture 5 step Process Concept Buildability evaluation 3D model Manufacturing Drawings Assembly

Project Specific Solution Our Process Cad-Duct Library Project Specific Solution Components Parts Sub – Assembly’s 80% 20%

Heathrow T5C Nodes