SAE Heavy Lift Cargo Plane

Slides:



Advertisements
Similar presentations
College of Engineering and Computer Science Department of Mechanical and Materials Engineering Wright State University Regular Class Aircraft SAE Aero.
Advertisements

Group 3 Heavy Lift Cargo Plane
Group 13 Heavy Lift Cargo Plane Stephen McNulty Richard-Marc Hernandez Jessica Pisano Yoosuk Kee Chi Yan Project Advisor: Siva Thangam.
Heavy Lift Cargo Plane Proposal Presentation February 17 th, 2005 Matthew Chin Advisor: Prof. S. Thangam Aaron Dickerson Brett J. Ulrich Tzvee Wood.
What is engineering? Engineering - The branch of science and technology concerned with the design, building, and use of engines, machines, and structures.
Critical Book Review Due Dates March 3 rd -1 pg summary due (what you have read to this date, not the whole book)- 25pts March 10 th –Project proposal.
SAE AERO DESIGN 2004 HEAVY-LIFT CARGO PLANE Stephen McNulty Richard-Marc Hernandez Jessica Pisano Yoosuk Kee Chi Yan Project Advisor: Siva Thangam Control.
SAE AERO Chase Beatty (Team Leader) Brian Martinez (Organizer) Mohammed Ramadan (Financial Officer) Noe Caro (Historian) Brian Martinez.
Group 3 Heavy Lift Cargo Plane William Gerboth, Jonathan Landis, Scott Munro, Harold Pahlck February 18, 2010.
Chase Beatty (Team Leader) Brian Martinez (Organizer) Mohammed Ramadan (Financial Officer) Noe Caro (Historian) SAE AERO Chase Beatty.
Group 13 Heavy Lift Cargo Plane Stephen McNulty Richard-Marc Hernandez Jessica Pisano Yoosuk Kee Chi Yan Project Advisor: Siva Thangam.
Heavy Lift Cargo Plane Proposal Matthew Chin, Aaron Dickerson, Brett J. Ulrich, Tzvee Wood October 5 th, 2004 Group #1 – Project #3.
Group 13 Heavy Lift Cargo Plane Stephen McNulty Richard-Marc Hernandez Jessica Pisano Yoosuk Kee Chi Yan Project Advisor: Siva Thangam.
Group 3 Heavy Lift Cargo Plane
Heavy Lift Cargo Plane Group #1 Matthew Chin, Aaron Dickerson Brett J. Ulrich, Tzvee Wood Advisor: Professor Siva Thangam December 9 th, 2004.
SAE Heavy Lift Cargo Plane Advisor: Siva Thangam Group Members: Will Gerboth Jon Landis Scott Munro Harold Pahlck.
BATTAGLIA MARIO FACCIO PEDRO SALAZAR ANDRES 2015 SAE Aero Design East Competition Faculty Advisor: Dr. Dulikravich.
Group 13 Heavy Lift Cargo Plane Stephen McNulty Richard-Marc Hernandez Jessica Pisano Yoosuk Kee Chi Yan Project Advisor: Siva Thangam.
Group 3 Heavy Lift Cargo Plane William Gerboth, Jonathan Landis, Scott Munro, Harold Pahlck October 8, 2009.
Group 13 Heavy Lift Cargo Plane
2015 SAE Aero East Design Team 2015 SAE Aero Design East Team Status Report (April 2, 2015)
[SAE Heavy Lift Cargo Plane] Joe Lojek : James Koryan : Justin Sommer : Ramy Ghaly [Ducks on a Plane] : Advisor Professor Thangam : Thursday, February.
SAE Aero Design West 2008 Information Session. What is the SAE competition? Who - Undergrad and Grad Students (SAE Members) Competition Components - Design.
GROUP MEMBERS: JOHN MERRITT FRANCES OTHERSEN CHRIS DAVIS JAMES CHAPMAN JOSEPH FANNING Baja SAE ® Series 2015 Status Update.
Brian Martinez Chase Beatty Mohammed Ramadan Noe Caro.
SAE AERO Chase Beatty (Team Leader) Brian Martinez (Organizer) Mohammed Ramadan (Financial Officer) Noe Caro (Historian) Chase Beatty.
Real World Design Challenge
Michala Homolova Personal Effectiveness – The Right Decisions Time Management & Effectiveness # 2 Priorities
College of Engineering and Computer Science Department of Mechanical and Materials Engineering SAE AeroDesign East Competition May 4 – 6, 2007 Faculty.
2015 SAE Aero East Design Team 2015 SAE Aero Design East Team Mid-Term Status Report (3/5/2015)
The Lumberjacks Team /16/12 Brian Martinez.
Highly Flexible Design for Gantry Robot Systems Team: F08-77-FLXGANT1 Client: Logic One Robots Contact: Bill Egert, Engr VP.
Group 13 Heavy Lift Cargo Plane Richard-Marc Hernandez Yoosuk Kee Stephen McNulty Jessica Pisano Chi Yan Project Advisor: Siva Thangam.
SAE AERO DESIGN® EAST COMPETITION A SENIOR DESIGN PROJECT PREPARED IN PARTIAL FULFILLMENT OF THE REQUIREMENT FOR THE DEGREE OF BACHELOR OF SCIENCE IN MECHANICAL.
Subsystem Level Design Review.  Project Review  System Level Changes ◦ Tail Dragger ◦ Airfoil Change and Discussion  Subsystem Selection ◦ Fuselage.
Chapter 11 Section 4 Bernoulli’s Principle. Pressure and Moving Fluids Fluids move from an area of high pressure to an area of low pressure example drinking.
2015 SAE Aero Design East Team
DR1 PF, E, & FTP PDR Prototype Fabrication, Economic and Flight Test Plan Preliminary Design Review October 26, 2000 Presented By: Mark Blanton & Chris.
Heavy Lift Cargo Plane Joe Lojek Justin Sommer James Koryan Ramy Ghaly November 7, 2006 Ducks on a Plane.
SAE Aerospace Regular Class High Lift Competition Educational Aircraft Design Objective: To develop a stable, controllable, high lift aircraft to serve.
Basic Aircraft Structure
Sae – aero micro capstone
2007 SAE Heavy Lift Cargo Plane
SAE Aero Design Group 10 Dimitrios Arnaoutis Alessandro Cuomo
Advanced Aero Vehicle Group
GCOS IP and Update on CEOS Response
General Meeting 2/18/2015.
Design/Build/Fly SU DBF
SAE AERO 2017 Joseph Zongolowicz, Kathy Hansen, Nick Montana, Marquis Ward, Frank Dixon, Thomas Houck, Gerald Short, Zhangsiwen Xiao, Kevin Schesventer,
SAE Heavy Lift Cargo Plane
Voice of Customer Presentation
SAE Baja Frame Design Brandt Lamonte, Luke Blocker, Alexandria Williams, Kyle Richert Advisor: Ho-Hoon Lee.
MAE 435 Progress Report 28 March 2016
NEXT Children’s Swimming Lessons
February 16th Meeting.
2017 Housing advisor meeting
SKADS Controller’s Meeting Timeline Annual Financial Report
Payroll Processing pay period end for HR Professionals
SAE Aero East Dejah – I still think the idea of simulating a flight by introducing the team as a flight attendant is a cute idea. If we want to role with.
SENIOR DESIGN PROJECT SELECTION TOPICS: Draft Team Formation
SAE Aero East 2017 MAE 435 Mid-Term Progress Presentation
Key Dates-Odd Days April 26th-Lottery April 28th-Draft & Work Day
Basic Aircraft Structure
  (1.5 hours) (2.0 hours) Monday (14/07) Registration Welcome ( M/FPP)
Monday, March 19th Today will be the first day of three days for the SHARE presenters. Today will be talking about guarding your heart and relationships.
Please save these important dates
FY2016 ESG RFP and Application Information
ME 423 Design Progress Nugget Chart
Extended Christmas Hours Thursday December 8th 9am -6:30pm Friday December 9th 9am -6:30pm Saturday December 10th 9am-6pm Thursday December.
2019 GSPSA Captain’s Meeting
Presentation transcript:

SAE Heavy Lift Cargo Plane Thursday, March 22, 2007 SAE Heavy Lift Cargo Plane Team Members: Joseph Lojek : James Koryan Justin Sommer : Ramy Ghaly Advisor: Professor Siva Thangam

Agenda Recapitulation Progress from last presentation Construction of wing Unforeseen dilemmas Current project status Future Goals Future Tasks Future Deliverables Summary

Recapitulation SAE Aero East Competition Regular Flight Class Design an aircraft in tolerance to specifications Competition - Fort Worth, TX. May 4th – 6th

Progress from last Presentation Materials Ordered Waiting for approved PO 1st Segment of wing constructed 36” segment assembled SAE Aero East Design Report Rough draft (under-review) Report Deadline: Friday, March 23rd 11:59PM O.S. 61 FX Engine Started Engine is operational 3D Model Rendering Completed Final design to construct for SAE competition

1st Segment of Wing Constructed

Construction of Wing Structure Assembly Technique Ribbing ~ 3” spacing Carbon fiber tube – wing rigidity Assembly Technique Framing Gluing & Pinning

3D Model

Unforeseen Dilemmas Delay of Purchase Order 2 weeks since submittal Minimal experience crafting aircrafts Construction very timely Learning curve SAE Aero Design Report intensity and involvement Complexity of calculations Time to get engine first started~ 2.5 hours

Current Project Status Project is currently moving smoothly Completion of 1st wing and SAE Aero Design Report Momentum of work increasing SAE Aero Design Report to be submitted Concerns Deadlines quickly approaching Pressure rising

Future Goals Successful test flights prior to competition Complete airplane Successful test flights prior to competition Compete strongly in the SAE Aero East competition May 4th – 6th

Future Tasks Construction Wings Fuselage/Boom Tail Engine mounting Mono-coat 2nd wing Fuselage/Boom Tail Engine mounting Landing gear assembly

Future Deliverables Completed Aircraft Successful SAE Competition Final Calculations Accurate predictions model Final Report & Presentation Prepared for Senior Design Day

Summary Great deal of progress SAE Aero Design Report rough draft under review Competition quickly approaching Large time commitment required Construction of remaining airplane Test flights proceeding completion SAE Aero East Competition May 4th – 6th Fort Worth, TX

Questions ?