An Analysis of Project Management Practices Related to Constructability followed in Indian Construction Industry Sharmin Khan Assistant Professor, Department.

Slides:



Advertisements
Similar presentations
ENTITIES FOR A UN SYSTEM EVALUATION FRAMEWORK 17th MEETING OF SENIOR FELLOWSHIP OFFICERS OF THE UNITED NATIONS SYSTEM AND HOST COUNTRY AGENCIES BY DAVIDE.
Advertisements

QAA Research Teaching Linkages: Enhancing Graduate Attributes Theme Linda Juleff, QAA Steering Group Representative.
Reducing construction waste through design Dave Marsh Construction Project Manager.
Equalities and Procurement Workshop 1 Identifying Need and Creating the Specification Buying Better Outcomes.
Continuous Value Enhancement Process
1 BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Procurement Methodology David Dale NLSL II Procurement Manager.
Green Supply Chain Management. Introduction u Background u Product Life Cycle u Supply Chain Management u Industry Practices u The Future u Conclusions.
AN INVESTIGATION INTO THE EFFECTIVENESS OF PARTNERING IN PROMOTING HEALTH AND SAFETY MANAGEMENT ON CONSTRUCTION SITES Brian C Heath BSc, MSc, MRICS Directorate.
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
TOOL TO DESIGN FOR CONSTRUCTION WORKER SAFETY An Article Written by Gambatese, Hinze and Haas 1997.
Spring 2008, King Saud University Engineering Administration Dr. Khalid Al-Gahtani 1 What is a Project? “A Project is a one-shot, time-limited, goal- directed,
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
ARCH 330- Materials/Methods The course will cover the systems associated with construction materials methods and sequencing primarily in building construction.
CDM & RIBA Plan of Work th June 2013 Ross Gooding – Principal Health and Safety Consultant / CDMC.
ICEE 2005GLIWICE, POLAND JULY 2005 FEDERAL CENTER OF TECHNOLOGICAL EDUCATION – CEFET-RJ – BRAZIL PRODUCTION ENGINEERING DEPARTMENT CSCW: A FORMATION.
Industrial Engineering I
University of Warsaw The Office for Quality of Education 11th of December th of December 2008.
Current Design and Implementation Challenges of Road Projects on the Coastland Ron Rahaman Chief Roads and Bridges Officer Ministry of Public Works Works.
Delay In Construction Project In West Bank. Outline:  Background.  Research objective & methods.  Important factors that cause time and cost overrun.
L3: GP METHODOLOGY / 1 Asian Productivity Organization, Tokyo Overview and Methodological Framework of GP Methodology Guiding Principles of GP GP Methodology.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
THE PROJECT CYCLE By Dr. Peter Quartey (ISSER, Univ. of Ghana)
College of Environment Design Construction Engineering Technology Assessment of Constructability Practice Among General Contractors in The Eastern Province.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Mittuniversitetet Effective digital information management ? Göran Samuelsson The status of information management in a number of public authorities via.
What is “Constructability”?
University of Warsaw. The quality of education assurance and enhancement system at the University of Warsaw.
Brittany Giel University of Florida Ph.D. Candidate Center for Advanced Construction Information Modeling January 8, 2013 Measuring Success - Metrics.
BTEC Nationals – Unit 5 Construction Technology and Design in Construction and Civil Engineering.
Government Engineering college Gandhinagar. Subject: Engineering economics & Management Topic: cost Prepared By Name: Enrollment No.: Nikhil Chaudhari.
TOTAL QUALITY MANAGEMENT
West Bowers Matt Ragas Jeff Neely University of Florida May 22, 2009.
Facilities Planning. Facility planning engages in supervising the planning, programming, designing, construction approach, operation and maintenance.
Introduction to Energy Efficient Design
A cooperative program to serve all of India
GOVERNMENT OF TAMIL NADU HIGHWAYS DEPARTMENT HIGHWAYS RESEARCH STATION Training program for newly recruited Assistant Engineers.
The research on usage parameters of wooden buildings
Where We Are and Where We Want to Be
Façade Management Consulting
Yukon Government 3rd Annual Industry Conference
TOPIC: THE VALUE OF BIOMEDICAL ENGINEERS AND TECHNICIANS IN HOSPITAL PRESANTED BY: KWIZERA ABRAHAM STUDENT IN: BMET /FINALIST STU INSTITUTION: IPRC KIGALI.
The most represented stakeholders within the NAPA process were governments, followed by research institutions, UN Agencies and local communities. Private.
Sustainability and the Built Environment
Faculty of Postgraduate Studies and Scientific Research German University in Cairo Modeling to Reduce Variation Order in Construction Projects in Egypt.
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Investment Logic Mapping – An Evaluative Tool with Zing
PROJECT MANAGEMENT (ARCH 484) DEPARTMENT OF ARCHITECTURE & BUILDING SCIENCE.
TOTAL Productive MAINTENANCE
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
in Construction Industry
The Public Sector Equality Duty
CAPACITY DEVELOPMENT OF EMBs
Assessment and Accreditation
Introduction DEFINATION :-
Gongbo Lin & Qiping Shen Journal of Management in Engineering
THE RESEARCH PROCESS.
Green Building and Sustainable Architecture
The Public Sector Equality Duty
CHAPTER 14 SETTING A DIRECTION FOR INFORMATION RESOURCES
CHAPTER 14 SETTING A DIRECTION FOR INFORMATION RESOURCES
Finalization of the Action Plans and Development of Syllabus
‘ Causes of Delay During Construction Phase at Palestine ’
System Analysis and Design:
5th PASET Forum Kigali, Rwanda| May 22, 2019
“BPR AS A MEANS OF REINVENTING THE ORGANIZATION: AN OVERVIEW”
« Survey on PRODCOM data collection in other MS
ROLE OF ARCHITECTS ABHISHEK RAJ. Architect makes a plan, designs and then review the process of building construction. Architect is a person who makes.
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

An Analysis of Project Management Practices Related to Constructability followed in Indian Construction Industry Sharmin Khan Assistant Professor, Department of Architecture, ZHCET, AMU, Aligarh, India sharmin_amu@rediffmail.com

The research presented comprises of…….. Need to Study Objectives of study Methodology adopted for study Data Collection and Analysis Results and Discussion

Conceptual Design Stage NEED TO STUDY….. Life Cycle of Building Conceptual Design Stage Initial stage of design Demolition Stage Useful life of building is over

NEED TO STUDY…. Design Construction Building Project

NEED TO STUDY…. Project Design & Construction process comprises of: Conceptual Design Stage Design Development Stage Field Operations Stage

The Research Questions….?? Are the Architects in India practising the principles of Constructability? What is the extent to which the principle of Constructability are followed in the Indian construction industry, at Conceptual planning stage?

Objectives of Study…. To assess the level to which certain parameters of Constructability being followed in the Indian construction industry, at Conceptual planning stage of project. To identify the important areas of project management which are being neglected in the present scenario and which need concern and focus of project participants, at initial stage of work.

Methodology adopted for Study Literature study from secondary resources. Formulation of close ended structured questionnaire. Online survey with random sampling. Data Collection and Analysis Results and Discussion # 111 Responses were received and 106 responses were used for data analysis.

Literature Study…. CII has defined Constructability as “the optimum use of construction knowledge and experience in planning, engineering, procurement and field operations to achieve overall project objectives”. Construction Industry Institute (CII), US Constructability is also defined as, “the ease with which the raw materials of the construction process (labour, production, equipment, tools, materials and installed equipment) can be brought together by a builder to complete the project in a timely and economic manner”.

Principles of Constructability Integration, Coordination, Bidding Process, Construction driven schedule, Simplification of Design, Standardization of element, Prefabrication, Accessibility to Site, Adverse weather conditions, Specifications, Encouragement to Innovations, Past Lessons Learned Exercise & Reviews, Availability of Resources, Appraise Recycling, Waste Management, Employment of Advance Information Technology

Data Collection & Survey This study was focussed on Conceptual Design Stage of Building Project These questions were related to issues like: who were the team members at initial stage of project conducting of surveys layout of site for construction efficiency preparation of design construction and procurement schedules discussion and considerations on recycling and review meeting

Results…..the respondents

Results…..the respondents

Results…..the team members

Results…..the schedules prepared

Results…..the RESPONSES FOR ACTIVITIES

conclusions….. The Contractors, Project Managers and Consultants are not very frequently involved at Conceptual design stage. The possible causes may be that their fee initiates the moment they are involved in the project. This is a major constraint in their involvement, but it results in heavy losses at a later stage in the form of rework, amendments in working drawings, delays in projects and lack of coordination among team members. A possible solution can be Design-Build projects.

Results…..the RESPONSES FOR ACTIVITIES Layout of site needs special concern and it should be taken care of, so that the construction process can be carried out efficiently and smoothly. Regular review meetings are not conducted at Conceptual design stage of work, which may also lead to reworks and delays.

Results…..the RESPONSES FOR ACTIVITIES Procurement Schedules are not prepared in most of the cases, which may lead to problems of delay because of non-availability of resources on time and wastage of labour. Discussion on recycling is an important component, which is still not entertained much in discussions among the project participants. The specified specifications should consider the recycled materials.

There is a need to: Integrate Project Managers, Consultants and Contractors at initial stage of design for better coordination. Design with a concern for increasing site efficiency and ease during execution of project. Consider recycling of building materials. Promote review meetings at initial stage of design.

Benefits…. Reduced delays Reduced rework Better coordination Ease of construction Controlled project cost High level of satisfaction Experience of all team members incorporated