Complementary ISTC Projects #3888, 3889p

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
D.S. proposal 18/12/2003 R. Garoby 1 PROTON DRIVER ACTIVITY Present work program: IPHI-SPL collaboration HIPPI Joint Research Activity [CARE] Proton driver.
CSC, Status of HIPPI – September 2006 Maurizio Vretenar Alessandra Lombardi.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
CSC, , A. Lombardi. 1 Status of HIPPI – April 2007 Maurizio Vretenar Alessandra Lombardi.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
Update on Be Wall Cavity Steve Virostek Lawrence Berkeley National Lab MTA RF Workshop November 15, 2010.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
ANL HWR Cryomodule Status Update 27 January 2015 Zachary Conway On behalf of the ANL Linac Development Group Argonne National Laboratory Physics Division.
Cell-Coupled Drift Tube Linac M. Pasini, CERN AB-RF LINAC4 Machine Advisory Committee 1 st meeting CERN January 29-30, 2008.
Fermilab Cavity Refurbishment Status J. Reid M. Slabaugh November 19, 2014 J. Reid 1.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
Question 27: Outline the key steps for industrialization of machine components and the likely remaining vulnerabilities in achieving them. Achieving industrialization.
Linac4 Status C. Carli presenting (a slightly adopted selection of) slides prepared by and on behalf of M. Vretenar Looking from this point and with a.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
ISTC Project #3888 Development, manufacture and experimental investigation of a unique pilot CCDTL accelerating section in the energy range of MeV.
Development of the Room Temperature CH-DTL in the frame of the HIPPI-CARE Project Gianluigi Clemente,
Refurbished Booster RF John Reid October 24, 2012.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Linac4 Status 1 M. Vretenar sLHC public event
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
Xx-xx-2010, tanks arrive from Snezhinsk to Novosibirsk A.Tribendis, July 19-21, 2010, Snezhinsk 1. Check cavity dimensions on a CMM 2. Assemble and measure.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
TBTS Test Program & Schedule G. Riddone
Ports: purpose –vacuum, rf location –accelerating cavity, coupling cavity dimensions … Already discussed, but some points need to be double checked …
BINP geometry (= cavity inner dimensions which define the boundary) is based on CERN geometry (as of August 4, 2008) with some adjustments made in order.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
Linac4 status and long-term schedule M. Vretenar, Project Meeting  status  timeline  open issues  status  timeline  open issues.
Wolfgang Vinzenz FAIR Proton Linac 10 th FAIR MAC November 25 th and 26 th 2013 Proton Linac 1 Status Buncher Design  Rectangular design, longitudinal.
ALBA RF System Paco Sanchez - 13th ESLS RF - DESY, 30 September Paco Sanchez, RF Group, CELLS (Consortium for the Exploitation of the Synchrotron.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
650 MHz Beta = 0.61 Cavity Design, Fabrication and Testing R. Rimmer for F. Marhauser Jefferson Lab, Newport News, Virginia 23606, USA Project-X Collaboration.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: RF system group Paolo Craievich :: RF Section :: Paul Scherrer Institut SwissFEL.
PIP Update May Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing.
LINAC 4 CCDTL Accelerating Structure SO SO Aluminum foil H = 0,3…0,5 mm Module of CCDTL Accelerating Structure.
ELENA installation progress F. Butin / ELENA collaboration.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
ISTCInternational Science and technology Center, MoscowOfficial Coordinator BINPBudker Institute of Nuclear Physics of Siberian Branch of Russian Academy.
Linac4 & SPL Status of preparation and Opportunities M. Vretenar (R
S1G Experiment Schedule Plan
Quality assurance for Manufacturing Dressed Cavities for SPS prototype cryomodule C. Parente (HL-LHC Technical Quality Officer) Date:
STATUS OF CIEMAT CONTRIBUTION TO CTF3 ( )
CSP 25th November 2010 Technical agreement number 3: overview
Linac4 M. Vretenar for the Linac4 design team
Overview of the RFCC Module and 201-MHz Cavity Design
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1
FFAG Magnets and Girders Meeting
Physics design on Injector-1 RFQ
Notes on Ramp-Up and Production
TIARA WP8 Status M. Biagini, INFN-LNF, for WP8 TIARA Mid-Term Meeting
Far Detector Activities Late 2017 – Early 2018
Superconducting RF Crab Cavities
MICE Coupling Coil Update
Teleconference ACS – FREIA 20th February 2018
HIE-LINAC status report
LARP Rotatable Collimators for LHC Phase II Collimation
Advanced Research Electron Accelerator Laboratory
LARP Phase II Secondary Collimator RC-1
Teleconference ACS – FREIA 19th June 2017
ThomX – Commissioning Meeting – 25/01/2018
UPPSALA UNIVERSITY_GERSEMI PROJECT
Presentation transcript:

Complementary ISTC Projects #3888, 3889p for the construction of CCDTL accelerating section of Linac4 Within these 2 projects it is foreseen to develop, manufacture and test CCDTL accelerating section of Linac4 (21 accelerating cavities in 7 modules, ~25m). ►►► The developments and results of the project 2875 will be fully exploited ◄◄◄ Distribution of works will be similar: 1 The design of Linac4 CCDTL accelerating section will be developed jointly by all the participating parties. 2 Tanks and support frames will be built at VNIITF. After copper plating and a test assembly the modules will be shipped to BINP. BINP will build and install the drift tubes and take care of the rf tuning and final assembly. 3 Rf conditioning and high power tests of all the 7 modules will be done at CERN. Slide from kick-off meeting on the ISTC Linac4 Projects held at CERN on October 29, 2009

Complementary ISTC Projects #3888, 3889p for the construction of CCDTL accelerating section of Linac4 Although the CCDTL prototype built within the ISTC Project 2875 performed good, certain design and production technology improvements will be implemented to the CCDTL modules to be built. Drift tube will be brazed rather than EB-welded. Drift tube to tank connection will be dismountable rather than permanently welded. Alignment concept and procedure will be different. + modifications in the vacuum pumping scheme, optimization of the water cooling scheme This calls for more R&D activities, which are in progress now. We still believe we can follow the schedule in general Year 1 (June 2009 – May 2010) Year 2 (June 2010 – May 2011) Year 3 … Nov 2012 Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10 304L OFHC Cu Auxiliaries Tanks VNIITF  BINP M 1 M 2,3 M 4,5,6 M 7 Modules BINP  CERN M 1 M 2,3 M 4,5 M 6,7 Slide from kick-off meeting on the ISTC Linac4 Projects held at CERN on October 29, 2009

Complementary ISTC Projects #3888, 3889p for the construction of CCDTL accelerating section of Linac4 Current status BINP Drift tube mock-ups and a test vacuum vessel with drift tube girder are being made and should be finished in Dec. 2009 Auxiliary tools. Assembly table is being made and should be finished in Dec. 2009 Drift tube alignment tools are being made and should be finished in Dec. 2009 Aluminum dummy drift tubes for measuring resonant frequencies of the cavities upon their arrival from VNIITF should be finished in Dec. 2009 Test and measurement area should be finished in Dec. 2009 As soon as the materials for drift tubes and tuners are delivered to BINP, manufacturing will start. Final machining will be done after rf measurements of actual tanks received from VNIITF. VNIITF Galvanic shop upgrade (aimed at handling large half-tanks of high energy modules) is in progress Technological tools have been designed, procurement of the materials for the tools and procurement of standard tools are in progress. Execution drawings of the tanks and coupling cells are prepared and will be transferred to the Workshop as soon as all the design modifications are finalized. Manufacturing will start as soon as the materials for tanks and coupling cells are delivered to VNIITF. Slide from kick-off meeting on the ISTC Linac4 Projects held at CERN on October 29, 2009

Complementary ISTC Projects #3888, 3889p for the construction of CCDTL accelerating section of Linac4 Current status BINP Drift tube mock-ups and a test vacuum vessel with drift tube girder are being made and should be finished in Dec. 2009 – completed in February 2010 Auxiliary tools. – completed by December 2009 Assembly table is being made and should be finished in Dec. 2009 Drift tube alignment tools are being made and should be finished in Dec. 2009 Aluminum dummy drift tubes for measuring resonant frequencies of the cavities upon their arrival from VNIITF should be finished in Dec. 2009 Test and measurement area should be finished in Dec. 2009 – completed in March 2010 As soon as the materials for drift tubes and tuners are delivered to BINP, manufacturing will start. – materials arrived in January 2010, during this meeting we expect to agree on the DT design and production technology. Final machining will be done after rf measurements of actual tanks received from VNIITF. VNIITF Galvanic shop upgrade (aimed at handling large half-tanks of high energy modules) is in progress Technological tools have been designed, procurement of the materials for the tools and procurement of standard tools are in progress. Execution drawings of the tanks and coupling cells are prepared and will be transferred to the Workshop as soon as all the design modifications are finalized. Manufacturing will start as soon as the materials for tanks and coupling cells are delivered to VNIITF.