Repairing the MSE Mirrors

Slides:



Advertisements
Similar presentations
PH0101 UNIT 1 LECTURE 1 Elasticity and Plasticity Stress and Strain
Advertisements

1 Chapter 7 Length of flange Introduction As the bending moment decreases towards the support, the flange plate may be varied and a smaller flange.
Parameters Used in Machining Optimization (Draft 1) Leon Xu The Boeing Company December 20, 2007.
Chp12- Footings.
FEA - Stress Levels & Concentration A change in the shape of a component carrying a load will have the effect of increasing the stress, nearly always at.
Design of Concrete Structure I
IE 337: Materials & Manufacturing Processes
ME 450 Group Adrian Conrad Chris Cook Thomas Hylton Nathan Wagers High Pressure Water Fixture Conceptual Design Analysis December 10, 2007.
UNIT 13 : HEAT 13.1 Thermal Conductivity 13.2 Thermal Expansion.
Shear Force and Bending Moment
ONE-WAY SLAB. ONE-WAY SLAB Introduction A slab is structural element whose thickness is small compared to its own length and width. Slabs are usually.
Bending Moments A bending moment exists in a structural element when an external force is applied to the element so that the element bends (or wishes to.
CTC / MTC 222 Strength of Materials Chapter 1 Basic Concepts.
MAE 314 – Solid Mechanics Yun Jing
337: Materials & Manufacturing Processes
Products made from rolling
Connection of flange plate with web
Slide HALLD TAGGER MAGNET STRUCTURAL ANALYSIS Presented by William Crahen 6/10/09 Pole Plate analysis Vacuum chamber analysis Vacuum chamber tie rods and.
CM 197 Mechanics of Materials Chap 20: Connections
Introduction: Standard Test Method for Density (unit weight), Yield, and Air Content (Gravimetric) of Concrete –Apparatus –Sample –Procedure ACI Certification.
CM 197 Mechanics of Materials Chap 14: Stresses in Beams
Home Work #4 Due Date: 18 Mar, 2010 (Turn in your assignment at the mail box of S581 outside the ME general office) The solutions must be written on A4.
Copyright © 2011 Pearson Education South Asia Pte Ltd
Copyright © 2011 Pearson Education South Asia Pte Ltd
Minimum Weight Wing Design for a Utility Type Aircraft MIDDLE EAST TECHNICAL UNIVERSITY AE 462 – Aerospace Structures Design DESIGN TEAM : Osman Erdem.
CONSTRUCTING A FIVE CABIN LATRINE
MECHANICS OF MATERIALS 7th Edition
Forming and Shaping ISAT 430 Module 7 Spring 2001ISAT 430 Dr. Ken Lewis 2 Forming and Shaping Meanings blend Forming means changing the shape of an existing.
1 Design and drawing of RC Structures CV61 Dr. G.S.Suresh Civil Engineering Department The National Institute of Engineering Mysore Mob:
Sheetmetal Bending.
University of Palestine
Multiple Coil Lift Calculation. Purposes of the Study  To investigate the stress distribution in the MCWF and the lifting device.  To make sure mounting.
Extra Examples.
FOOTINGS. FOOTINGS Introduction Footings are structural elements that transmit column or wall loads to the underlying soil below the structure. Footings.
CTC / MTC 222 Strength of Materials Chapter 1 Basic Concepts.
Solidworks Exercise Modeling the piston (30 minutes) Open a new part file and Save as Piston.sldprt Create the Cylinder Click on Top Plane (or plane 2)
An Analysis of Shell Structure for Dead Load H.M. Fan PPPL September 16, 2005.
SHEET METAL FORMING.
1 Manufacturing Projects Flexible Manufacturing Copyright © Texas Education Agency, All rights reserved.
Chapter 2: Total Hydrostatic Force on Surfaces
Theoretical Mechanics STATICS KINEMATICS
6- Calculation of shear stress at composite interface: A)Under service load: Strain and stress distributions across composite beam cross- section, under.
Sam Krueger.  Entertainment Center  Preliminary design  Initial  36 plies, glass epoxy  [0 11 /±45 1 /90 5 ] s  No core  Modified design  36 plies,
15.75 in quick check of fields in a test structure – design will be improved A Ross Engineering Toroid water jetted plate ground plane shaped button cable.
Introduction Lathe is a machine, which removes the metal from a piece of work to the required shape &size The basic lathe that was designed to cut cylindrical.
Analysis of sheet metal cutting
GOVERNMENT ENGINEERING COLLEGE, BHARUCH (014) Chemical Engineering department SEM-iii Sub: fluid flow operation topic: orifice meter & rotAmeter Guid by:
ENM208 INTRODUCTION to MACHINING ANADOLU UNİVERSITY Industrial Engineering Department.
4. Local strength calculation
Fundamentals of Metal cutting and Machining Processes THEORY OF METAL MACHINING Akhtar Husain Ref: Kalpakjian & Groover.
PRESSURE VESSEL. 1.Determine the bursting steam pressure of a steel shell with diameter of 10 inches and made of ¼ in thick steel plate. The joint efficiency.
DESIGN AND DEVELOPMENT OF GRINDING ATTACHMENT ON LATHE MACHINE
Snag Boat Final Presentation
Rolling of Metals Rolling Processes Dr.Adel Fathy 1.
Shear in Straight Members Shear Formula Shear Stresses in Beams
Sit down, get quiet, get ready to play
Pure Bending.
Industrial Skills Fasteners & Hardware.
Structure II Course Code: ARCH 209 Dr. Aeid A. Abdulrazeg
CE Steel Design Class By, Amit H. Varma
Chapter 5 Power Estimation in Extrusion and Wire-rod Drawing
Visit for more Learning Resources
Structure I Course Code: ARCH 208 Dr. Aeid A. Abdulrazeg
Lecture 9 – Deformation and Damage
Lab #1 due TODAY!!!!!  HW#5 due Wednesday, 2/11
Scrapers It’s All About the Bur
Lecture 9 – Deformation and Damage
GENERAL MOULD CONSTRUCTION CONCEPT
Presentation transcript:

Repairing the MSE Mirrors Steve Scott Howard Yuh Bob Granetz + Cast of thousands MSE mirror repair 6jan03.ppt

MSE mirror repair 6jan03.ppt Status We are pursuing solutions based on both metal and glass mirrors. Glass (Yuh): design of new support “ring” structure is completed. No glass-to-metal contact. Use existing mirrors. Mirror is supported along its entire periphery No bolts used through the mirror  no tensile forces Steel and telfon should arrive tomorrow. Water-jet cutting starts tomorrow – hopefully. Machining starts Thursday (?) May hold off a day or two for stress analysis (Rui) Metal (Scott): design nearing completion Major issues are disruption forces  minimize thickness. But then need to support mirror during polishing. Rib design seems to satify both requirements. Have some initial bids for polishing and coating – waiting for more. MSE mirror repair 6jan03.ppt

Simple estimate of disruption forces during disruption V = df / dt = A (cos q) dB/dt = 0.12 * 0.20 * 0.71 * 1000 = 17 volts E = V / perimeter = 17 / 2*(0.12+0.20) = 26.6 volts / meter = 1.4 106 / Ohm-m I = sE * 0.03 * 0.002 = 2235 Amps Force = I Bt * length = 2235 * 8 Tesla * 0.12 = 2145 Newtons Moment = 2 * Force * (L/2) = 2 * 482 * (0.2/2) = 429 Newton-m English Units: Force = 482 pounds Moment = 190 foot-pounds 12 cm 3 cm dB/dt = 1000 T/s 20 cm 0.2 cm dB/dt F = I x B x 0.12 m Edge view Bt 20 cm F = I x B x 0.12 m MSE mirror repair 6jan03.ppt

Better estimate of currents during disruption Integrate induced current over an ensemble of small rectangles. b = 15 cm For each rectangle, compute differential force = I x B * length x y dB/dt = 1000 T/s a = 23 cm h= 0.2 cm Result: Fb = b3 h (dB/dT) Bt cos(q) / 12 r (1+ (b/a)2) Example: a = 0.23, b = 0.15, h = 0.002, dB/dt = 1000, B = 8, cos(q) = 0.71, r = 72 x 10-8 Ohm-meters  Fb = 3113 Newtons = 700 Pounds. MSE mirror repair 6jan03.ppt

Force on screws that affix mirror to back-plate F = 3113 N 2210 Vertical stress = 2210 N / area of screw / number of screws. Assume 2 screws, 2mm diameter. Area = 3.14 10-6 m2 Stress = 2210/ 3.14 10-6/2. = 3.5 108 Pascal = 350 MPa. For two 3mm screws, Stress = 235 MPa 2210 q “… Therefore, when designing stainless steel parts, a value of 30,000 psi (207 mPa) is considered the limiting stress for determining safety factors.” http://www.dezurik.com/AppData_PDF/10_60_1.pdf F = 3113 N 2210 Note: there is no shear stress on bolts because there is an equal and opposite force on the other side of the plate. backing plate 2210 flange MSE mirror repair 6jan03.ppt

MSE mirror repair 6jan03.ppt Conceptual Stainless Steel Mirror M2 for Motional Start Effect Diagnostic on Alcator C-Mod Flat surface: final grinding and coating by vendor. Substrate: single-piece of austenetic steel rough-machined by MIT Shape is an ellipse with ends cut off 6.142 Small (approx 1 mm) 45o bevel along entire top edge 5.748 All dimensions are approximate Steve Scott 617-253-8695. sscott@psfc.mit.edu or sscott@pppl.gov MSE mirror repair 6jan03.ppt

M2 Mirror: front view of coated surface Polished / coated area 3.071 9.055 2.874 6.142 2.874 3.071 Leave sharp 90o edge – no chamfer 5.748 Steve Scott 617-253-8695. sscott@psfc.mit.edu or sscott@pppl.gov MSE mirror repair 6jan03.ppt

MSE mirror repair 6jan03.ppt M2 Mirror: rear view Rim = 0.5 cm thickness typ. Fill with metallic mixture having a low melting Temperature (200oF) Leave extra support for bolts 23.0 cm 15.6 cm How many bolt holes, and what size? Tapped holes (not through-holes) -- how many, and what size? 0.2 cm 14.6 cm Removable polishing inserts Steve Scott 617-253-8695. sscott@psfc.mit.edu or sscott@pppl.gov 0.5 cm MSE mirror repair 6jan03.ppt

How much support is req’d during polishing? P = Polishing pressure (60 PSI?) Deflection = 0 along rim h a Maximum deflection (at center) = 0.1875 P (1-n2) a4 / (E h3) (MKS) For stainless steel, E = 207 109 and n = 0.3 In funny but usable units: Deflection (# 660 nm wavelengths) = 0.086 PPSI a4(cm) / h3(mm) Example: 10 wavelengths, 60 PSI, a = 2.0 cm  h = 2.4 mm Conclusion: to keep maximum deflection below 10 wavelengths, need support every Couple of cm, and a thickness of order 2 mm. MSE mirror repair 6jan03.ppt

MSE mirror repair 6jan03.ppt Conceptual Stainless Steel Mirror M3 for Motional Start Effect Diagnostic on Alcator C-Mod Substrate: single-piece of austenetic steel rough-machined by MIT. Final grinding, smoothness and coating by vendor. 9.055 5.748 Small (approx 1 mm) 45o bevel along entire top edge Steve Scott 617-253-8695. sscott@psfc.mit.edu or sscott@pppl.gov MSE mirror repair 6jan03.ppt

MSE mirror repair 6jan03.ppt Conceptual Stainless Steel Mirror M2 for Motional Start Effect Diagnostic on Alcator C-Mod Flat surface: final grinding and coating by vendor. Substrate: single-piece of austenetic steel rough-machined by MIT Shape is an ellipse with ends cut off 15.6 cm Small (approx 1 mm) 45o bevel along entire top edge 14.6 cm 1 cm All dimensions are approximate Steve Scott 617-253-8695. sscott@psfc.mit.edu or sscott@pppl.gov MSE mirror repair 6jan03.ppt

MSE mirror repair 6jan03.ppt Conceptual Stainless Steel Mirror M3 for Motional Start Effect Diagnostic on Alcator C-Mod Substrate: single-piece of austenetic steel rough-machined by MIT. Final grinding, smoothness and coating by vendor. 23.0 cm 14.6 cm 7.05 cm 1 cm 1.305 cm Small (approx 1 mm) 45o bevel along entire top edge Steve Scott 617-253-8695. sscott@psfc.mit.edu or sscott@pppl.gov MSE mirror repair 6jan03.ppt

M2 Mirror: front view of coated surface Polished / coated area 7.8 cm 23.0 cm 7.3 cm 15.6 cm 7.3 cm 7.8 cm Leave sharp 90o edge – no chamfer 14.6 cm Steve Scott 617-253-8695. sscott@psfc.mit.edu or sscott@pppl.gov MSE mirror repair 6jan03.ppt

MSE mirror repair 6jan03.ppt All dimensions are approximate M2 Mirror: rear view Rim = 0.5 cm width typ. Pillars 0.5 cm x 0.5 cm Spaced about 2.0 cm on-center Note: total rim thickness = 1.0 + 0.160 (button) + 0.159 (original plate) + Dx (for polishing, tbd) 2mm-wide slices 23.0 cm Leave extra support for bolts How many bolt holes, and what size? 15.6 cm Tapped holes (not through-holes) -- how many, and what size? Pillar (typ) rim 0.5 cm 0.2 cm 14.6 cm 0.1587 1.319 + Dx cm 0.5 cm Backing plate Steve Scott 617-253-8695. sscott@psfc.mit.edu or sscott@pppl.gov Machine pillar faces flush with face of back MSE mirror repair 6jan03.ppt

MSE mirror repair 6jan03.ppt All dimensions are approximate M2 Mirror: rear view Rim = 0.2 width Pillars 0.2 x 0.2 Spaced about 2.0 cm apart Note: total rim thickness = 1.0 + 0.160 (button) + 0.159 (original plate) + Dx (for polishing, tbd) = 1.319 cm = 0.519 + Dx 23.0 cm Leave extra support for bolts Try for bolts about 3mm diameter? 6.142 Tapped holes (not through-holes) -- how many, and what size? Pillar (typ) rim 0.2 0.078 5.748 0.519 + Dx 0.2 Backing plate Steve Scott 617-253-8695. sscott@psfc.mit.edu or sscott@pppl.gov Machine pillar faces flush with edge of rim MSE mirror repair 6jan03.ppt

MSE mirror repair 6jan03.ppt M3 Mirror: front view Polished / coated area 11.5 cm 23.0 cm 14.6 cm 9.91 cm 3.70 cm Steve Scott 617-253-8695. sscott@psfc.mit.edu or sscott@pppl.gov MSE mirror repair 6jan03.ppt

MSE mirror repair 6jan03.ppt M3 Mirror: front view Polished / coated area 4.528 9.055 5.748 cm 3.902 1.457 Steve Scott 617-253-8695. sscott@psfc.mit.edu or sscott@pppl.gov MSE mirror repair 6jan03.ppt

MSE mirror repair 6jan03.ppt M3 Mirror: front view Polished / coated area 11.5 cm 23.0 cm 14.6 cm 9.91 cm 3.70 cm Steve Scott 617-253-8695. sscott@psfc.mit.edu or sscott@pppl.gov MSE mirror repair 6jan03.ppt

MSE mirror repair 6jan03.ppt M3 Mirror: rear view 6.55 cm Rim width = 0.5 cm Pillars 0.5 cm x 0.5 cm 6.47 6.97 1.242 1.11 Rib width = 0.5 cm 11.5 cm 6.47 1.242 23.0 cm Cuts through rim: 0.2 cm wide 1.262 14.6 cm 1.242 1.262 9.91 cm 6.97 6.47 7.3 cm Steve Scott 617-253-8695. sscott@psfc.mit.edu or sscott@pppl.gov 3.70 cm MSE mirror repair 6jan03.ppt

MSE mirror repair 6jan03.ppt M3 Mirror: rear view 6.55 cm Rim width = 0.5 cm Pillars 0.5 cm x 0.5 cm 6.47 6.97 1.242 1.11 Rib width = 0.5 cm 11.5 cm 6.47 1.242 23.0 cm Cuts through rim: 0.2 cm wide 1.262 14.6 cm 1.242 1.262 9.91 cm 6.97 6.47 7.3 cm Steve Scott 617-253-8695. sscott@psfc.mit.edu or sscott@pppl.gov 3.70 cm MSE mirror repair 6jan03.ppt

MSE mirror repair 6jan03.ppt M3 Mirror: rear view 6.55 cm Rim width = 0.5 cm Pillars 0.5 cm x 0.5 cm 6.47 6.97 Rib width = 0.5 cm 11.5 cm 6.47 23.0 cm Cuts through rim: 0.2 cm wide 14.6 cm Check thickness… 9.91 cm 6.97 ? ? 6.47 0.2 0.078 0.519+Dx 7.3 cm Machine face of pillars to be flush with rim Steve Scott 617-253-8695. sscott@psfc.mit.edu or sscott@pppl.gov 3.70 cm MSE mirror repair 6jan03.ppt

MSE mirror repair 6jan03.ppt M3 Mirror: rear view Rim width = 0.2 Pillars 0.2 x 0.2 2.744 Rib width = 0.2 4.528 Space pillars about 0.75-0.8 inches apart. 3-4 pillars per region should suffice. 2.542 9.055 5.748 3.902 Check thickness… 2.744 0.078 0.2 0.519+Dx 2.874 Machine face of pillars to be flush with rim and ribs Steve Scott 617-253-8695. sscott@psfc.mit.edu or sscott@pppl.gov 1.457 MSE mirror repair 6jan03.ppt

Force on srews that affix mirror to back-plate Deflection of end-loaded cantilever beam, length L, Width = w, thickness = t, force = F I = = w * t3 / 12 Deflection = Force * L3 / 3EI = 4 F (L/t)3 / (wE) E = 207 109 Here, L = 0.1, w = 0.12, t = 0.002, F = 2145, So deflection = 0.04 meters  force must be taken by the screws. F = 2145 N q Argument below is bogus Shear force = F sin(q) = f * 0.71 = 1523 Newtons Shear force per screw = 1523 / n (n = # screws on top segment) Assume a 2mm diameter screw: area = 3.1 10-6 m2 Shear stress = 1523 / (3.1 10-6 )/ n = 4.91 108/n newtons/m2 Assume 2 screws: shear stress = 2.5 108 newtons/m2 ? = 68% of ultimate shear strength? MSE mirror repair 6jan03.ppt

Force on srews that affix mirror to back-plate F = 3113 N Deflection of end-loaded cantilever beam, length L, Width = w, thickness = t, force = F I = = w * t3 / 12 Deflection = Force * L3 / 3EI = 4 F (L/t)3 / (wE) E = 207 109 Here, L = 0.1, w = 0.12, t = 0.002, F = 2145, So deflection = 0.04 meters  force must be taken by the screws. 2210 2210 q Vertical stress = 1523 N / area of screw/ number of screws. Assume 2 screws, 2mm diameter. Area = 3.14e-6 m^2 Stress = 1523./ 3.14e-6/2. = 2.4 108 Pascal = 240 MPa. For two 3mm screws, Stress = 107 MPa F = 3113 N No shear stress on bolts because there is an equal And opposite force on the other side of the plate. 2210 2210 From: http://www.dezurik.com/AppData_PDF/10_60_1.pdf “Therefore, when designing stainless steel parts, a value of 30,000 psi (207 mPa) is considered the limiting stress for determining safety factors.” MSE mirror repair 6jan03.ppt