Activités SPS pour BE/ICS Systèmes d’Alarmes YETS

Slides:



Advertisements
Similar presentations
HiRadMat : report from WG2&3 – WANF dismantling January 15, 2010S. Evrard 1 Worksite: activities achieved or in progress WANF cleaning: status Proposal.
Advertisements

LS1C 15 Mar 2013 AB Technical Coordination CMS Safety, LS1 Proposed Evacuation exercise in USC55/UXC55 Austin BALL – CMS Technical Coordination Safety.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
IEFC Workshop 2011 David Mcfarlane Superintendent for SPS EN/MEF/ABA 1.
May Exp-Area meeting1 Safety Systems Installation status Flammable Gas Detection System Fire Detection System in SG8 ODH Detection System CO2 Detection.
- Hearing Session - Marion Picard - July 28 th, 2011 S TATUS OF H I R AD M AT S AFETY F ILE Outline  Safety file Descriptive part Hazard inventory  Demonstrative.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Injector De-cabling Project Enlarged meeting # E. HARROUCH, EN-MEF, on behalf of the Injector De-cabling Project Team.
7/23/ J.Coupard. 1) Cryogenic risks 2) Cryogenic phases from RT/floating to nominal and additional safety rules A. Sectors warmed-up to RT or considered.
March 8, 2006Exp. Area Meeting - E. Thomas1 Oxygen Deficiency Hazards Detection System in UX85 Two risks – Two systems 1.Top : He leaks 2.Bottom : CF4.
LHC-YETS Coordination meeting #9 24 th November, 2015.
LS1preparation & planning status A L Perrot on the behalf of EN/MEF R2E project meeting 11 th May 2012 EN.
Injector De-cabling Project Project meeting # 7, S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
EHN1 – EN/EL Progress update J. Devine G. Gross 11/02/16.
EHN1 – EN/EL Planning Lighting _ Containment_ Cabling J. Devine G. Gross 11/02/16.
HiRadMat status report Adrian Fabich HiRadMat EAM, 4. March 2016 EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th.
Linac4-PSB 160 MeV connection readiness review Tuesday 30 August August 2016 Linac4-PSB 160 MeV connection readiness review 2.
SPS-FIRE The SPS Fire Safety Project Planning Status
NA CONSOLIDATION & SAFETY SYSTEMS
YETS & LS2 Works EN-EL / Power distribution
SPS Personnel Protection System Renovation Project
Linac4-PSB 160 MeV connection readiness review
Proposition de routing des cables :
LIU – EVM status and next steps
Safety in the Neutrino Platform Hall
Framework Schedule from EYETS 2016 to LS2
SPS Crab Cavity Test Stand: Safety review summary
SPS LS1 Planning meeting (N019) 04/09/13
SPS Winter stop Planning meeting (N06) 05/01/2011
YETS & LS2 Works EN-El on LHC / Power distribution
BE-ICS Activities during the LS2 Period (15 min)
EHN1 Extension planning
BA6 – crab cavity activities in EYETS
Injector De-cabling Project
LHC-EYETS 2016/17 Coordination meeting #18
Racks in BA6 SPS test stand Integration 5 October 2017.
EN-EL-FC Activity Jeremy Blanc, EN-EL-FC.
Budget specification EHN1 Extension: Infrastructure (WG2)
BE-ICS activities for LIU Project
De-cabling strategy during YETS
LHC-TS3 Coordination meeting #3
Crab Cavities Activities
EN-HE SPS works during EYETS
LHC Civil Engineering Activities for YETS – LS2
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS EN-CV Planning LS (initial draft)
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
HL Consolidation Day Analysis of needs from BE-ICS
EYETS 2016/2017 Activities SPS Access system Maintenance and Evolutions Access system EYETS 2016/2017 EDMS:
NA CONSOLIDATION & SAFETY SYSTEMS
SPS activities during LS2 TE-EPC (Power Converter Group)
Short LHC-TS week 38 Confirmed by LMC on 16th August
2016.
GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) Olivier Barrière.
EN-HE L2 – PS – PSB – TT2 works during YETS
YETS & LS2 Works EN-EL / Power distribution
TE-MSC activities in SPS during YETS
Status with crucial LSS5 kicker transmission line cables
BE-ICS work for SPS Safety Systems
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 20/02/2019.
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 06/03/2019.
EN-HE SPS during LS2 J-L GRENARD on behalf of EN-HE 23/1/2019.
North Area Safety Review 2019
North Area Safety Review 2019
SPS 2, 3, 4 and 6 during W D.MCFARLANE EN-ACE-OSS 26/06/2019.
East Hall under construction
SPS 2, 3, 4 and 6 during W D.MCFARLANE EN-ACE-OSS 12/06/2019.
WP1: Status and Plans Francisco Sanchez Galan (EN-EA-PE)
Presentation transcript:

Activités SPS pour BE/ICS Systèmes d’Alarmes YETS 2017-2018 Nicolas Broca / Pierre Durand on behalf of AS Team 11/10/2017 EDMS: 1851960 Nicolas Broca / Pierre Durand BE-ICS YETS 2017/2018 Coordination Meeting, 11th October 2017 BE/ICS/AS activities

Sommaire ODH DETECTION (Nicolas Broca) FIRE DETECTION (Pierre Durand) Work for SPS Crab Cavity Test Stand FIRE DETECTION (Pierre Durand) Fire Detection and Evacuation Maintenances Sprinkler Maintenances Nicolas Broca / Pierre Durand BE-ICS YETS 2017/2018 Coordination Meeting, 11th October 2017 BE/ICS/AS activities

ODH Detection for SPS Crab Cravity Test Stand Nicolas Broca / Pierre Durand BE-ICS YETS 2017/2018 Coordination Meeting, 11th October 2017 BE/ICS/AS activities

ODH Detection for SPS Crab Cavity Test Stand Conceptual Design (integration ongoing) Installation of 18 ODH detectors and 23 Flashing lights panels in: BA6 lift area, 2 detectors + 2 flashs/sirens TA6 tunnel and technical gallery, 7 detectors + 7 flashs TS6+ from DCUM 6405, 6 detectors + 10 flashs TS6- to DCUM 6000, 4 flashs Planning to Validate & Resources 17 days of work – 2 FTE contract FSU GS04 Step 1, VIC scheduled on December 21st Step 2, Installation of equipment's – 10 days EN/EL pull our cables in parallel Step 3, Cabling of equipment's – 5 days Step 4, Tests and commissioning – 2 days Step 5, HSE acceptance test – ½ day 2 control racks to setup BA6 lift area 2 ODH + 2 flashs/sirens TA6 7 ODH + 7 flashs TS6- 4 flashs TS6+ 6 ODH + 10 flashs Nicolas Broca / Pierre Durand BE-ICS YETS 2017/2018 Coordination Meeting, 11th October 2017 BE/ICS/AS activities

ODH Detection for SPS Crab Cavity Test Stand Planning Proposal (to validate with SPS coord, EN/EL and CC project) Installation of equipment's – from December 19th to January 15th Cabling of equipment's – from January 16th to January 22nd Depend on EN/EL campaign progress Tests and commissioning – from January 29th to January 30thnd HSE acceptance test – TBD Needs and Impacts EN/HE to help positioning racks in BA6 EN/EL to pull our cable asap Handling co-activity in CC area, shifted work Technical commissioning require to activate ODH flash Warning message in acces point sufficient or shifted work? HSE acceptance test require to activate evacuation siren No acces to PA6 for half day (4 to 6 hours) Nicolas Broca / Pierre Durand BE-ICS YETS 2017/2018 Coordination Meeting, 11th October 2017 BE/ICS/AS activities

Fire Detection Maintenances Nicolas Broca / Pierre Durand BE-ICS YETS 2017/2018 Coordination Meeting, 11th October 2017 BE/ICS/AS activities

(VIC à réaliser, prévoir une journée pour l’ensemble du SPS ) Maintenance Fire detection & Evacuation Title Location Duration Planning Impact Needs PLAN Détection Incendie et évacuation des systèmes existants Maintenance annuelle (exigence légale) BA1 - SFDIN-00258, SESEV-00020 BA2 - SFDIN-00254, SESEV-00021 BA3 - SFDIN-00262, SESEV-00022 BA4 - SFDIN-00256 et 286, SESEV-00023 et 108 BA5 - SFDIN-00259, SESEV-00024 BA6 - SFDIN-00260, SESEV-00_025 BA7 - SFDIN-00261, SESEV-00026 SPS souterrain et TT, partout 5 semaines 1 équipe E095 Début YETS Test de sirènes tôt le matin ou le soir – sans personne dans la zone concernée (VIC à réaliser, prévoir une journée pour l’ensemble du SPS ) BA6 - SFDIN-00260, SESEV-00025 SPS surface: BA’s, BBs, etc. Nicolas Broca / Pierre Durand BE-ICS YETS 2017/2018 Coordination Meeting, 11th October 2017 BE/ICS/AS activities

Maintenance SPRINKLER Title Location Duration Planning Impact Needs PLAN Systèmes Sprinklers existantes Maintenance bi-annuelle BA1 – SXSPR-00001 BA2 - SXSPR-00002 BA3 - SXSPR-00003 BA4 - SXSPR-00004 BA5 - SXSPR-00005 BA6 - SXSPR-00006 BA7 - SXSPR-00007 SPS BA’s et shafts 1/jour par BA Viansone Securiton YETS En dehors de la maint. détection incendie En dehors maint. eau incendie - CV Nicolas Broca / Pierre Durand BE-ICS YETS 2017/2018 Coordination Meeting, 11th October 2017 BE/ICS/AS activities