Integrated Water Project for the town of Sliven ISPA Measure 2005 BG 16 P PE 001 Integrated Water Project for the town of Sliven 1.Reconstruction of WWTP Sliven (FIDIC Yellow Book) 2.Construction/Reconstruction of Water Supply and Sewerage Network of Sliven (stage 1); LOT 1:Construction/Reconstruction of Sewerage Network
Works Contract 1 Reconstruction of WWTP Sliven (FIDIC Yellow Book) Commencement Date: March 24, 2009 Taking Over Certificate: July 21, 2011 DNP started on: July 21, 2011 Performance Certificate: October 18, 2012 Physical Execution: 100 % Financial Execution: 83 %
WWTP Sliven before reconstruction
Reconstruction of WWTP Sliven Inlet chamber Entrance and control building
Reconstruction of WWTP Sliven Screening building
Reconstruction of WWTP Sliven Grid tank Blowers
Reconstruction of WWTP Sliven
Reconstruction of WWTP Sliven Primary Settlement Tank PS for primary sludge - reconstruction
Reconstruction of WWTP Sliven Aeration Tank
Reconstruction of WWTP Sliven Distribution Chamber of SST Secondary Settlement Tank
Reconstruction of WWTP Sliven Service Building at Heated Digesters
Reconstruction of WWTP Sliven Facilities for Sludge treatment and utilization of biogas
Reconstruction of WWTP Sliven SCADA MCC
Reconstruction of WWTP Sliven Gasholder Torch
Reconstruction of WWTP Sliven Commemorative table
Supervision Contracts Reconstruction of WWTP Sliven Contract № 1 Commencement Date: March 23, 2009 Completion Date: April 23, 2012 Financial Execution: 100 % Contract № 2 – funded by national budget Completion Date: December, 2012
Construction/Reconstruction of Sewerage Network – LOT1 The final assessment for the result achieved in LOT 1 is about 23 % (excluding recovering of the roads). Sliven Municipality has submitted in MoEW documentation to apply for financing under the OP Environment. The new project includes the activities of LOT1 that were not completed by ISPA.
Compliance with Article 8 of the Financing Memorandum All conditions under Article 8 of the FM related to payments are considered fulfilled.
Final Report was presented to the European Commission ISPA Measure 2005 BG 16 P PE 001 Integrated Water Project for the town of Sliven Final Report was presented to the European Commission