Integrated Water Project for the town of Sliven

Slides:



Advertisements
Similar presentations
1 Cohesion Policy Evaluation Network Meeting: Brussels, October 2010 Ex post evaluation of cohesion policy interventions financed.
Advertisements

Peco Facet Sewage Water Treatment Plant
ISPA Measure 2000 BG 16 P PE 001 Integrated water project – City of Sofia Performance 100%
FY Budget Presentation to Board of Finance March 31, 2014 SWPCA William P. Brink, Executive Director Rhudean Bull, Administration Manager.
Upgrade of Sana'a WWTP1 Upgrade of the Sana‘a Wastewater Treatment Plant Presentation of the Design Implementation of the New Preliminary Wastewater.
12-May-151 Khan Younis Waste Water Treatment Plant Management Arrangements Khan Younis Waste Water Treatment Plant Management Arrangements.
Development of the Wastewater Collection and Treatment System in Szombathely County Town Implementation of sewage-sludge Composting Plant 2003/HU/16/P/PE/021.
Waste water treatment - conforming to EU Waste Water Directive study case of Tg. Mures Otto DARABAN General Director SC Compania Aquaserv SA.
PROJECT OVERVIEW FM Budget € Total contracted € –EU Grant € –National Co-financing –Total contracted /
European Commission, DG Environment Brussels, 05 April 2006 Screening of chapter 27 - Environment Dr. Violeta Vinceviciene European Commission DG Environment.
„Extension and modernization of water and wastewater infrastructure in Arad County”
WASTEWATER TREATMENT IN LAHTI There are 2 wastewater treatment plants in Lahti - Kariniemi - Ali-Juhakkala In these slides we examine waste water treatment.
This project is co-funded by the European Union, the Russian Federation and the Republic of Finland Activity 4. Utilities network analysis (KRIMEL, KAEEC,
WATER AND WASTEWATER Ltd. Rijeka REPUBLIC OF CROATIA Andrej Marochini, B.Sc.C.E.
STATUS OF CF CO-FUNDED PROJECTS 11 April 2008 AIVARS JURJĀNS Ministry of Environment Head of Projects Implementation Department.
Cohesion Fund Monitoring Committee CR 1164/94 ISPA Measure 2001 BG 16 P PE 004 FGD Plants at Units 5&6 of TPP Maritsa East 2.
04/12/04 Environmental Protection Agency/Lithuania OECD/Eurostat JQ Inland Waters Country presentation Lithuania Violeta Juozefaite.
Financial reporting Elise Oukka, Head of Finance, FMO Riga.
MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS MANAGING AUTHORITY FOR COHESION FUND (REG 1164/94) Tenth Cohesion Fund (Regulation 1164/94) Monitoring.
Project History Town of Newport Population: 550 Vermillion County Seat.
MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1.
Vienna, May 2014 National Agency for Energy Regulation of Moldova (ANRE)
A National Prioritized Project Pipeline and Environmental Operational Program Republic of Turkey Ministry of Environment and Forestry.
TOWN MEETING January 17 th AGENDA 2006 Budget Major Maintenance Funding Crisis Funding Solutions – Tract C Sale.
I N S T R U M E N T E S T R U C T U R A L E I N R O M A N I A Infrastructure Development in Romania Workshop.
Environmental Investment Centre (EIC) ISPA Unit Rävala pst 8, TALLINN Tel: Fax:
PRESENTATION TO PARLIAMENT 14 May Amounts allocated as per the DORA.
Balchik Integrated Water Project in Bulgaria ISPA Measure 2002 BG 17 P PE 017 WWTP BALCHIK.
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS MANAGING AUTHORITY FOR COHESION FUND (REGULATION 1164/94) MANAGEMENT OF PROJECTS, FINANCED BY COHESION.
CARBOOCEAN Annual meeting, December 2007 Finance and administration by Hege D. Høiland SIXTH FRAMEWORK PROGRAMME PRIORITY “Global Change.
Ogre county council (Latvia) Public services Conference in Novy Bydzov, 8-10th May 2008.
Progress with Priority Environmental Infrastructure Investment Projects in Croatia PEIP Regional Meeting - 26 th November 2007 Brussels MINISTRY OF ENVIRONMENTAL.
Inventory of the WWTPs in Slovakia 2. Workshop on Environment In Budapest Ivan Šucha (Statistical Office of the Slovak Republic) Daniela Ďurkovičová (Slovak.
7 th Cohesion Fund Monitoring Committee CR 1164/94 ISPA Measure 2001 BG 16 P PE 006 Wastewater Collection and treatment located in Pazardjik, Republic.
ISPA Measure 2002 BG 16 P PE 016 Varna Integrated Water Project Transformationof Transformation of WWTP Asparuhovo Reconstruction of WWTP Varna ReconstructionofWS&
ISPA Measure 2003 BG 16 P PE 019 Kardjali Regional Waste Management Centre in Bulgaria 10 th Cohesion Fund Monitoring Committee CR 1164/94.
11-14 April 2011 A P A V I T A L (Iai – Romania) general overview U.S. Civil Water and Wastewater Industry Program in Romania & Moldova - BUCHAREST.
Study of the U.S. Institute for the Environment Introduction to Water and Wastewater and Treatment Tuesday July 14, 2009.
9 th Cohesion Fund Monitoring Committee CR 1164/94 ISPA Measure 2002 BG 16 P PE 018 Shoumen Water Cycle Improvements.
CALENDAR 2015: “THIS PROJECT HAS BEEN FUNDED WITH SUPPORT FROM THE EUROPEAN COMMISSION. THIS PUBLICATION [COMMUNICATION] REFLECTS THE VIEWS ONLY OF THE.
CAST: Financial and administrative issues Project funded by the European Commission, Directorate-General Energy & Transport, under the 6th RTD Framework.
Waste Water Treatment Denis MOTA. Overview Waste water Treatment Treatment in LYON  Pierre Bénite.
Ing. Alena Bujnová, Head of Water Policy Department Ministry of Environment of the Slovak Republic.
WASTEWATER TREATMENT PETRIT TARE GENERAL DIRECTOR OF UKKO JSC CONFORMING TO EU WASTEWATER TREATMENT DIRECTIVE CASE STUDY OF KORCA CITY, ALBANIA.
TAIEX – REGIO Multi Country Workshop on management practices for environmental investments 8-9 December 2015, Vilnius Presentation by BULGARIA Ministry.
Hurricane Ike Recovery CITY OF GALVESTON March 26, 2015.
NYP/Q PPS PAC Meeting NYP/Q PPS September 22, 2015.
RHP 12 Regional Update Jeff Dane Executive Vice President & Chief Financial Officer.
MAY 10 th, 2010 Visit of Commissioner for Regional Policy – Johannes Hahn in the town of Rousse.
WASTEWATER TREATMENT IN BULGARIA STATUS AND CHALANGES ORLIN DIKOV – INFRASTRUCTURE CONSULTANT.
A research project supported by the European Commission
Works Contract Commencement Date: 20th May 2005
Structural Funds Financial Management and Control, Romania
NATIONAL PROCUREMENT IN LATVIA
Pinole-Hercules Water Pollution Control Plant Upgrade Project
ISPA Measure 2002 BG 16 P PE 015 WWTP Popovo and main collectors
ISPA Measure 2002 BG 16 P PE 014 WWTP SEVLIEVO
MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS
ISPA Measure 2002 BG 16 P PE 009 WWTP Bourgas – Meden Rudnik
ISPA Measure 2002 BG 16 P PE 010 Targovishte Wastewater Collection and Treatment, Republic of Bulgaria.
Bulgaria – Country Report
ISPA Measure 2002 BG 16 P PE 011 WWTP LOVECH
Multi-country Workshop Implementation of SME Initiative
STATUS OF CF CO-FUNDED PROJECTS
February 2007 Note: Source:.
City of Janesville Wastewater Facility Plan Amendment Public Hearing
Shoumen Water Cycle Improvements
WP 1 Management and Coordination
The meeting of INTOSAI Working GROUP on Public Procurement Audit July 4-5 Lisbon Abstract of State Audit Bureau of Kuwait in conducting the public procurement.
The Project Overview and Status Report
Presentation transcript:

Integrated Water Project for the town of Sliven ISPA Measure 2005 BG 16 P PE 001 Integrated Water Project for the town of Sliven 1.Reconstruction of WWTP Sliven (FIDIC Yellow Book) 2.Construction/Reconstruction of Water Supply and Sewerage Network of Sliven (stage 1); LOT 1:Construction/Reconstruction of Sewerage Network

Works Contract 1 Reconstruction of WWTP Sliven (FIDIC Yellow Book) Commencement Date: March 24, 2009 Taking Over Certificate: July 21, 2011 DNP started on: July 21, 2011 Performance Certificate: October 18, 2012 Physical Execution: 100 % Financial Execution: 83 %

WWTP Sliven before reconstruction

Reconstruction of WWTP Sliven Inlet chamber Entrance and control building

Reconstruction of WWTP Sliven Screening building

Reconstruction of WWTP Sliven Grid tank Blowers

Reconstruction of WWTP Sliven

Reconstruction of WWTP Sliven Primary Settlement Tank PS for primary sludge - reconstruction

Reconstruction of WWTP Sliven Aeration Tank

Reconstruction of WWTP Sliven Distribution Chamber of SST Secondary Settlement Tank

Reconstruction of WWTP Sliven Service Building at Heated Digesters

Reconstruction of WWTP Sliven Facilities for Sludge treatment and utilization of biogas

Reconstruction of WWTP Sliven SCADA MCC

Reconstruction of WWTP Sliven Gasholder Torch

Reconstruction of WWTP Sliven Commemorative table

Supervision Contracts Reconstruction of WWTP Sliven Contract № 1 Commencement Date: March 23, 2009 Completion Date: April 23, 2012 Financial Execution: 100 % Contract № 2 – funded by national budget Completion Date: December, 2012

Construction/Reconstruction of Sewerage Network – LOT1 The final assessment for the result achieved in LOT 1 is about 23 % (excluding recovering of the roads). Sliven Municipality has submitted in MoEW documentation to apply for financing under the OP Environment. The new project includes the activities of LOT1 that were not completed by ISPA.

Compliance with Article 8 of the Financing Memorandum All conditions under Article 8 of the FM related to payments are considered fulfilled.

Final Report was presented to the European Commission ISPA Measure 2005 BG 16 P PE 001 Integrated Water Project for the town of Sliven Final Report was presented to the European Commission