2018/6/11 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP 2010.6.21--2010.7.16fdsagsdfgsdgsdgasdfsadf 1.

Slides:



Advertisements
Similar presentations
Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.
Advertisements

A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Jeffrey T. Williams Manager, RNAV & RNP Group Air Traffic Organization
2017/3/28 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
Javier Perez Diestro Air Navigation International Director
Overview of the PBN Airspace Implementation Processes
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
P. GAYRAUD /B. RABILLER Cologne the 21st of June 2007
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
31st Transportation Working Group Meeting Lima, Peru August 2008 CAAC 1 New techniques and procedures CAAC’s Progress on PBN.
SC227 – SC214 ISRA – Datalink Interface. PBN Manual, Part A, Chapter On-board performance monitoring and alerting On-board performance.
Continuous Climb Operations (CCO) Saulo Da Silva
PBN Plan Development Aviation Industry Forum 18 November 2009.
“Established on RNP” Jeff Williams – IATA
Mr. Hooper Harris FAA/JAA Annual Meeting Phoenix, AZ June 3 - 7, 2002
APAC PBN Seminar F.LECAT (ICAO)
PBN Airspace Concept Process
Regulatory Plan to support the future ATM system in Australia UPDATE ON CASA RULEMAKING IN THE YEAR SINCE SITF/10.
APAC PBN Seminar, Bangkok, 8-10 June 2015 The Business Aviation Perspective presented by Captain Gabriel Thomas Boyda / MJETS* representing the International.
Presented to: By: Date: Federal Aviation Administration Gulf of Mexico 50 NM Lateral Separation – RNAV Routes Project Project Overview ATO Oceanic & Offshore.
PBN “SETTING UP A NEW BUT SUCCESSFUL, PBN PROGRAMME”
ATM Implementation Support by ICAO APAC RSO
Performance Based Navigation Industry Forum Issues Workshop Presentation to Industry Forum 18 November 2009.
Introduction to PBN Seminar ICAO PBN Implementation 1.
PBN Deployment – New Zealand Domestic Airspace CAA PBN Forum November Auckland.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
Information requested following SMS implementation presentation.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-10/PIA 3 Improved Operations through Enhanced En-Route Trajectories.
EUROCONTROL European Organisation for the Safety of Air Navigation.
1 Vince Galotti Chief/ATMICAO 26 March 2007 A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART I FITTING THE PIECES TOGETHER.
1 PBN Performance Based Navigation - Concept & Change - Presented by: Lex Hendriks, EUROCONTROL ICAO Performance Symposium March 2007 Federal Aviation.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March RNA and RNAV and RNP Strategy in Japan Yoshiki Imawaka Director.
Basics of RNP. Outline  What is RNP?  Why implement RNP?  What does it mean for communities?
APAC PBN Seminar F.LECAT (ICAO)
Overview of the PBN Airspace Implementation Processes
Workshop on preparations for ANConf/12 − ASBU methodology
ATM Implementation Support by ICAO APAC RSO
UPDATE ON CASA RULEMAKING IN THE YEAR SINCE SITF/10
Flight Validation Process of RNP APCH Procedures: Thailand Case Study
PlaneWrong AGM Thursday 13th October
PBN OVERSIGHT IN AUSTRALIA
Overview of Continental En-route Navigation Specifications
Erwin Lassooij PBN Programme Manager 30 January 2014
Airline PBN Operations & Desired Entry Competency
The Norwegian PBN Implementation Plan Arne Lindberg Inspector ANS
Introduction of TBO within OptiFrame
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
PBN Performance Based Navigation
Continuous Climb Operations (CCO) Saulo Da Silva
Performance Based Navigation: Navigation Specifications
Regional RAIM Prediction System – Progress Report
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART I
Workshop on preparations for ANConf/12 − ASBU methodology
PBN Airspace Concept Workshop
Mr. Kevin Lam Director of Airport Infrastructure & Air Navigation
Basics of RNP.
Continuous Climb Operations (CCO) Saulo Da Silva
ASEAN PBN Routes Objectives:
GAUTENG AIRSPACE PBN PLAN
Oceanic and International Operations
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
RNAV and RNP Strategy in Japan
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
“Established on RNP” Jeff Williams – IATA
PBN ICAO HQ Activities Overview
RNAV – process in Tartu How EAVA can co-operate with service providers ONE example - still in progress,,
Presentation transcript:

2018/6/11 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP 2010.6.21--2010.7.16fdsagsdfgsdgsdgasdfsadf 1

Latest Hong Kong PBN Implementation Roadmap 2018/6/11 Content Latest Hong Kong PBN Implementation Roadmap Publication of mandate requirements for Baisc-RNP1 and RNP4 New PBN procedures Implementation New RNP AR APCH Progress Difficulties ICAO FPP 2010.6.21--2010.7.16fdsagsdfgsdgsdgasdfsadf 2

Hong Kong PBN Implementation Plan ~ Approach AIRSPACE SHORT TERM (2008-2012) MEDIUM TERM (2013-2016) Long Term (Beyond 2016) Approach Implement RNP AR APCH Procedure to North RWY by 2010 [Implemented] Implement RNP AR APCH Procedure to South RWY by 2012 (in progress) Feasibility study of GBAS (in progress) Trial of GBAS for capable aircraft/ operators Consider use of appropriate Nav. Spec., e.g. Advance RNP APCH, within approach airspace Subject to satisfactory results of the trial, consider GBAS as backup to the ILS Consider use of other Nav. Spec. that suits the operation in HK. Consider mandate the Nav. Spec. selected for aircraft operating within approach airspace by 2016+ Achieve 100% implementation of the Nav. Spec. selected within approach airspace 3 ICAO FPP 2010.6.21--2010.7.16fdsagsdfgsdgsdgasdfsadf

Hong Kong PBN Implementation Plan ~ Terminal AIRSPACE SHORT TERM (2008-2012) MEDIUM TERM (2013-2016) Long Term (Beyond 2016) Terminal (SID/STAR) issue mandate for Basic-RNP1 SIDs/ STARs capability by 2013 [issued] Implement Basic RNP1 application Mandate Baisc RNP1 application for aircraft operating by 2013 Achieve 100% Basic RNP1 SID/STAR AIC 03/12 12 Jan 2012 4 ICAO FPP 2010.6.21--2010.7.16fdsagsdfgsdgsdgasdfsadf

Hong Kong PBN Implementation Plan ~ Enroute AIRSPACE SHORT TERM (2008-2012) MEDIUM TERM (2013-2016) Long Term (Beyond 2016) Enroute Apply 50NM Longitudinal Separation on RNP10 Routes in 2008 [Implemented] Trial operation for RNP4 on L642 & M771 by 2012 (pending) issue mandate for RNP4 capability within HK en-route airspace by 2014 [issued] Implement RNP4 within enroute airspace Mandate RNP4 application for aircraft operating within en-route airspace by 2014 Achieve 100% RNP4 within en-route airspace Consider mandate better navigation specification in accordance with the ICAO regional roadmap, e.g. RNP2 AIC 03/12 12 Jan 2012 5 ICAO FPP 2010.6.21--2010.7.16fdsagsdfgsdgsdgasdfsadf

Implementation of new RNP AR APCH Background Current RNP AR APCH RWY25R Why new? Procedure Details Difficulties encountered Q&A 6 ICAO FPP 2010.6.21--2010.7.16fdsagsdfgsdgsdgasdfsadf

Background: Current RNP AR APCH RWY25R (implemented in 2010) Same Approach track as ILS APCH Same Profile as ILS APCH 15NM long final Improved MAP track (vs ILS) for better ATM 7 ICAO FPP 2010.6.21--2010.7.16fdsagsdfgsdgsdgasdfsadf

Why we need another new RNP AR APCH? Reduce Noise level over highly populated area Shorter track mile for flights from W and SW Avoid Weather near Hong Kong highest mountain (Tai Mo Shan) an alternate route when weather blocking traffic from joining current ILS/RNP APCH ICAO FPP 2010.6.21--2010.7.16fdsagsdfgsdgsdgasdfsadf

RNP AR APCH Implementation Process in Hong Kong Brief Hong Kong Implementation process for RNP AR APCH Stakeholders consultation (Operators, ATC etc) Primary Flight Procedure Design with Preliminary assessment Primary ATC procedure study Stakeholders consultation Revised Design with Detail Flight Procedure assessment Stakeholders Review (Operators, ATC, Regulator etc) Flight Simulation (Ground validation) Further revision Detail ATC procedure development Stakeholders Review Safety assessment Revised Flight and ATC procedure accommodating safety assessment outcome Publication Trial Operation with appropriate benchmarking (flight efficiency – environmental, track mile ; workload – both pilots and controllers) for 0.5 to 1 yr Implementation Obtain Feedback from stakeholders, continuous maintenance Periodic Review 9 ICAO FPP 2010.6.21--2010.7.16fdsagsdfgsdgsdgasdfsadf

Difficulties Encountered: ATM Procedure Naming – DataBase issue PBN TF 6 (Feb 2012) – WP12 ICAO recommendation ICAO Doc 8168 Vol. II, Part I Section 4, Chapter 9 9.5.3 “Duplicate Procedure identification e.g. RNAV(RNP) z Rwy25R RNAV(RNP) y Rwy25R Most FMS accept 6 character e.g.RNV25R 7 character is required e.g. RNVy25R B777 & B748 Limited amount of aircraft can fly the procedure only less flight can enjoy the benefits of shorter track miles and enhanced operating efficiency of the new procedures 10 ICAO FPP 2010.6.21--2010.7.16fdsagsdfgsdgsdgasdfsadf

The meeting is requested to note that: Hong Kong has completed most of the short term PBN implementation projects and is expecting to accomplish all other short term PBN projects in 2012; Hong Kong has published the mandate requirements for Basic-RNP 1 and RNP 4 (details please refer to Hong Kong AIC 03/12); and The limitation of FMS, i.e. cannot accept RNP procedure identifications with more than 6 alpha-numeric places even the procedure is named in accordance with the ICAO procedure naming convention as stipulated in Doc 8168, will hinder the implementation of PBN procedures. ICAO may need to consider providing more guidance to assist States and operators in resolving the FMS limitation.

Q&A ICAO FPP 2010.6.21--2010.7.16fdsagsdfgsdgsdgasdfsadf