Assignment 5: Part (A) The Dine Corporation is both a producer and a user of brass couplings. The firm operates 220 days a year and uses the couplings.

Slides:



Advertisements
Similar presentations
Re-Order Point Problems Set 1: General
Advertisements

EOQ for Production not Order (EPQ) We do not buy the product. We produce it. Total demand / year is D Demand / day or consumption rate is u Production.
Inventory Management for Independent Demand Chapter 12, Part 2.
Inventory Control Chapter 17 2.
12 Inventory Management.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 12 Inventory Management.
12 Inventory Management.
Chapter 12 Inventory Management
Operations Management
Inventory Management A Presentation by R.K.Agarwal, Manager (Finance), PFC.
Chapter 9 Inventory Management.
C 11 Inventory Management
Assignment Ch12(c) The Dine Corporation is both a producer and a user of brass couplings. The firm operates 220 days a year and uses the couplings at a.
Operations Management
Operations Management Inventory Management Chapter 12 - Part 2
Class 22: Chapter 14: Inventory Planning Independent Demand Case Agenda for Class 22 –Hand Out and explain Diary 2 Packet –Discuss revised course schedule.
11 Inventory Management CHAPTER
(a) : If average demand per day is 20 units and lead time is 10 days. Assuming zero safety stock. ss=0, compute ROP? (b): If average demand per day is.
Customer Demand Customer demand varies in both timing and quantity:
Inventory Management for Independent Demand
Chapter 12: Inventory Control Models
EOQ: How much to order; ROP: When to order Re-Order Point (ROP) in periodic inventory system is the start of the period. Where is ROP in a perpetual system?
Inventory Management McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
MNG221- Management Science –
Managing Flow Variability: Safety Inventory
13 Inventory Management.
A) If average demand per day is 20 units and lead time is 10 days. Assuming zero safety stock. ss=0, compute ROP. b) If average demand per day is 20 units.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 12 Inventory Management.
Inventory- a stock or store of goods
Inventory Management.
13-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
CHAPTER Inventory Management McGraw-Hill/Irwin Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill.
1 Slides used in class may be different from slides in student pack Chapter 17 Inventory Control  Inventory System Defined  Inventory Costs  Independent.
Copyright 2011 John Wiley & Sons, Inc. Chapter 9 Inventory Management 9-1.
When to re-order with EOQ Ordering
Economic Order Quantity The economic order quantity (EOQ) is the fixed order quantity (Q) that minimizes the total annual costs of placing orders and holding.
Inventory Management MD707 Operations Management Professor Joy Field.
Independent Demand Inventory Planning CHAPTER FOURTEEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Inventory Management. Learning Objectives  Define the term inventory and list the major reasons for holding inventories; and list the main requirements.
Inventory Control Model
Budi Harsanto Dept. of Management & Business, Faculty of Economics, Universitas Padjadjaran Inventory Management.
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 19 1.
Chapter 12 : Inventory Management Outline  The Importance of Inventory  Functions of Inventory  Types of Inventory.
1 Managing Flow Variability: Safety Inventory Forecasts Depend on: (a) Historical Data and (b) Market Intelligence. Demand Forecasts and Forecast Errors.
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 18 1.
Inventory Management for Independent Demand Chapter 12.
What types of inventories business carry, and why they carry them.
Time Inventory Demand During Lead Time. LT ROP when demand during lead time is fixed.
Inventory Control. Meaning Of Inventory Control Inventory control is a system devise and adopted for controlling investment in inventory. It involve inventory.
11-1Inventory Management William J. Stevenson Production planning and control Chapter 2: Inventory management 9 th edition.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 12 Inventory Management.
PENGENDALIAN PERSEDIAAN (Bagian 2)
Production planning and control
Example ( In terms of Percentage)
Inventory Models (II) under SC environment
EOQ Model 2/26/2016.
Inventory Control Models
Stevenson 13 Inventory Management.
NATCOR Stochastic Modelling Course Inventory Control – Part 2
NATCOR Stochastic Modelling Course Inventory Control – Part 1
EOQ for Production not Order (EPQ)
إدارة المخزون Inventory Management
Managing Uncertainty in the Supply Chain: Safety Inventory
Random Demand: Fixed Order Quantity
Inventory Control: Part 3 –Independent Demand Inventories
a1) On average, how long a diskette spend in stock?
Managing Flow Variability: Safety Inventory
Managing Flow Variability: Safety Inventory
Slides by John Loucks St. Edward’s University.
EOQ Inventory Management
Presentation transcript:

Assignment 5: Part (A) The Dine Corporation is both a producer and a user of brass couplings. The firm operates 220 days a year and uses the couplings at a steady rate of 50 per day. u = 50. Coupling can be produced at rate of 200 per day. p=200. Annual storage cost is $1 per coupling, H=1, and machine setup cost is $35 per run, S=35. Since there are 220 days per year and u is equal to 50, therefore yearly demand is 50(220), D= 11000 Determine the economic run size. Approximately how many runs per year will there be? Compute the maximum inventory level. Determine the cycle time, run time and pure consumption time. Compute the total cost

Production, Consumption, Inventory

EPQ: One period and One year p-u u One Period One Year

Imax, Ordering Cost and Carrying Cost

EPQ : Optimal Q

The Problem The Dine Corporation is both a producer and a user of brass couplings. The firm operates 220 days a year and uses the couplings at a steady rate of 50 per day. u = 50. Coupling can be produced at rate of 200 per day. p=200. Annual storage cost is $1 per coupling, H=1, and machine setup cost is $35 per run, S=35. Since there are 220 days per year and u is equal to 50, therefore yearly demand is 50(220), D= 11000 Determine the economic run size. Approximately how many runs per year will there be? Compute the maximum inventory level. Determine the cycle time, run time and pure consumption time. Compute the total cost

EPQ and # of Runs u =50, p=200, H=1, S=35, D= 11000 Determine the economic run size. Approximately how many runs per year will there be? D/Q = 11000/1013 = 10.85

Run Time How much do we produce each time? Q How long does it take to produce Q? d1 What is our production rate per day? p Run Time? Q = pd1  1013 = 200d1 d1= 1013/200 = 5.0 p-u u I max d1 d2

Maximum Inventory Maximum Inventory ? At what rate inventory is accumulated? p-u For how long? d1 What is the maximum inventory? IMax IMax = (p-u)d1 IMax = (200-50)(5.06) = 759 p-u u I max d1 d2

IMax Pure Consumption Time What is the Maximum inventory? How long does it take to consume IMax ? d2 At which rate Imax is consumed for d2 days u Imax = ud2 759 = 50d2 d2 = 15.18 p-u u I max d1 d2

Cycle Time, Total Cost Cycle Time ? d1 + d2 = 5.06 + 15.18 = 20.24 TC = H(IMax/2) + S(D/Q) TC = 1(759/2) + 35 (11000/1013) TC = 379.5 + 379.5 = 759

Assignment4: Part (B) (a) : If average demand per day is 20 units and lead time is 10 days. Assuming zero safety stock. ss=0, compute ROP? (b): If average demand per day is 20 units and lead time is 10 days. Assuming 70 units of safety stock. SS=70, compute ROP? (c) : If average demand during the lead time is 200 and standard deviation of demand during lead time is 25. Compute ROP at 90% service level. Compute ss (d) : If average demand per day is 20 units and standard deviation of demand is 5 per day, and lead time is 16 days. (e) : If demand per day is 20 units and lead time is 16 days and standard deviation of lead time is 4 days.

Demand Forecast, and Lead Times Re-Order Point (ROP) in periodic inventory control is the beginning of each period. (ROP) in perpetual inventory control is the inventory level equal to the demand during the lead time plus a safety stock to cover demand variability. Lead Time is the time interval from placing an order until receiving the order. If there were no variations in demand, and demand was really constant; the ss is zero and ROP is when inventory on hand is equal to the average demand during lead time.

ROP; Fixed d, Fixed LT, Zero SS (a) : If average demand per day is 20 units and lead time is 10 days. Assuming zero safety stock. ss = 0 What is ROP? ROP = demand during lead time + ss ROP = demand during lead time Demand during lead time = (lead time) × (demand per unit of time) Demand during lead time = 20 × 10 = 200

ROP; Fixed d, Fixed LT, Positive SS Problem 4(b): If average demand per day is 20 units and lead time is 10 days. Assuming 70 units of safety stock. ss = 70 What is ROP ROP = demand during lead time + ss Demand during lead time = 200 ss = 70 ROP = 200+70 = 270

Safety Stock and ROP Service level Risk of a stockout Probability of no stockout ROP Quantity Average demand Safety stock z-scale z Each Normal variable x is associated with a standard Normal Variable z x is Normal (Average x , Standard Deviation x)  z is Normal (0,1) There is a table for z which tells us Given any probability of not exceeding z. What is the value of z Given any value for z. What is the probability of not exceeding z

Common z Values Risk Service level z value .1 .9 1.28 .05 .95 1.65 ROP Risk of a stockout Service level Probability of no stockout Safety stock z Quantity z-scale Average demand Risk Service level z value .1 .9 1.28 .05 .95 1.65 .01 .99 2.33

Relationship between z and Normal Variable x ROP Risk of a stockout Service level Probability of no stockout Safety stock z Quantity z-scale Average demand z = (x-Average x)/(Standard Deviation of x) x = Average x +z (Standard Deviation of x) μ = Average x σ = Standard Deviation of x Risk Service z value level .1 .9 1.28 .05 .95 1.65 .01 .99 2.33  x = μ +z σ

Relationship between z and Normal Variable ROP Risk of a stockout Service level Probability of no stockout Safety stock z Quantity z-scale Average demand LTD = Lead Time Demand ROP = Average LTD +z (Standard Deviation of LTD) ROP = Average LTD +ss ss = z (Standard Deviation of LTD)

Safety Stock and ROP Risk Service level z value .1 .9 1.28 Risk of a stockout Service level Probability of no stockout Safety stock z Quantity z-scale Risk Service level z value .1 .9 1.28 .05 .95 1.65 .01 .99 2.33 Average demand ss = z × (standard deviation of demand during lead time)

ROP; total demand during lead time is variable (c) : If average demand during the lead time is 200 and standard deviation of demand during lead time is 25. Compute ROP at 90% service level. Compute SS ROP Risk of a stockout Service level Probability of no stockout Expected demand Safety stock x

ROP; total demand during lead time is variable Service level Risk of a stockout Probability of no stockout z Risk Service level z value .1 .9 1.28 .05 .95 1.65 .01 .99 2.33

ROP; total demand during lead time is variable z = 1.28 z = (X- μ )/σ X= μ +z σ μ = 200 σ = 25 X= 200+ 1.28 × 25 X= 200 + 32 ROP = 232 SS = 32

ROP; Variable d, Fixed LT (d) : If average demand per day is 20 units and standard deviation of demand is 5 per day, and lead time is 16 days. Compute ROP at 90% service level. Compute SS

ROP; Variable d, Fixed LT Previous Problem If average demand during the lead time is 200 and standard deviation of demand during lead time is 25. Compute ROP at 90% service level. Compute SS This Problem If average demand per day is 20 units and standard deviation of demand is 5 per day, and lead time is 16 days. Compute ROP at 90% service level. Compute SS If we can transform this problem into the previous problem, then we are done, because we already know how to solve the previous problem.

ROP; Variable d, Fixed LT If average demand per day is 20 units and standard deviation of demand is 5 per day, and lead time is 16 days. Compute ROP at 90% service level. Compute SS What is the average demand during the lead time What is standard deviation of demand during lead time

Demand During Lead Time If demand is variable and Lead time is fixed

ROP; Variable d, Fixed LT

Now it is transformed into our previous problem where total demand during lead time is variable The average demand during the lead time is 320 and the standard deviation of demand during the lead time is 20. Compute ROP at 90% service level. Compute SS Service level Risk of a stockout Probability of no stockout ROP Expected demand Safety stock x

ROP; Variable d, Fixed LT z = 1.28 z = (X- μ )/σ X= μ +z σ μ = 320 σ = 20 X= 320+ 1.28 × 20 X= 320 + 25.6 X= 320 + 26 ROP = 346 SS = 26

Demand Fixed, Lead Time variable If lead time is variable and demand is fixed

Lead Time Variable, Demand fixed e) Demand of sand is fixed and is 50 tons per week. The average lead time is 2 weeks. Standard deviation of lead time is .5 week. Assuming that the management is willing to accept a risk no more that 10%. Compute ROP and SS. Acceptable risk; 10%  z = 1.28