Drawings Introduction to FIDIC - Drawings -.

Slides:



Advertisements
Similar presentations
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Advertisements

Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
Completion Outstanding work and Remedying Defects In order that the Works and Contractor's Documents, and each Section, shall be in the condition required.
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT 20. Claim, Disputes and Arbitration [Construction Contract Administration]
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT Defects Liability [Construction Contract Administration] Chapter 11.
1 Software Requirements Specification Lecture 14.
LOGO October The Employer FIDIC 1999 dasdas Supervisor: Dr.Kamalain shaath Done by: Mahmoud Abu Kmail Construction Contract Administration ENGC.
Architectural Drawings
Valuations and interim certificates. Purpose Value the works taking account of: – the physical work done on site; – any extra work ordered by the client;
About ACE Purpose of ACE ACE exists to represent its members’ interests to clients, both government and private sector, and stakeholder organisations,
Managing Software Quality
Audit objectives, Planning The Audit
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
LECTURE 4 FORMULATION & PRESENTATION OF MONETARY CLAIMS  Recovery of Loss / Expenses / Damages  Notice of intention to claim  Particular and further.
Drawings ACT Objective Realize the organization and intent of construction drawings 2.
7 Plant, Materials and Workmanship. 7.1Manner of Execution The Contractor shall carry out the manufacture of Plant, the production and manufacture of.
1 中央大學營管所學分班 工程契約與文件管理 CHAPTER 16 TEST AFTER COMPLETION Silver Book, 2002 Clause 12. 授課教授 : 謝定亞 博士 學員 : 陳忠正 ( 研發中心管線組 )
Conditions Of Contract For Construction Conditions Of Contract For Construction Presented BY : Arch. INA’AM J. El TAWIL FIDIC 1999Conditions of Contract.
DRAFTING REVIEW ELEMENTS OF A DRAWING TYPES OF VIEWS PART DRAWINGS
Software Requirements Specification Document (SRS)
ENGINEER Engineer Duties: Carry out the duties assigned in the contract.Carry out the duties assigned in the contract. Engineer's staff shall include qualified.
By Khalil T. Hasan Construction Solutions ( Joint Operation/Administration of multiple FIDIC Forms – A Case Study.
DOCUMENTATION ISO/IEC 17025:2005 Documentation.
 Problem Analysis  Coding  Debugging  Testing.
CHANGE ORDER/CLAIMS MANAGEMENT MODULE 9. Change Order Management.
FIDIC Tendering Procedures
DEALING WITH VARIATIONS E.M.M.B. EKANAYAKE BSc(Hons)QS, MRICS, MCIArb, MAACEI (Chartered Quantity Surveyor & Claims/Contracts Specialist) by Under FIDIC.
Amendments to the Public Works Contracts
Fits and Tolerances: Linear and Geometry.
Treatment of Key Risks under EPC Contracts
Chapter 1 The Systems Development Environment
QUANTITY AND COST ESTIMATION OF RESIDENTIAL BUILDING
Chapter 1 The Systems Development Environment
Introduction to FIDIC - Manuals
Technical Specifications & Employer's Requirements
Definition CASE tools are software systems that are intended to provide automated support for routine activities in the software process such as editing.
Administration of a FIDIC Contract - Project Control
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Bills of Quantities Introduction to FIDIC - Bills of Quantities -
Particular Conditions of Contract & Appendix to Tender
Section 4 Advanced Applications
Administration of a FIDIC Contract - Financial Management
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
INTERCONNECTION GUIDELINES
Chapter 1 The Systems Development Environment
System Design.
Chapter 1 The Systems Development Environment
Introduction to New Product Development (Documentation)
Particular Conditions of Contract & Appendix to Tender
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Caltrans 2010 standard specifications
Standard Practice for Dimensioning Drawings
Introduction to Systems Analysis and Design
From AS :   Part 4— Commissioning, operation and asset management
GDPR – Practical Implementation Managing contracts, procurement and relationships with suppliers Terry Brewer Chief Executive.
Thursday’s Lecture Chemistry Building Musspratt Lecture Theatre,
General Data Protection Regulation
بسم الله الرحمن الرحيم Tests on Completion Dr. Kamaleen Sha’ath
THE EMPLOYER Right, of access to the site.
Dennis Li - HKCIC Lecturer
Writing reports Wrea Mohammed
HSSE Bridging Overview
Dr. Jiacun Wang Department of Software Engineering Monmouth University
Construction Contract Administration
About ACE Purpose of ACE Values
Chapter 1 The Systems Development Environment
<Your Team # > Your Team Name Here
Analyzing and Organizing Information
Architecture & Interiors Design Process
Presentation transcript:

Drawings Introduction to FIDIC - Drawings -

Definitions FIDIC Red Book defines the Drawings as: 1.1.1.6 – “Drawings” means the drawings of the Works, as included in the Contract, and any additional and modified drawings issued by (or on behalf of) the Employer in accordance with the Contract Under FIDIC Conditions of Contract, Drawings are well down the order of precedence of the various documents constituting the Contract. The Drawings are the lifeblood of the key data, describing: A ‘Picture’ of the Works The Scope of the Works Inter-relationship of the various sections of work forming the whole Dimensional requirements and fit

Drawings The Tenderers will rely at a great extent on the Drawings for their understanding of the Project and their strategy to price and programme the Works A Drawing Manual is essential to govern consistent production and standards Each Implementing Agency will have its own standard as will specialist Consultants Care is needed to ensure a mutual standard between various organisations Major schemes may require both unique design drawings and standard (typical) detail drawings Presentation and detail accuracy Made easier through Computer Aided Drafting (CAD)

Key Factors for Drawings Production Design information for the sole purpose of the intended use of the drawing, do not use the same drawing for different purposes Maximise efficiency through a policy of minimum detailing without compromising quality and integrity Drawings must be clear, accurate and concise and contain no ambiguities The numbers of drawings must be kept to a logical minimum, and avoid duplication Group common elements on detail sheets with extensive use of cross referencing

Key Factors for Drawings Production Drawings should have limited and efficient data, notes should only be for clarification and not repeat data All units shown on drawings shall follow the “Système Internationale“ (SI) convention and all linear dimensions shall be in millimetres (mm). A North Point to be correctly orientated Alignment drawings. Graphic scale bars must be provided on all scale drawings

Classifications for Drawings Assembly/ Component/ Parts Drawings Schedules/ Tables Typical Details Standard Drawings Reinforce Concrete Detail Drawings Method Statement Drawings Sketches Cover Drawings General Arrangements Plans and Profiles Diagrams and Schematics Directive Drawings Detail Drawings

“Design Freeze” Phase During project preparation, there are studied different alternative that are may generate other ones At a certain moment the need of the project to advance to a next stage will require these studies to be stopped and carry on with a preferred one – “design freeze” Revisions made after ‘design freeze’ may lead to expensive variations. Variations will be used only when really necessary for the successful completion of the project

Drawings - FIDIC Clauses Clause 1.8 – Care and Supply of Documents: “The Specification and Drawings shall be in the custody and care of the Employer”. Clause 1.9 – Delayed Drawings or Instructions: “The Contractor shall give notice to the Engineer whenever the Works are likely to be delayed or disrupted if any necessary drawing or instruction is not issued to the Contractor within a particular time, which shall be reasonable. The notice shall include details of the necessary drawings or instruction, details of why and by when it should be issued, and details of the nature and amount of the delay or disruption likely to be suffered if it is late. If the Contractor suffers delay and/or incurs Cost as a failure of the Engineer to issued the notified drawing or within a time which is reasonable and is specified in the notice with supporting details, the Contractor shall give a further notice to the Engineer and shall be entitled subject Sub – Clause 20.1 [Contractor’s Claims] to: an extension of time for any such delay, if completion is or will be delayed, under Sub – Clause 8.4 [Extension of Time for Completion], and payment of any such Cost plus reasonable profit, which shall be included in the Contract Price. After receiving this further notice, the Engineer shall proceed in accordance with Sub – Clause 3.5 [Determinations] to agree or determine these matters. However, if and to the extent that the Engineer’s failure was caused by any error or delay by the Contractor, including an error in, or delay in the submission of, any of the Contractor’s Documents, the Contractor shall not be entitled to such extension of time, Cost or profit.