Automated Transit Network Opportunities

Slides:



Advertisements
Similar presentations
Tysons Tysons Corner Circulator Study Board Transportation Committee June 12, 2012.
Advertisements

Mass Transit OSullivan Chapter 11. Outline of the Chapter Analyze some empirical facts about public transit in the United States Analyze the commuters.
ATN Applications: Montgomery County, Maryland Transit Opportunities Advanced Transit Association Annual Technical Meeting January 11, 2014 College Park,
Master Plan Personal Rapid Transit Analysis Baltimore/Washington International Thurgood Marshall Airport Peter Muller, P.E. Master Plan Personal Rapid.
Personal Rapid Transit Impact on Intermodality and Safety at Heathrow and Masdar Dr Chris Elliott FREng Pitchill Consulting Ltd.
Colorado Rail Passenger Association Spring Meeting June 1, 2013.
Justifying Rail Bias Factor for Houston METRO’s Transit Model Presentation by Vijay Mahal, HDR Inc Vincent Sanders, Houston METRO May 18, 2009 TRB Applications.
New Technology Feeder Systems Advanced Transit Association Seminar May 4-5, 2007 West Virginia University Morgantown, W V Robert Johnson R. E. Johnson.
NEW YORK CITY TRAFFIC CONGESTION MITIGATION COMMISSION NYSDOT Comments on New York City Traffic Congestion Mitigation Plan Bob Zerrillo, Director, Office.
Scope Team Topic Presentation- Light Rail Topic: Transportation Presenter: Nick Stanley Fall 2004, University of Minnesota.
Personal Rapid Transit Fort Carson Community Sustainability.
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
Improving Transportation Through Innovative Engineering A Personal Rapid Transit Airport Automated People Mover Comparison Peter Muller PRT Consulting.
Public Expenditure Analysis May 4, 2007 Cost-Benefit Analysis: Seattle Link Light Rail, Initial Segment Your presenters: Annie Gorman Hazel-Ann Petersen.
Sponsored by Cedar Rapids Area Chamber of Commerce and the The Greater Cedar Rapids Community Foundation.
Presentation to: Inaugural meeting of North East Rail Forum – July 2014 Jerry Farquharson Director of Business Planning First ScotRail.
BART Briefing for Mayor’s Transportation 2030 Task Force April 30, 2013.
Bus Rapid Transit: Chicago’s New Route to Opportunity Josh Ellis, BRT Project Manager Metropolitan Planning Council.
Ultra at Heathrow & beyond BASE April 2013 Presentation by Adam Ruddle, Key Account Manager, Ultra Global PRT.
Transportation leadership you can trust. presented to TRB Planning Applications Conference presented by Vamsee Modugula Cambridge Systematics, Inc. May.
The Role of Automation in Revolutionizing Public Transportation Alain L. Kornhauser Professor, Operations Research & Financial Engineering Director, Program.
Improving Transportation Through Innovative Engineering Some Personal Rapid Transit Activities Peter Muller Some Personal Rapid Transit Activities Peter.
Personal rapid transport (or transit) = ”automatbane(?)”
Erik Aylen San José State University Department of Mechanical Engineering ME 295A Mechanical Engineering Project I Design and Control of Linear Induction.
Initial Applications for Automated Vehicles on Exclusive Roadways Advanced Transit Association Annual Technical Meeting January 11, 2009 Washington, DC.
2020 GHG? Gas tax? Car insurance? Will SoCal meet 2020, 2035 GHG transp tgts? Raise gas tax by $5/gal  28% less driving? Save $ on car insurance when.
Los Angeles County Metropolitan Transportation Authority Overview of Metro’s Transportation Program Pam O’Connor Metro Chair July 25, 2007.
Purpose To develop and evaluate a range of transit and transportation alternatives throughout the MPO area, considering: u Regional Goals and Objectives.
Slide 1 PRT Industry Status Steve Raney, Ultra Global PRT Outline –Technology / what it is  video –4 PRT systems {1. Masdar, 2. Heathrow, 3. Suncheon,
Express/Rapid Bus Opportunities for Priority Bus Transit in the Washington Region Sponsored by National Capital Region Transportation Planning Board Chun.
I-75 South Metro Managed Lanes. Project Description Two reversible toll lanes along I-75 South 12 miles from SR 155 to SR 138 Anticipated opening date.
December 4, 2008 Preserving the American Dream 1 1 Faster by Bus By Gabriel Roth.
Commuter Rail Studies Summary of MAG High Capacity Transit Study June 2003 Commuter Rail Summary.
Automated Transit Network
The Gauteng Economic Indaba Transport and Logistics Mr Piet Sebola Group Executive Strategic Asset Development Date: 09 th June 2016.
Master Plan Personal Rapid Transit Analysis for Baltimore/Washington International Thurgood Marshall Airport by Peter Muller, P.E. President, PRT.
Stage 2 Light Rail Transit Program “In the ground ready”
Integrating Transit and Highway Solutions In High Volume Corridors
Cost-Benefit Analysis: Seattle Link Light Rail, Initial Segment
Airport and Ground Access Choice Modeling
Heather Copp – CFO and AGM of Finance and Administration
Nick Wood, P.E. Texas A&M Transportation Institute
Reinventing Cities of Jharkhand
Advanced Transit Automation:
“efficient movement of goods across the entire state of Oregon”
Autonomous Vehicle Pilot Project
ASSOCIATION OF AMERICAN RAILROADS. ASSOCIATION OF AMERICAN RAILROADS.
D Line Station Plan Overview
Autonomous Vehicle Pilot Project
Advanced Transit Systems Opportunity for Deployments
Staten Island Bus Study Public Workshop
Capital Programming Committee South Coast Rail Phase 1 Service
D Line Station Plan Overview
NVCOG Regional Transportation
D Line Station Plan Overview
Lorain County Transit Needs Assessment
D Line Station Plan Overview
30 miles in 1 hour 30 mph 30 miles per hour
D Line Station Plan Overview
Sustainable Aviation and Evolution
Bus Rapid Transit Study
Electrification of the 16th St. Mall Shuttles
LRT, GRT, PRT Comparison Peter Muller, PE Ingmar Andreasson, Ph. D.
Advanced Transit Automation:
D Line Project Overview
Kabinkový systém electrically powered - 2kW continuous
RTC RIDE Service Improvement Recommendations
Capital Trade-Offs Evaluated three major capital expenditure scenarios
Presentation transcript:

Automated Transit Network Opportunities Smart Commute Transforum Erie, Colorado June 19, 2017 Peter J. Muller, P.E., M.ASCE President PRT Consulting, Inc. and the Advanced Transit Association

Agenda Automated Transit Networks (ATN) Vision ATN State-of-the-Industry ATN for Smart Commute Metro North (SCMN)

Automated Transit Networks (ATN) Vision

Citylink …Hyperloop’s missing link

Severe Free-flowing Congestion 10 20 30 40 50 Time (years) Severe Impact on Congestion Free-flowing 10 20 30 40 50 Time (years) Severe Free-flowing Congestion Source: ITS International

Cornell & Muller. US Utility Patent No. 9,085,375 B2

4 stations 42,000 daily $2.3 B Loses money 41 stations 195,000 daily $0.86 B Profitable

Citylink …improving the quality of life

ATN State-of-the-Industry

Existing ATN Systems 2getthere, Masdar City, UAE Ultra, Heathrow Airport, UK Vectus, Uppsala, Sweden Vectus, Suncheon, Korea 2getthere, Rivium, The Netherlands Modutram, Guadalajara, Mexico

2getthere (The Netherlands) Deployed 2010 Speed 25 mph Range 37 miles Power Battery Passengers 4 Capacity 2,880 pphpd

2getthere (The Netherlands) Deployed 1999 Top speed 37 mph Range 31 miles Power Battery Passengers 12 + 12 Capacity 13,000 pphpd 0.5 min, 26. This system is installed in the Netherlands (upper picture). A new large deployment with 3rd generation vehicles (lower picture) is occurring in Taiwan. 12 seated plus 12 standees

Modutram (Mexico) Deployed Demo Speed 33 mph Range 24 miles Power Battery Passengers 6 Capacity 4,000 pphpd

Ultra (United Kingdom) Deployed 2011 Speed 25 mph Range 12 miles Power Battery Passengers 4 Capacity 2,400 pphpd

Vectus (Korea) Deployed 2013 Speed 40 mph Range unlimited Power Wayside Passengers 6 + 3 Capacity 7,200 pphpd

ATN for Smart Commute Metro North (SCMN)

124th LEGEND SCMN BNDRY RTD RAIL

HWY 7 LEGEND RTD RAIL ATN AT-GRADE ATN ELEVATED 124th – HWY 7 = 14 mins 124th

ATN/Rail Comparison 124th to Highway 7 Weekday ridership 10,000 Stations 12 2 Highway 7 to DUS (ride time) 41 minutes 36 minutes Headway (peak/off-peak) 1 minute 20/30 minutes Capital cost $180 M $263 M Operating cost per rider $3.20 NA 1. Source: RTD

LONGMONT LEGEND ATN AT-GRADE ATN ELEVATED 124TH – Longmont = 47 mins Capital Cost - $600 - $800 M HWY 7 124th

124th LEGEND RTD RAIL ATN AT-GRADE ATN ELEVATED 124th – DUS = 25 mins (27 by rail) Capital Cost = $800 - $1,050 M DUS

LONGMONT HWY 7 124th LEGEND SCMN BNDRY ATN AT-GRADE ATN ELEVATED RTD RAIL Longmont – DUS = 68 mins (45 – 70 mins by car) DUS

Automated Transit Network Opportunities Smart Commute Transforum Erie, Colorado June 19, 2017 Peter J. Muller, P.E., M.ASCE President PRT Consulting, Inc. and the Advanced Transit Association