Annual General Meeting

Slides:



Advertisements
Similar presentations
________________________________________________________________ What price do you put on pump run rate and production efficiency on your horizontal wells?
Advertisements

M. J. Haigh Well Design Differentiators CO 2 Sequestration in Depleted Reservoirs SPE Presented at Offshore Europe 2009 Conference.
2 nd Annual Appalachian Basin Gas Well Deliquification Seminar Hilton Garden Inn, Pittsburg, PA June , 2011 Breakout Session Results Issues for.
SAGD ELift Applications
University of Iowa Indoor Practice Facility Outside-the-box HVAC Lincoln Pearce, PE – KJWW Engineering David Hahn – University of Iowa Chilled Water Plant.
Draft JTP for Hydraulic & Pneumatic Actuators National Technical Systems / Elwin Jang / December 2000.
Presentation to Repsol by MYS on 9/13/06 Well Completion Design for Tight-Gas Formations M. Y. Soliman, PhD September 20, 2006 Mendoza, Argentina.
ARTIFICIAL LIFT SYSTEMS ® © 2002 Weatherford. All rights reserved. Unloading Water from Oil Wells Using Air.
GARP®Presentation ALRDC Seminar May 14 th, 2014 Daryl Mazzanti – Garp Services, LLC Wholly owned subsidiary of Evolution Petroleum Corp (EPM- NYSEMKT )
Surveying Survey measurements can be represented graphically: diagrams; maps; profiles; and cross sections. And to determine: locations; directions; areas;
Actuators.
TwO Stage Artificial Lift System (GARP®) New Improvements Hydraulic Fluid Assist (no Gas Required) Solids Separation & Control Packerless Design Free.
Adjustable Speed Drives (ASD): Failure Reduction and Production Optimization Notes go here. Frank Ochoa 07/25/2007.
Presented by Sudiptya Banerjee
1 New Production Technologies for Lifting Liquids from Horizontal Wells Radius Energy, LLC May, 2015.
Williston Basin Petroleum Conference Advances in Technology Panel Efficient Fracture Stimulation Rick Ross – Whiting Petroleum Corporation 1.
Batch Pumping – A New Method to Solve Downhole Liquid Holdup Bill Elmer 2005 Beam Pumping Workshop.
Problem Wells Break out Session 2006 International Sucker Rod Pumping Workshop Houston, Texas.
Under-balanced well bore cleanout and production evaluation technology.
© Copyright 2005 POSC Volume Reports and Flow Networks Overview.
PHASE 7 FACILITIES ENGINEERING
Pumping System Efficiency. Lower energy cost occurs with a master meter for several wells, but the operator usually is responsible for the poles and.
ARTIFICIAL LIFT METHODS
GLO Offshore South East Asia Steve ‘Gas Lift’ Gossell – MEA Senior Gas Lift Engineer.
3rd Annual Appalachian Basin Gas Well Deliquification Seminar Marietta College, Marietta, Ohio June 4 - 6, 2012 Selection of Artificial Lift Method Breakout.
FLUID POWER CONTROL ME604C.
Hilario J. Negrón (787) ext 3223 (787) Measuring Operational Efficiency.
Submitted by Pradeep pataskar Roll no.11031M02034.
Lecture 10 Production Engineering
Application of new technologies developed by the "OilGasScientificResearchProject" Institute.
Oil and Gas Technology Program Oil and Gas Technology Program PTRT 2432 Artificial Lift Green Book Chapter 1 Planning an Artificial Lift Program.
H & P Formulas Engineering II – August The parts and values of concern…. D 1 = diameter of cylinder (in) D 2 = diameter of piston rod (in) P 1 =
Cost Effective Offset Well Frac-hit Protection Solution
COAL BED METHANE:EXTRACTION TECHNOLOGY
Engineering II – August 2016
Power Plant Construction and QA/QC Section 2.1– Steam Fundamentals
Topic 10 Fossil Fuels pages
HYDRAULIC & PNEUMATIC CIRCUITS
Enhanced Plunger Lift System plunger Lift for the 21st Century
PNEUMATICS Chapter 3 ROTARY COMPRESSORS
SUSTAINABLE DRILLING OF OIL & GAS WELLS
Energy balance for the compressor in this figure:
Features of the GAHP technology
R. J. Jones 5930 Bandini Blvd. Los Angeles, CA.,
Technical data‘s of lubrication pumps of oil loaded gas compressors medium : lubrication oil with flare gas Low pressure compressors on oil platform 6.
SUBSEA GAS BOOSTING Jon Steinar Gudmundsson October 8, 2008
ESP System Standards October 3rd, 2015 Norman W. Ritchie.
Artificial Lift System And Sucker Rod Pumps
Question 1) Are two ports current leads?
Transwestern Station 1 Heat Recovery Project
Topic 10 Fossil Fuels pages
Carlos S. Aguirre & Thuy Vu, Ph.D Department of Civil Engineering
TUHWALP Introduction Cem Sarica.
ITEMS TO CHECK ON Running Pumps
Process Equipment Design and Heuristics – Gas Compressors
StimGun™ and StimTube™ Tool Successes in West Texas
New Oil and Gas Drilling and Production Technologies
Rod Pumping Overview Artificial lift is required when a well will not flow or won’t produce at a satisfactory rate Rod pumping is one of several forms.
A typical lift scenario with tubing landed in the curve
Powered By-
Pseudopressure Function
DN OAD Processes: RG 0316 : Offtake Workstream
Electric Potential Energy (voltage)
A built-in gear pump pushes the milk through the frother
Chapter 11 Fluids.
TURBINE AND PUMP Eg: steam turbine, gas turbine, hydraulic turbine
High Liquid Volume Plunger Lift in the Permian Basin
________________________________________________________________
Presentation transcript:

Annual General Meeting October 26th 2016

Horizontal Pump Overview Deployment results from latest installation have proven the theory that varying degrees of depletion has occurred along the wellbore We base this on the following ; Recovered frac sand Gas interference at the heel area Cross flow Fluids separation Water traps

Gained Knowledge/Next Step Effective pump positions in the horizontal section Initial production improvements tempered by water loading The results indicate stranded reserves remain in place The system is robust and versatile, allowed for consistent and selective inflow and outflow control from the frac ports to the production tubing Next Steps; The addition of electric over pneumatic activation, pressure monitoring and individual pump control will transition the system into a production management platform and allow commercialization in deeper longer wellbores Preliminary design work has begun, vendors have been identified and testing is continuing in the shop to determine flow dynamics associated with increased pump cycles.

2 deployments/different results Pump#4 2015 “Heel” 845mtr MD Pump#3 2015 966mtr MD Pump#2 2015 1114mtr MD Pump#1 2015 “Toe”1261mtr MD Pump#4 2016 “Heel”1005mtr MD Pump#3 2016 1125mtr MD Pump#2 2016 1245mtr MD Pump#1 2016 “Toe”1410mtr MD

Rod Pump Overview The 1.5” and 2.5” high angle Reciprocating Rod Pump are ready for commercialization. The pumps performed as expected in horizontal and high deviation >75deg landed angles The Large bore pump is in late development The company has a number of technical sessions booked with interested parties particularly for cyclic steam and high volume well bores. Seal technology testing is continuing for high temperature installs

Thank you