Bruker Energy & Supercon Technologies (BEST)

Slides:



Advertisements
Similar presentations
PLAZMA HEATING PRODUCT INDIA G-52 LAWRENCE ROAD,INDUSTRIAL AREA, NEW DELHI
Advertisements

1 As Class Convenes u Find your team u Pick up your team’s folder; Becoming an Expert u Remove any old work and Class Process Check for Becoming an Expert.
Electrical Power Systems
Chamber Calibration Bench Status Barrel Muon Alignment Group 9 April 2003, J MocholíWorkshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy.
How Does Electricity Flow? Electricity & Magnetism Science Instructor: Miss Aartman.
© Siemens AG All rights reserved. The importance of infrastructure June 2011.
PSAA Curriculum Unit Physical Science Systems. Problem Area Energy and Power Systems.
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
Circuits What is electricity and how can you transfer it through circuits? What are the differences between parallel and series circuits? What are the.
Superconducting Magnet Division Ramesh Gupta High Field Magnet R&D with YBCO July 26, 2011Slide No. 1 EUCARD2 VIDEO CONFERENCE.
© Cisco Systems, Inc. All rights reserved. Cisco Public ITE PC v4.1 Chapter 3 1 Chapter 3: Computer Assembly – Step by Step IT Essentials: PC.
GENPRO Electrics & Electronics. . Switch Mode Power Supply-Output : 100A / 60 V-6KW GENPRO Electrics & Electronics.
IHEP participation in SIS300 production UNILAC SIS 18 SIS 100/300 HESR Super FRS NESR CR RESR Institute for High Energy Physics Protvino, Russia FAIR meeting.
Define… Electrons- a tiny, negative charge that moves around the space outside the nucleus of an atom Current-the flow of a charge through a material.
Thoughts about the MQXF development plan P. Fessia Thanks to discussions within the MDT section (P. Ferracin, J. C. Perez, E. Todesco, P. Ferracin), L.
-Shakil Raiman.  Conductor  Insulator  Current  Measuring Current  Voltage  Measuring Voltage.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 WP-10 Status.
1 2 Does the light bulb light? 3 Name the Symbol.
Electrical Circuits. Getting the Idea Whenever you turn on a lamp or watch TV, you are using electrical energy. This energy is in the form of a flow of.
Plans for EuCARD-2 cable manufacturing A. Kario, A. Kling, J. Brand, W. Goldacker Institute for Technical Physics, Karlsruhe Institute of Technology.
MICE Target Mechanical Design l Status of Target ref. Schedule »Drawings –Drawing list created (see next slide) includes inventory –Drawings being released.
Superferric CEA. CEA is involved in the FAIR/GSI project: Responsible for the conceptual design preparation and technical follow-up of 24 superferric.
© 2013 The Leadership Circle, All Rights Reserved. Company Confidential Prepared by [Name] [Name] [Date]
HQ01e3 test summary December 2012 M. Marchevsky, LBNL.
Task 6: Short Period Nb 3 Sn Superconducting Helical Undulator Jim Clarke/George Ellwood 28/11/2012.
© 2008 Cisco Systems, Inc. All rights reserved.Cisco ConfidentialPresentation_ID 1 Chapter 3: Computer Assembly IT Essentials 5.0.
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
EuCARD WP 7 – High Field Magnets Task – Radiation certification Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task
Electric Current- A flow of electric charges is an electric current.
19.3 Resistance and resistivity
Simple Circuits & the Transfer of Electrical Energy
Hi-Lumi Conductor Procurement A.Ballarino, B. Bordini, L. Oberli HL-LHC/LARP International Review of Superconducting Cable for the HL-LHC Inner Triplets.
Electric Energy Notes.
Innovation with Integrity Bruker Energy & Supercon Technologies (BEST) EUCARD2 status by Bruker HTS (together with KIT) CERN-BHTS T-conference
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
1 © COPYRIGHT 2010 SAPIENT CORPORATION | CONFIDENTIAL Subtitle goes here | Date goes here Title of the presentation Two lines max.
Task 6: Short Period Nb3Sn Superconducting Helical Undulator George Ellwood
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
The Business of Science ® Page 1 © Oxford Instruments 2012 CONFIDENTIAL Bi-2212 Round Wire Performance Continuous Improvement OST, EUcard2 CERN, June 14,
The agile pilot at KONE Mikko Mattila The pilot  New technology –New suppliers –Many different types of technologies  Many locations –Global.
MICE Target – Status & Plans Chris Booth Sheffield 28 th February 2006.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
RFQ coupler S. Kazakov 07/28/2015. Requirements: Coupler requirements Expected problems: Heating (loop, ceramic window, etc.) Multipactor Solutions: Appropriate.
High Temperature Superconducting (HTS) Cable Project
WP10 General Meeting, Giovanni Volpini, CERN 1 December 2015 Test progress INFN 1.
ELENA installation progress F. Butin / ELENA collaboration.
QXF Coil Fabrication & Tooling Reaction / Impregnation
L. Bottura and C. Senatore on behalf of WP10.2 February 7th, 2017
Coil Design and Fabrication
Electrical Circuits.
UNIT 5 ELECTRICITY AND MAGNETISM
AEGIS Magnet System.
SPS cryogenic proximity equipment and SM18 validation
CEA KE 2775 progress meeting WP3 – FRESCA 2 Magnet
Target and Horn status report
EuCARD2 WP 10.2 HTS Conductor
OBJ: Given notes, activity sheet SWBAT explain voltage, resistance and four factors that affect resistance with 70% accuracy. DN: Watch Electricity.
Electrical Circuits Dynamic Electricity.
HIE-LINAC status report
Magnetic gap calculation
Electric Energy Notes.
Overview of mechanical design & construction
Advanced Research Electron Accelerator Laboratory
Investigation one: Electricity
CNGS horn / reflector in 2005: The story of the glass ring insulator
Electricity SPI Identify how simple circuits are associated with the transfer of electrical energy when heat, light, sound, and chemical changes.
8.2 - Electric Current.
Electric Circuits.
Hi-pot results summary
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
Presentation transcript:

Bruker Energy & Supercon Technologies (BEST) BRUKER HTS – EUCARD2 SUMMARY: video-conference CERN, BHTS March 18th 2016 Title picture can be exchanged in the masterslide.

BRUKER HTS Capabilities of BHTS pilot-lines BHTS main mission: manufacturing of 2G HTS coated conductors Two production lines in Alzenau: Pilot-line for 4mm wide HTS tapes with the capability to process a max. single piece tape length of 600m IN OPERATION Pilot-line for 12mm wide HTS tapes with the capability to process a max. single piece tape length of 100m RAMP-UP IN PROGRESS Comprehensive testing devices for process and quality control of coated conductors 4mm wide HTS tape without insulation 4mm wide HTS tape with insulation on a 20“ reel CONFIDENTIAL PAGE 2

BRUKER HTS EUCARD2 Summary A12 pilot-line ramp-up Starting in Jan 2016 a continuous flow of 12mm wide substrates has been established on the workstations SUB (substrate preparation) and ABAD (YSZ coating) Several 12mm wide YSZ coated substrates have been quality checked and are now awaiting for being processed on workstation PLD (HTS coating) SUB ABAD Page 3 CONFIDENTIAL PAGE 3

BRUKER HTS EUCARD2 Summary A12 pilot-line ramp-up At workstation PLD the built-up of the PLD300 coater is in progress New processing chamber and heater with chopper are intergated in PLD300 Installation of power feeding, controllers, vacuum and optical adapters is in good progress, nevertheless, installation got interrupted, heater needs to be reworked, target manipulator delivery date postponed to wk12 Milestone M4: first A12 coating done Page 4 CONFIDENTIAL PAGE 4

BRUKER HTS EUCARD2 Summary A12 pilot-line ramp-up PLD300 – Installation phase in progress Electrical wiring in progress, power ON planned in wk11 LABVIEW SW control programming in progress Connection to media supply and facility installations in progress Page 5 CONFIDENTIAL PAGE 5

BRUKER HTS EUCARD2 Summary A12 pilot-line ramp-up PLD300 – Installation phase in progress Page 6 CONFIDENTIAL PAGE 6

BRUKER HTS EUCARD2 Summary A12 pilot-line ramp-up PLD300 – Installation phase in progress Page 7 CONFIDENTIAL PAGE 7

BRUKER HTS EUCARD2 Summary A12 pilot-line ramp-up Due to the late availability of PLD300 a continuous production flow of 12mm tapes can only start from June on Temporary approach to have 12mm wide tapes available earlier: YSZ coated substrates will be coated with PLD600 PLD PLD300 Page 8 CONFIDENTIAL PAGE 8

BRUKER HTS EUCARD2 Summary A12 pilot-line ramp-up Temporary approach to have 12mm wide tapes available earlier: YSZ coated substrates will be coated with PLD600 Winding of 80m long 12mm wide tape Substrate drum with 12mm tape loaded on substrate drum with HEX600 in PLD600 ready for process Page 9 CONFIDENTIAL PAGE 9

BRUKER HTS EUCARD2 Summary A12 pilot-line ramp-up Ag-metallization: temporary drum solution for 12mm wide tapes Page 10 CONFIDENTIAL PAGE 10

Innovation with Integrity No pictures on last slide! Copyright © 2014 Bruker Corporation. All rights reserved. www.bruker.com