GEM DAQ-Chamber Integration Test Stand for GE2/1 & ME0 at Florida Tech

Slides:



Advertisements
Similar presentations
USCMS Collaboration Meeting, Boulder, CO, May 17, 2012 (via EVO)
Advertisements

Kondo GNANVO Florida Institute of Technology, Melbourne FL.
1 Long Term Module Testing-Anthony AffolderTPO, December 11, 2003 Current Module LT Testing Capability Only Vienna Boxes Available  10 slots at each site.
GEM Design Plans Jason Gilmore TAMU Workshop 1 Oct
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
1 MUON UPGRADE: ME0 GMM All engineering drawings from Sasha Surkhov PRELIMINARY !!
US CMS Phase 2 R&D Discussion 30-July-2013 “Phase 2 muon R&D” J. Hauser, UCLA  Add redundancy (power) to trigger where most needed  First and innermost.
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
SBS/A1n DAQ status Alexandre Camsonne August 28 th 2012.
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
Statement of Interest in CMS MPGD High-  Muon Upgrade Florida Tech CMS Muon Group Marcus Hohlmann Florida Institute of Technology, Melbourne, FL, USA.
DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting DESY, Hamburg, Germany March 20 – 22, 2013.
Alignment Software from the ME perspective Marcus Hohlmann Florida Tech Muon Alignment meeting during CMS week - CERN, March 15, 2005.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
News on GEM Readout with the SRS, DATE & AMORE
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
March 2005, USCMS Trigger video meetingD. Acosta1 Revised Schedule for SP Pre-Production Continued testing of first two pre-production boards over next.
1 ME1/1 OTMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
GEM Detector R&D at Florida Tech – “Get to know each other” –
Florida Institute of Technology, Melbourne, FL
Wesley SmithMay 12, 2008 Trigger Budget Review - 1 US CMS Mid-Year Budget Review Trigger Wesley Smith May 12, 2008 Outline Overview of Activities FY 08.
Large-Area GEM Detector Development at CMS, RD51, and Fl. Tech – A brief overview – Marcus Hohlmann Florida Institute of Technology, Melbourne, FL PHENIX.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting Argonne National Laboratory March 19 – 21, 2014.
1 Preparation to test the Versatile Link in a point to point configuration 1.Versatile Link WP 1.1: test the Versatile Link in a point to point (p2p) configuration.
Dick Loveless Upgrade report 12 Oct EMU Upgrade Report Dick Loveless University of Wisconsin 12 October 2012.
General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal”  Recent developments:  ME0 inserted into HGCAL as for other.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
Construction and beam test analysis of GE1/1 prototype III gaseous electron multiplier (GEM) detector V. BHOPATKAR, E. HANSEN, M. HOHLMANN, M. PHIPPS,
GEM R&D updates from Chinese groups Yuxiang Zhao University of Science and Technology of China May 24,
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Panja Luukka. Silicon Beam Telescope (SiBT) Group Since 2007 a collaboration of several CMS institutes has been operating a silicon micro-strip beam telescope.
ELENA installation progress F. Butin / ELENA collaboration.
The Maraton LV system Michela Lenzi INFN Firenze Thanks to V. Bocci, P. Ciambrone, A. Sciubba LV Power Supply RCM AC/DC converter.
GEM Integrated PCB readout and cooling
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
OTMB Development and Upgrade Plan for LS2
PIXEL CAEN Installation Status
P. Paolucci G. Pugliese M.Tytgat
University of Wisconsin
Upgrade activities at Clermont-Ferrand
T1 Electronic status Conclusions Electronics Cards:
GEM Upgrade Projects: Schedule
EMU Slice Test Run Plan a working document.
INO TRIDAS presentations
10/month is the present production rate 2 FTE + sporadic contributions
Large CMS GEM with APV & SRS electronics
UCSB Testing Status Anthony Affolder
Pierluigi Paolucci - I.N.F.N. Naples
EIC Tracking Meeting, March 26, 2012
CMX scope and functionalities
Phase 2 R&D – Brief Introduction –
US Module Testing Progress Report
Current Module LT Testing Capability
HL-LHC upgrade at IPHC news
US Module Testing Progress Report
GEM for CMS Electronics Overview
US Rod Burn-in Readiness DAQ Hardware/Power Supplies
Pierluigi Paolucci & Giovanni Polese
19-April-05 Peripheral Crate Testing, Installation, and Commissioning PC I&C Feb ’06 EMU Fred Borcherding 16-May-19 PC I&C Feb'06.
Plans for the 2004 CSC Beam Test
DAQ for SBS GEM SBS collaboration meeting August 6th 2019
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
CSC Electronics Installation and Commissioning Oct ‘06
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
Presentation transcript:

GEM DAQ-Chamber Integration Test Stand for GE2/1 & ME0 at Florida Tech Marcus Hohlmann Florida Institute of Technology USCMS Phase-2 Muon Upgrade Workshop, Texas A&M – Dec 7, 2016

Motivation Provide an additional test bed for GEM chamber/DAQ integration that is located in the US Convenient for US people to work on, e.g. Grounding & noise studies Performance studies under high-rate radiation (X-rays) Florida Tech has a GE1/1 chamber production and commissioning site (for QC1-5); expertise will allow us to build a GE2/1 module or ME0 chamber prototype in situ for electronics integration testing Florida Tech to pivot from GEM chamber R&D to GEM electronics/DAQ R&D for GE2/1 & ME0 and synch with overall USCMS Phase 2 GEM efforts 12/7/2016 GEM DAQ-Chamber Integration Test Stand - M. Hohlmann, USCMS Muon Upgrade Workshop, TAMU

Approach For starters, set up a complete GEM DAQ system for GE1/1 (“beg, borrow, and steal” so far) Begin with old partially instrumented long GEB and a few VFAT2’s; set up and learn GEM-DAQ Attempt to integrate with existing GE1/1-V chamber If successful, take data with X-rays at high rate Compare VFAT2 performance with APV25 performance Next, upgrade to state-of-the-art GEM DAQ Either VFAT2/OHv2B or VFAT3/OHv3, depending on what’s state-of-the-art when we are ready for this step Integrate with a GE1/1 production chamber; we expect to produce our first chambers in April ‘17 Finally, switch to GE2/1 & ME0 integration work 12/7/2016 GEM DAQ-Chamber Integration Test Stand - M. Hohlmann, USCMS Muon Upgrade Workshop, TAMU

Status Hardware procurement The following items are in hand at Fl. Tech: µTCA crate (Schroff) 2 NAT power modules for crate - 48V DC power supply (powerone Aspiro 2U unit, 4.8kW) 1 GLIB 5 VFAT2 Items to be taken from TAMU to Fl. Tech this week: Partial long GEB (can be instrumented with up to 4 VFATs) OHv2a with SFPs Items on order or to be ordered soon: NAT µTCA carrier hub (MCH) 4 LV linear power supplies (0-30V, 5A) Optical fibers Software: nothing yet; will bug you when h/w ready for it Follows setup at CERN TIF 12/7/2016 GEM DAQ-Chamber Integration Test Stand - M. Hohlmann, USCMS Muon Upgrade Workshop, TAMU

Plan & Schedule GE1/1 chamber material will not arrive at production sites until end of March ‘17 Use this schedule gap to set up initial GEM DAQ test stand Upgrade when chamber production schedule allows Make test stand available to US collaborators Suggestion for additional potential use cases of this test stand are welcome! Offers of 2017+ project funding also welcome! 12/7/2016 GEM DAQ-Chamber Integration Test Stand - M. Hohlmann, USCMS Muon Upgrade Workshop, TAMU

Thank you!

Backup 12/7/2016 GEM DAQ-Chamber Integration Test Stand - M. Hohlmann, USCMS Muon Upgrade Workshop, TAMU