EVN TOG-meeting Onsala Space Observatory

Slides:



Advertisements
Similar presentations
Programme: 145 sessions & social events
Advertisements

United Kingdom New Zealand United Kingdom New Zealand Iceland.
Onsala Space Observatory Present status and technical directions of the EVN Michael Lindqvist Onsala Space Observatory, Sweden Arpad.
Sweden’s foreign trade March Källa: WTO; International Trade Statistics 2009.
DBBC3 Development - Digital Base-Band Converter 3
E-VLBI Development at Haystack Observatory Alan Whitney Chet Ruszczyk Kevin Dudevoir Jason SooHoo MIT Haystack Observatory 24 March 2006 EVN TOG meeting.
E-VLBI Development at Haystack Observatory 5 th Annual e-VLBI Workshop Haystack Observatory 20 September 2006 Alan R. Whitney Kevin Dudevoir Chester Ruszczyk.
E-RemoteCtrl: Concepts for VLBI station control as part of NEXPReS Arpad Szomoru (JIVE) Alexander Neidhardt (FESG), Martin Ettl (FESG), Matthias Mühlbauer.
Training.
Overview of our channels (Jan 2014) Social media at Syngenta Classification: INTERNAL USE ONLY.
DBBC Stutus Report November 2007 G. Tuccari, W. Alef, S. Buttaccio, G. Nicotra, M. Wunderlich.
Nov 29, 2006Dwingeloo, EVN CBD Meeting EVN D igital B ase B and C onverter Status Report Status Report G. Tuccari.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array The VLBA Sensitivity.
LOFAR AND AFRICA Daan du Toit DST – South Africa.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array The VLBA Sensitivity.
High-Level Organization ALMA Board AUI NRAO North American ARC Manager North American ALMA Regional Centre AMACASAC Joint ALMA Observatory ALMA Director.
IVS-4th General Meeting, Concepción- Chile, Jan 2006 DBBC - A Flexible Platform for VLBI Data Process G. Tuccari, S. Buttaccio, G. Nicotra - Istituto di.
Niagara Framework in the Clouds Scott Boehm. … what the heck does that mean??
VLBI/eVLBI with the 305-m Arecibo Radio Telescope Chris Salter Tapasi Ghosh Emmanuel Momjian Arun Venkataraman Jon Hagen.
Chapter 15 Development of the profession of O&M around the world.
E-VLBI FP6 Proposal. Outline Background The Call Content of Proposal & Aim Possible Participants Overall preparation plan.
76-m Lovell Telescope Jodrell Bank, UK Even big telescopes see no more detail than the naked eye High bandwidth data transfer - the future of European.
Swedish LOFAR: John Conway Hamburg, Sept 17th, 2008 Onsala Space Observatory, Swedish national facility for radio astronomy, provides access for Swedish.
Westerbork Netherlands Dedicated Gbit link Onsala Sweden Gbit link Jodrell Bank UK Dwingeloo DWDM link Cambridge UK MERLIN Medicina Italy Chalmers University.
DBBC Status Report 1) Summary of firmware development and results of tests and Haystack comparison 2) Status of FiLa 10 GE board (needed for Mark 5C and.
The (IMG) Systems for Comparative Analysis of Microbial Genomes & Metagenomes: N America: 1,180 Europe: 386 Asia: 235 Africa: 6 Oceania: 81 S America:
1 eVLBI Developments at Jodrell Bank Observatory Ralph Spencer, Richard Hughes- Jones, Simon Casey, Paul Burgess, The University of Manchester.
NEXPReS Period 3 Overview WP8 FlexBuff High-Bandwidth, High-Capacity Networked Storage Ari Mujunen Aalto University Metsähovi Radio Observatory Finland.
EVN Performance and Reliability Iván Agudo. Collection of Highlights A large improvement of the EVN in terms of new stations & sensitivity! First fringes.
SA1: second year overview Arpad Szomoru JIVE January 30EXPReS Board Meeting, Utrecht, the Netherlands: SA1Slide #2 Outline Accomplishments in 2007.
2007 April 17EXPReS Annual ReviewSlide #: 1. EXPReS Annual Review April 17 EXPReS Project Team JIVE, Coordinating Institution.
WP5: Cloud Correlation Arpad Szomoru Joint Institute for VLBI in Europe.
WP8: FlexBuff Ari Mujunen, Tomi Salminen Aalto University Metsähovi Radio Observatory NEXPReS 2nd Board Meeting – 2012 June 20 – NORDUnet, Copenhagen Denmark.
PRESENTATION DATEEXPReS- TITLE OF YOUR PRESENTATIONSlide #1 What is EXPReS? EXPReS = Express Production Real-time e-VLBI Service Three year project (March.
NEXPReS Period 3 Overview WP5 Cloud Correlation Arpad Szomoru, JIVE.
TOW May 2011 DBBC2 G. Tuccari – INAF Istituto di Radioastronomia.
NEXPReS Period 3 Overview The hunt for 4Gbps fringes Or, may the fringe be with you Or, nothing like living on the edge Arpad Szomoru, JIVE.
Safe and secure control of VLBI stations from remote Alexander Neidhardt (FESG, TUM) Martin Ettl (FESG/MPIfR), Jim Lovell (UTAS),
Shatskaya M, Abramov A., Fedorov N., Kostenko V., Likhachev S., Seliverstov S., Sichev D. Astro Space Center, P. Lebedev Physical Institute, RAS, Moscow,
WP7: Computation in a shared infrastructure Mark Kettenis JIVE Presented by Norbert Meyer PSNC.
NEXPReS Period 3 Overview WP2 EVN-NREN Richard Hughes-Jones, DANTE.
WP7: Computation in a shared infrastructure Mark Kettenis JIVE Presented by Norbert Meyer PSNC.
Title FABRIC Progress - Mark, Huib etc. T. Charles Yun Project Manager EXPReS/JIVE.
NEXPReS WP5 - Cloud Correlation Work Package Overview Arpad Szomoru JIVE.
Presentation Title Presentation subtitle Your name Your title, organisation.
Your name Your title, institution. RI READ ME To modify “Event – Location – Date” footer on all slides, go to Insert > Header & Footer. Change.
TOG, Dwingeloo, March 2006, A. Szomoru, JIVE Status of JIVE Arpad Szomoru.
ITCandor 2015 Predictions IT and Communications Forecast
SA1: overview, first results
Technical Operations and R&D at JIVE
Shatskaya M, Abramov A. , Fedorov N. , Kostenko V. , Likhachev S
Where Are You From? Famous People.
Building the Square Kilometer Array – a truly global project
Mark 5 / VLBA Correlator Topics
EXPReS, NEXPReS, UniBoard
VLBI in China and the Collaboration with NL
eInfrastructures: Usage Policy
Hotel name…. Occupied rooms Total person-nights Here of Israeli nights
EVN Performance and Reliability Jun Yang, JIVE 4 Dec, 2009
Snapshot of Global PV Markets
Electrification Products
NML Institutional Repository (IR)
SA1: third year overview
UNIBOARD : VLBI APPLICATION CHARACTERIZATION
The e-EVN Arpad Szomoru, JIVE.
IT Services Global Market Report Segments And Insights To
DBBC Stutus Report November 2007
2006 Rank Adjusted for Purchasing Power
PPT Live 2005 English is spoken here...
Technology and the Future of the EVN
Presentation transcript:

EVN TOG-meeting Onsala Space Observatory June 27-28, 2012

EVN TOG-meeting, OSO, June 27-28, 2012 Мероприятия: June 27, Workshop, focused on the DBBC June 28, TOG-meeting Участники: Sweden, Finland, Germany, Netherlands, Russia, Poland, Italy, Spain, Latvia China, Korea, South Africa, UK, USA

EVN TOG-meeting, OSO, June 27-28, 2012 June 27, Workshop, focused on the DBBC Докладчик Тема доклада / сообщения M. Lindqvist Local Arrangements/Opening Remarks G. Tuccari General presentation of the DBBC system with the hardware functionalities of all the sections G. Tuccari, M. Wunderlich DDC (tunable configuration) description and command set, optimization and system testing PFB (polyphase fixed configuration) description and command set, optimization and system testing FILA10G description and command set. SPECTRA (spectrometer), description and command set, optimization and system testing M. Wunderlich DBBC - Spare parts and maintenance A. Bertarini DiFX for zero baseline tests and more E. Himwich FS implementation for the DBBC H. Verkouter Mark5C usage for 2 and 4 Gbps recording A. Mujunen NEXPReS WP8 FlexBuff D. Smythe Mark6 M. Taveniku XCube + demo

EVN TOG-meeting, OSO, June 27-28, 2012

EVN TOG-meeting, OSO, June 27-28, 2012

EVN TOG-meeting, OSO, June 27-28, 2012 June 28, TOG-meeting Направление Докладчики Reliability/Performance of the EVN Yang, Tenkink, Leewinga Amplitude Calibration Yang, Keimpema, Lindqvist Digital BBC-systems (DBBC, R1002, CDAS) Tuccani, Bach, Lindqvist, Bezrukovs,Campbell, Nosov, Zhao JIVE Szomoru 2-4 Gbps observations EVN, EVN+VLBA Szomoru, Verkouter, Bach, Lindqvist, Tuccani Haystack Smythe Mark 5 Smythe, Lindqvist NRAO Romney Sched Developments Campbell Field System, status and new features Himwich Technical priorites for the EVN Szomoru, Lindqvist, Campbell Activities at EVN stations (all) All Activities at potential new EVN stations Bezrukovs, Taehyun Jung RadioNet3 Lindqvist

EVN TOG-meeting, OSO, June 27-28, 2012 • Cloud correlation: • TUM and MPG making good progress • Tool for system monitoring/alerting in place • High bandwidth on demand • Standard has been decided upon • Successful BoD demo Onsala-JIVE, Jodrell Bank-Metsahovi at 4Gbps • Providing NRENs with use case • Computing in a shared infrastructure • Many new features added to SFXC • Demonstration of automated triggered observation very succesful • High-bandwidth, high-capacity networked storage • Hardware platform purchased at many sites • Speed of development has picked up considerably

EVN TOG-meeting, OSO, June 27-28, 2012 Доступные ресурсы: http://91.151.182.25:8080/share/ Login / password: Iaa / alfresco Repository -> Guest Home -> EVN -> . . .

EVN TOG-meeting, OSO, June 27-28, 2012

WVR Расчет влажной компоненты тропосферной задержки распространения радиосигнала Семейство радиометров в OSO Обработка результатов наблюдений радиометров в OSO On-line доступ к РВП в РАО «Светлое» Обработка результатов наблюдений радиометров в ИПА

OSO

WVR

WVR

WVR

WVR

WVR Series Processing