Cover-Gear Box assembly

Slides:



Advertisements
Similar presentations
How To Catch A Swarm Using Buckets. Take 2 plastic buckets and cut a large matching hole in the bottom of each. Using screen wire, preferably 1/8 hardware.
Advertisements

Instructions for making plunger fork tool. Drawing for the trigger assembly.
Tools MVRT Season. Overview Design –Combination Square –Caliper Fabrication –Hacksaw –File –Drill –Sandpaper/Steel Wool –Shears Assembly –Allen.
Tools and Fasteners And, Their Uses.
Robot Quick Build Session Transmission Assembly Instructions Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team 1750 Special Thanks to.
Optical Manufacturing Solutions 1 Probe Assembly.
Rework Procedure for Wash Motor Pulley Change Model : Rosa & Rosa Plus Part Details & Tools required Sr NoPart DescriptionQtyTool used to replace old artworks.
Kwikset Rekey Ultramax Rekeying the Ultramax by Kwikset this presentation is designed for beginners.
Yamaha oil pump rebuild
3” BACKWASH VALVE WITH SUPERSTAR ACTUATOR BASIC SERVICE MANUAL Does not apply to PLC-MP version SUPERSTARS.
2G BBULBE PASS Instructions-4 Replacement of bubble generator.
Print Head Removal, Replacement and Alignment. Page 2 CONFIDENTIAL Print Head Assembly Removal  Turn off printer A.C. power  Unplug the printer from.
Mer/Sup. 2 & 3 Door Evaporator Coil Repositioning Procedure S. Starnes 7/11/03 1. Remove the 2 screws holding one end of the evaporator coil. (view shows.
Introduction to the Microscope Care Parts Focusing Drawing Making a Wet Mount Staining Clean Up Trouble Shooting.
860 21/2”-10”. Modification Overview  Production of the 2½” – 10 sizes began in  Lead free version (LF860) was introduced in Parts do not.
2008 Cadillac CTS With Original Antenna
CMM MTR LBNL Homebrew Assembly Notes Silber
American Electrical, Inc. Junction Box / Hookup Box Fast and easy way to make electrical connections An assembled kit – no need to procure and assemble.
NSCI 310 Homework 6 Due 2/15/07 Describe your observations for your chemical reactions experiments. Discuss what happened during your chemical reactions.
Chapter 3 Computer Assembly. 3. Introduction Assembling computers is a large part of a technician's job. This Chapter will teach you how to work in a.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
How to Make a Badge *All manufacturers must read this TWICE before attempting to make their badges! Press F5 (on the upper part of your keyboard) to begin.
Unit 1004 Produce basic woodworking joints © Pearson Education 2010 Printing and photocopying permitted Learning Outcome 1 Know about marking out Learning.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
SVD Mechanics 21th B2GM Florian Buchsteiner (HEPHY Vienna)
Peregrine the Martian Lander Assembly Instructions Mission to Mars 2008.
957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”. Modification Overview  Production began in 2002 and is current.  Early versions used a ¾” Flomatic RPZE for.
This is the finished body RADIUS LOFT EXTRUDE. Creating the body taper Open the wing Click on new part in context.
Swingtech International Swingtech International is proud to presents the SwingTECH System. Specially designed by a teaching professional to help students.
Limits and Fits Need for different types of fit Limits of size and Tolerance Principal Terms Explained Definition of different types of Fit.
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
How to move your horn.. 1.This one is a shot of the horn with the acorn nut removed. STEP 1.
Here’s the flange for the robot. Note colors for locations of pins on interface plate. Red - Anvil Pin Blue - Other Pins Orange - Spring Pin.
This is what we want to create Add component and fix in place Add component and make it spin (Get propeller from the CD or use skills from previous tutorials.
Replacing hardware 3.1 First view a video showing how to prepare a computer system for a hardware installation/upgrade (e.g. Hard drive, DVD Drive and.
© Goodheart-Willcox Co., Inc.. Purchase Quality Tools  With tools, you usually get what you pay for  Quality tools are lighter, stronger, easier to.
+ Smartphone Microscope By: Eric Zunica NEM 3002 – Principles of Nematology Entomology and Nematology Department.
Description of Hand Tools Tools help us do work and make things. Tools.
M300, M300N, M300Z (2½ ”–10”) M300A (2½ ”- 4”). Modification Overview  Production began in 2000 under the Hunter name. In 2002 it was produced as the.
Rear end assembly.
PostBase Automatic Feeder Component Removal Service Training
How to Hollow out a box in Tinker Cad
Types of angles.
Hybrid Issues.
Ongoing and to do work M.Lenti.
Plastic Recessed Kit for Escape Sign
Yeti 400 Reprogram SOP 5/1/2017, Yeti firmware rev. 2.0.
Integration issues at IHEP
Rear Cover Assembly.
STEP 1: ASSEMBLE ANGLE PLATES
Take Apart Workshop Connecticut Invention Convention
Louisiana Tech University
Required tools for installation of a V-1020C Speaker with V-9914M-5 Metal Bridge.
Introduction to SolidWorks
Couplings.
Rear Cover Assembly.
957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”.
M500, M500N, M500Z 21/2”-10”.
Types of Angles An acute angle measures less than 90°
C200, C200N, C200Z (2½ ” – 10”) C200A (2½ ”- 6”).
Here’s the flange for the robot
Required tools for installation of a V-1020C speaker with V-9914 bridge.
M200, M200N, M200Z (2½”– 10”) M200A (2½”- 4”).
C400, C400N, C400Z 21/2”-10”.
C300, C300N, C300Z (21/2”–10”) C300A (21/2”- 6”).
M400, M400N, M400Z 21/2”-10”.
757DCDA, 757N DCDA (21/2”–10”) 757A DCDA (21/2”- 6”)
757, 757N, 757Z (2½ ” – 10”) 757A (2½ ”- 6”).
Find the Distribution Chapter 2.3.
Presentation transcript:

Cover-Gear Box assembly

Terms used Cover (plastic) Gear Box (aluminum)

Aim of the study Check the good alignment of the cover on the gear box permitting to insert the 4 screws that seal the both parts together. Sometimes on the line it is impossible to assemble the 2 parts because the 4 holes are not aligned. The cover hide the gear box hole  the screw can’t enter. Good part Bad part There is a gap between the blue circle (cover) and the red one (screw on the gear box)

Assembly process First the gear box is placed on the tool fixture by 3 pins matching in 3 holes on the gearbox. This operation doesn’t have any influence on the measurement required… The operator place the cover by hand on the gear box using 2 pins and a surface as a stopper. Surface Pins There is a seal on the Cover surface but not used in the simulation

Assembly process Then when the cover seal touch the gear box stopper surface, the 4 screws go down and are assembled at the same time. Pin 1 Mounting Points Pin 2

My modeling First move (gear box to tool)  no influence Second move (cover to gear box) I used a Step plane move aligning first the sealing surface as 1st locator. The others points used are in the model. The hole-pin floats have been switched on. I put a iterative logic condition in order to simulate the fact that if ever at the first shot the 4 mounting points are not aligned it is possible to remove the cover in order to find a correct positioning. That what happens in reality : the screwdriver will make the cover move on the gear box thanks to the hole pin floating until a assembly position would be found. The measurement I made is a circle interference between half circle of the cover mounting points and the 4mm screw I supposed already in the gear box. The min limit is 0 as I don’t want any interference between the screw and the cover hole.

My modeling All the tolerances are in the model.  true position of the various mounting points  size tolerance of the holes/pin  flatness of the surface Do you see any incoherence in the model ? Does it match with the process description I made to you ? Any advice/improvement we could do ? Thanks !