Status Following these success of VSOP, science targets of VSOP-2 approach the central region of AGN. studies of accretion disks and jets in AGN studies.

Slides:



Advertisements
Similar presentations
Japanese VLBI programs, East Asian VLBI Network and Space VLBI;VSOP-2 H.Kobayashi(NAOJ) 2011, Jan., 27 Future of VLBA.
Advertisements

SKA South Africa Overview Thomas Kusel MeerKAT System Engineering Manager April 2011.
NEXT SPACE VLBI MISSION, ASTRO-G (VSOP-2) AND ITS SPECTRUM MANAGEMENT ASTRO-G Project (JAXA) Y. Murata ( JAXA)
Space radio astronomy observations Y.Hagiwara (NAOJ)
Comments on this template -Leave time for questions -Leave time for demonstration (at the final LRR) -Use your actual hardware in the presentation -Practice.
Millimetron mision sensitivities and instrumentation concept
Very Long Baseline Interferometry (VLBI) – Techniques and Applications Steven Tingay ATNF Astronomical Synthesis Imaging Workshop Narrabri, 24 – 28 September,
VSOP-2 Ground Link Station - Tracking Station Requirements - National Astronomical Observatory of Japan Y. Kono.
SKA-Japan Industry Forum [SKA-Japan Workshop 2010] EMC & Microwave Systems November 05, 2010.
Sep 2003 CCSDS Navigation WG Progress Report MOIMS Meeting Oct 2003 CSC, Maryland, USA Felipe Flores-Amaya CCSDS Navigation WG.
An idea of Space mm/sub- mm VLBI Array Xiao-Yu Hong ( 洪晓瑜 ) Jun-Hui Zhao ( 赵军辉 ) Zhi-qiang Shen ( 沈志强 ) Shanghai Astronomical Observatory ( 中国科学院上海天文台.
Next Space VLBI mission: VSOP-2
Tielong Zhang On behalf of the CGS Team in the Institute of Geology and Geophysics, Chinese Academy of Science Spacecraft System and Payload China Geomagnetism.
E 1 David Murphy 31-Oct-06/1-Nov-02 Agenda + U.S. VSOP-2 Support Plans.
A Proposal Constructing mm/sub-mm VLBI Network by East-Asian Power M. Miyoshi (NAOJ) EAVN Symposium Hokkaido Univ. 2015/07/10 1 Oct VERA
Proposed Versatile 1.2 to 14 GHz Radio Telescope Receiver S. Weinreb, JPL/Caltech, Draft July 5, 2005 Contents 1.Introduction and intended applications.
Science - Coronal heating - Coronal structure / dynamics - Elementary processes in Magnetic Reconnection Mission instruments - Optical Telescope / Vector.
Section Number - 1 NASA’s Goddard Space Flight Center Communication Systems Jason A. Soloff NASA/GSFC Code 567 August 16-17, 2005.
Panel P1J: Navigation Data May 2001 CCSDS P1J Status Report P1 Plenary Meeting May 23, 2001 TSG Meeting May 24-25, 2001 Pasadena, California, USA Felipe.
K band History Science workshop determined efficiency improvements necessary for K Band: weather, observing requests, mapping programs. Only enough funds.
Oct.10, 2007EAMA7 The next-generation Infrared astronomy mission SPICA Outline of SPICA Scientific Research Concept (SciReC) SPICA 研究コンセプト概要 17 th May.
ISAS/JAXA Tracking station. Usuda Deep Space Center Diameter 10m –AE 44% expected Feed & Receiver –Ka-band Trx < 50K expected –cooled LNA –Tsys 140 K.
Status and future of East Asia VLBI network H.Kobayashi(NAOJ) East Asia VLBI
TRIO-CINEMA Meeting at KHU 1 October 19-23, 2009 CINEMA Operations Manfred Bester.
ASTRO-G project VSOP-2 – VLBI Space Observatory Programme times higher sensitivity. 10 times higher frequency observation 10 times higher resolution.
上海天文台 Shanghai Astronomical Observatory 4th IVS General Meeting Spacecraft Tracking with Chinese VLBI Network Xiuzhong Zhang and Chinese VLBI Network Team.
Outlook for European role in the VSOP-2 mission L.I. Gurvits JIVE, Dwingeloo, The Netherlands VSOP-2 meeting Pasadena, CA, USA,
NASA’s Goddard Space Flight Center Lunar Reconnaissance Orbiter Ground System Requirements.
Mission Operations –Launch February 15, 2000 at 22:02:15 UTC = 14:02:15 PST –41 Days IOC and antenna deployment period –2 year science mission operations.
© ИАЦ КВНО ЦНИИмаш Собственность ИАЦ. All rights reserved GLONASS Status and Progress Sergey Revnivykh CGSIC Meeting , Savannah, GA, US.
Q, Ka, K, Ku & X-Band Receivers
JWST Mission CDR Northrop Grumman Space Systems Redondo Beach (CA) April 10-16, 2010.
The Consultative Committee for Space Data Systems 1 JAXA CCSDS Status April 12 – 13, 2005 Kaneaki Narita Consolidated Space Tracking and Data Acquisition.
Action Items 1 November Action Items - I Assess frequency coverage at 22 GHz vs. science goals, and decide whether lower frequency should be changed—Murata,
Next Generation Space VLBI Project: VSOP-2 Inoue, M. 1, Nagai, H. 1, Asada, K. 2, Saito, H. 2, Tsuboi, M. 2, and the Next Generation Space VLBI Working.
10/31/2006VSOP-2 Tracking Station Meeting 1 Lessons Learned From VSOP-1 Larry R. D’Addario JPL.
Notes on this template You may reformat this to fit your design, but make sure you cover the information requested in this template. Presentations should.
About JVN about JVN Status Status Results Results Future plans Future plans Japanese VLBI Network (JVN): recent results and future plans for EAVN Kenta.
Possible Instrumentation Development Items for SKA at ASIAA Chau-Ching Chiong (ASIAA) and Yuh-Jing Hwang, Homin Jiang, Chao-Te Li.
Haystack VLBI Requirements/Plans Astronomy Sheperd Doeleman Haystack Observatory.
Introduction to JEM/SMILES
Korea Aerospace Research Institute (KARI)
JUpiter Icy Moons Explorer (JUICE)
Sketch for a telecoms system
SPF MAG Quarterly Report – Feb 2015
Study on circumstellar maser sources and the JVN (towards the SKA)
Astro-G/VSOP-2 in Europe JIVE, Dwingeloo, The Netherlands
DECIGO Pathfinder Masaki Ando
GLAST Large Area Telescope:
National Astronomical Observatory of Japan Yusuke Kono
Double Star Progress Meeting #3 Beijing 2 July, 2002.
VLBI in China and the Collaboration with NL
Ulysses Nutation anomaly in
Potential NASA Funding Sources
Simulations of the tracking station
L. Kogan (NRAO), S. Likhachev, I. Girin, & V. Ladigin (ASC)
ISAS Solar Physics Yohkoh (1991- ) Hionotori ( )
TEMPO’s Commercially Hosted Payload Concept
System Considerations for Submillimeter Receiver
NRAO-GB Support for VSOP-2
Launch and On-orbit Checkout
First Stage Cryogenic IF Amplifier
(National Astronomical Observatory of Japan)
Astro Space Center of Lebedev Physical Institute, Moscow
VLBA Correlator Interfaces for VSOP-2
VSOP-2 project Update Hisashi Hirabayashi /JAXA VSOP-2 Project status
HMI Top Level Requirements
EVLA Construction Status
Action Items Following these success of VSOP, science targets of VSOP-2 approach the central region of AGN. studies of accretion disks and jets in AGN.
Plenary Round Table Interoperable Space and Enabling Technologies and Capabilities The State of Key Technologies that Ease Interoperability Between Government.
Presentation transcript:

Status Following these success of VSOP, science targets of VSOP-2 approach the central region of AGN. studies of accretion disks and jets in AGN studies of non-thermal emission from YSOs And we revenge the maser observations. the highest resolution studies of Galactic masers and extragalactic megamasers. And the capability of other observations have been discussing.

ASTRO-G current status Budget Request to the government. (July, 2007) Approved as a new project. (not a full) Project team formation Project Manager: Hirobumi SAITO + ~20 engineering staffs Edwards Akihiro DOI (April~) Hirabayashi Masato TSUBOI (April~) NAOJ: Kameno is now in Kagoshima-U.    Hagiwara (Nov.~) New Post-Doc in JAXA and NAOJ Contractor Selection. Bus system, Main Antenna, Coolers On going : Thrusters, Low Noise Receivers I/F control document (ICD) preparation. (March-May, 2007) Preparation of stating the project from April, 2007 System Definition Review (March, 2007) Review for Project Starting. (March, 2007) Following these success of VSOP, science targets of VSOP-2 approach the central region of AGN. studies of accretion disks and jets in AGN studies of non-thermal emission from YSOs And we revenge the maser observations. the highest resolution studies of Galactic masers and extragalactic megamasers. And the capability of other observations have been discussing.

Deployment of ETS-VIII antenna (Dec. 25-26, 2006) We use … NASDA HPでcheck!

Deployment of ETS-VIII antenna (Dec. 25-26, 2006) We use … NASDA HPでcheck!

VSOP-2 System Block Diagram Observing System Telemetry handling/heater control system Telecommunication/ Command System Attitude and orbit Control system GPS + 加速時計 での高精度軌道決定(3cm以下の精度) 4リアクションホイール+2CMGで高速姿勢変更に対応 Power supply system

VSOP-2 “Latest” Block diagram of the observation system Antenna, I talked ahead. Frontend, horn, LNA, BPF I show the development of some systems in briefly.

ASTRO-G GPSR status 3 candidates JPL GPS receiver. Blackjack : ~ IGOR, Blackjack New development for including Galileo IDC (I/F control Document) -> Need JAXA/JPL contract BRE IGOR ~ Blackjack: 4 RF ch, 48 tracking ch., L1, L2, GPS only Pyxis: 4 RF ch. 96 tracking ch, L1, L2, L5, GPS/Galileo Domestic JAXA/NEC-Toshiba Space GPSR 2 Ch RF, 8 ch, L1, L2, GPS only Need do decide weather we need Galileo or not ? (Feb. 2007) Need ICD for ASTRO-G soon (April 2007) Budget source ? JPL ? / ISAS (JAXA) Following these success of VSOP, science targets of VSOP-2 approach the central region of AGN. studies of accretion disks and jets in AGN studies of non-thermal emission from YSOs And we revenge the maser observations. the highest resolution studies of Galactic masers and extragalactic megamasers. And the capability of other observations have been discussing.

ASTRO-G LNA status Accelerometer : Decided not to use for ASTRO-G Study of SLR possibility. candidates Domestic Development EUDYNA(Former Fujitsu) Device (Baseline) Discrete HEMT for 8 GHz. MMIC HEMT (InGaP/InGaAs p-HEMT) development (22, 43 GHz) InP development (other budget) NRAO RX European RX Need to discuss cost, schedule, ICD for possible laboratory. Need ICD for ASTRO-G soon (April 2007??) Budget source ? ISAS (JAXA)/ JPL or ESA/EC … Following these success of VSOP, science targets of VSOP-2 approach the central region of AGN. studies of accretion disks and jets in AGN studies of non-thermal emission from YSOs And we revenge the maser observations. the highest resolution studies of Galactic masers and extragalactic megamasers. And the capability of other observations have been discussing.

Design of the frontend LNA MMIC HEMT LNAs Wide band, low loss feed and polarizer studies Cryogenic studies Space-qualified cryogenic coolers ASTRO-E2 (Xray) ASTRO-F(Infrared) PLANET-C(Vinus) SMILES (Earth Obs.)

Current status of Front-end Developments 22/43 GHz Cooled Receiver MMIC Device High Quality & Reliability GaAs MMIC HEMT device Low Power Consumption Microwave components Low Thermal Conductivity WG Circular Polarizer Horn Possibility of design without isolator Thermal Shield at horn window Layout components 110 K 30K 2 coolers ? ASTRO-F type Observing frequencies of VSOP-2 are these. We revenge the 22GHz of HALCA. For now, 22 and 43 GHz receivers are cooled. But 8GHz is not cooled because of the restriction of mass and power budget. Wide band data downlink is one of technical challenges. These bring the improvement of sensitivity. Apogee height is about 25000km, so we can get the resolution of 75 mas for 22GHz and… And other option are these. Phase-ref brings more higher sensitivity and astrometric observation. Dual polarization bring us the studies of magnetic field.

Schedule Following these success of VSOP, science targets of VSOP-2 approach the central region of AGN. studies of accretion disks and jets in AGN studies of non-thermal emission from YSOs And we revenge the maser observations. the highest resolution studies of Galactic masers and extragalactic megamasers. And the capability of other observations have been discussing.

ASTRO-G Development schedule Financial Year (Apr-Mar) 2000~ 2005 2006 2007 2008 2009 2010 2011 2012 ~ Spacecraft Development Phase Events Tracking Stations Ground Radio Telescopes. Concept Design Basic Design Detailed D. Manufacture and Test Operation WG phase Pre-Project PM FM Design FM Manu I/F test Unit test Final Test FOp Operation Phase -E Pre Phase -A Phase -A Phase -B Phase -C Phase -D Launch △ Project starts △ Review △ Review △ Review △ Review More than 5 years operation △ △ △ △ △ △Budget Request Selection of the science mission in ISAS △System I/F Fixed Approval of project preparation Design of PFM Structure Antenna, Obs.system Attidute control system NEXT (X) Solarsail (Jupiter) △Selection of contractors Ground Tracking Stations Developments Op. Test

ASTRO-G Development schedule (Observing system) Financial Year (Apr-Mar) 2000~ 2005 2006 2007 2008 2009 2010 2011 2012 ~ Spacecraft Development Phase System HW Main Antenna GPS, LNA, other Units Observing System Ground System (USUDA) Concept Design Basic Design Detailed D. Manufacture and Test Operation WG phase Pre-Project PM FM D. FM M. I/F T Unit test Final T. FOp Operation △7B Phase -E Pre Phase -A Phase -A Phase -B Phase -C Phase -D Launch ICD FIX △Review △Review △Review Concept D. Basic D. MTM/TTM Detailed D. MTM/ TTM M. MTM/ TTM T. PFM R. I/F T. Final T. F Op In Orbit Operation △11B △10B △7B △2B △8M △2B △7B △12B 10B△ △2B ↑ ↓ Concept D. 1 Module Basic D. Main Str. Detailed D. Main Str. M. PFM R. Antenna T. I/F T. Final T. F Op In Orbit Operation ICD FIX 6M △ FM D. FIX △ I/F Test (11) S/C simulator EM D. EM M. EM T. Concept Design △3B △1B △7B △11B FM D. FM M. FM T △3B Freq Control Doppler Mes. AUX data extract (When? -TBD) △7B △5B △10B IF I/F QPSK DEM VSI I/F D M. T D M. T △9B △6B

ASTRO-G TS Development schedule (DRAFT) Financial Year (Apr-Mar) 2000~ 2005 2006 2007 2008 2009 2010 2011 2012 ~ Spacecraft Development Phase Observing System Usuda TS US budget & TS (GB?) European budget & TS (YEBES) Other TS Southern H. Concept Design Basic Design Detailed D. Manufacture and Test Operation WG phase Pre-Project PM FM D. FM M. I/F T Unit test Final T. FOp Operation △7B Phase -E Pre Phase -A Phase -A Phase -B Phase -C Phase -D Launch ICD FIX △Review △Review △Review FM △ I/F Test (11) S/C simulator EM D. EM M. EM T. △Ready for TS (9) Concept Design △3B △1B △7B △11B D M. T D M. T IF I/F QPSK DEM VSI I/F Freq Control Doppler Mes. AUX data extract (When? -TBD) △9B △6B request△11 △3 review △8 MoO deadline △9 MoO deadline Concept Study money GTS GRT Op. Test D M. T EC FP7 deadline Budget National Agency To ESA D M. T D M. T

VSOP-2 international collaborations VSOP-2 collaboration Based on VSOP type collaboration Tracking stations (1 JAXA, 1-2 NASA, 1 ESA) Compatibility test at 2010 GRT(Ground Radio Telescope)’s and Correlater (GVWG) E-ASIA Collaborations: GRT, Correlater, Receiver ? EVN, SKA, VLBA, Australia, Asia… GRT test observation at 2011. Pre-launch survey Navigation On-borad instruments (Not in VSOP) GPSR, Accelerometer, Transmitter LNA Simulator, AIPS(++?) update. Forming International WG. International Science Team (Survey etc..) Following these success of VSOP, science targets of VSOP-2 approach the central region of AGN. studies of accretion disks and jets in AGN studies of non-thermal emission from YSOs And we revenge the maser observations. the highest resolution studies of Galactic masers and extragalactic megamasers. And the capability of other observations have been discussing.

Mission Responsibility Plan (DRAFT) Budget Oper. Spacecraft JAXA GPSR JPL Or JAXA (TBD) LNAs TBD JAXA+NAOJ in current plan, Add better one? NAVIGATION JAXA and JPL? GTS: Usuda GTS: Greenbank NRAO GTS: Yebes ESA OAN GTS: Southern H. GRT: EAVN J+K+C each Japanese/Korean/Chinese antennas GRT: VLBA GRT: EVN JIVE EVN GRT: others Cor: Korea-Japan J+K KASI J+K=NAOJ+KASI Cor: VLBA Cor: JIVE TBD? Others Simulator, AIPS’, International WG (VISC2, GVWG), Science Center?, Following these success of VSOP, science targets of VSOP-2 approach the central region of AGN. studies of accretion disks and jets in AGN studies of non-thermal emission from YSOs And we revenge the maser observations. the highest resolution studies of Galactic masers and extragalactic megamasers. And the capability of other observations have been discussing.