Day 25.3. 09:00-11:30: Optics at 3.5 TeV Optics re-measured with AC-dipole. Excellent reproducibility. Small emittance increase from AC-dipole. Collapsed.

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

Mystery unable to inject: timing, BIS, SIS… 8:15 to 12: 30 Injection/LBDS studies  Fine delay adjustment of injection kickers  Synchronization of MKI.
Day ● 09:00-14:00: Collimation setup 3.5 TeV – Slowed down by losses induced by tune hump. – 48 collimators set up. – Beam dumped by ATLAS during.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Beam expected in the afternoon PM: – Establish first-turn – Establish closed orbit – Rough correction of machine parameters Evening: – RF capture Night:
Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Monday :00 Injection for physics fill # :00 Stable beams fill #1816, luminosity ~1.2x1033 cm-2s-1 11:08 Beams dumped. QPS trigger on detector.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
MD Wed – Sat DayTimeMD Wed06:00UPS repair, ATS optics checks w/o beam 12:00Cycle, test ATS optics w/o beam 16: TeV: BPM offset determination for.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Ion Commissioning: Thursday & Friday
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
MD Planning Fri – Sat (26. – 27.8.)
Wednesday 8.9 External crossing angles:
1st LHC MD Period Started
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Saturday 24 March 2012.
Wednesday 21 March 2012.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Barbara Holzer, Jorg Wenninger
Machine availability reaching well over 80%
Tuesday TOTEM and transverse loss map (1) OK
LHC commissioning Week 38
Coordination by E. B. Holzer & J. Wenninger Production
Wed :40 Lost S78 - QPS controller.
Mike Lamont, Jorg Wenninger
Week 36 plan Todo’s: And also: 12+b injection.
Friday March 4th 08h32: Access for beam dump system.
Week 35 – Technical Stop and Restart
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Monday Morning – recovery from cryo.
Tuesday Loss maps in the night:
Planning at 5 o’clock meeting Friday
Friday morning 10:30 Optics measurements and corrections.
Thursday :00: Physics fill from the night shift
Friday Morning 7:30 injection for fill 2908
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
Summary Thursday h21: Stable beams fill #1303.
Aims for the week Recover from technical stop and precycle at 10A/s
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Tuesday morning 08:30-09:00 Squeeze with probe.
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Summary week 18 Intensity ramp up & production
90m "proper" VdM scans in the 90m/10m optics
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Programme for Friday 9 July
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Monday :00 – 15:00 : Stable beams 15:30 : Recover…
Summary for LPC (March 7th, Ralph Assmann)
Plan for 1 m b* J. Uythoven & J. Wenninger
Polarity inversion 07:00 ALICE solenoid and dipole polarity switched to positive External Crossing angle polarity unchanged at injection/ramp & squeeze.
Wednesday 23/2 Thanks CRYO!!!.
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Another Immortal Fill….
Wednesday morning / afternoon
15/12/2009 Vacuum interlock in sector 78 understood  out-gassing of a Penning gauge ignited as a result of ionization or dust arcing In conclusion: NO.
Tuesday
HI2011 Commissioning Status
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Day 25.3. 09:00-11:30: Optics at 3.5 TeV Optics re-measured with AC-dipole. Excellent reproducibility. Small emittance increase from AC-dipole. Collapsed separation bumps & reproduced situation of 23.3 – OK ! Adjusted overlap IR5 (removed small Xing angle). Understood problem of orbit non-reproducibility in ramp – new settings. 12:00: Collimation setup 3.5 TeV Collimation just started… 12:36: Beam dump after RQTF/RQTD trip 14 PCs trip within 1 ms over all sectors. ‘Undesired’ reset of all RT trims by the reserve/test FB server (was brought up at that time)  locked off by S. Page/EPC. Cause for the other ‘unexplained’ trim Quad trips?

25.3. Beta-beat beam1 evolution

25.3. Beta-beat beam2 evolution

25.3 Emittance increase from AC-dipole Approx. 15% on B1 H from 3 kicks/sweeps Safe Machine Parameters System

25.3. Overlap in IR1 – IR5 from special BPMWF IR1 IR5

25.3. 13:00 ALICE compensator transformer breakdown 18 kV perturbation in Pt2. Affected: Cryo S23, CV, ALICE… Transformer must be exchanged. Local accesses until around 19:00 Klystron 5B1, ADT CV Pt2 ALICE, TOTEM Some TL studies in TI8 from 18:00 Probe bunch, emittance 2.5 nm (phys.), 1.1 um (norm.)

25.3. 22:00 Excellent Cryo news : recovery around midnight ! Plan for the night : 450 GeV collimation setup check, 3.5 TeV for collimation setup 04:00 beam in the rings Some ‘funny’ orbit changes from IR2. To be understood. 450 GeV collimation setup check Looking good for beam2, possible hierarchy issue on beam1 – tbc. Problems to inject 4 bunches for setup check, last bunch to TDI– to be checked.. 6:30 Ramp to 3.5 TeV This time orbit is good. Beam at 3.5 TeV – Collimation team starting ….

25.3 Collimation setup test – Qv resonance beam2 Safe Machine Parameters System

25.3 Collimation setup test – dp/p shift beam2 Safe Machine Parameters System

25.3 Collimator setup test beam1 – not quite as expected Primary Secondary ~ same level than primary Safe Machine Parameters System

Collimator setup test – beam2 Primary Safe Machine Parameters System

25.3 Protection/MP setup for 3.5 TeV - todos Collimator setup Dump protection (TCDQ) setup Dump protection setup test Debunch beams, dump (simulation of asynch. Dump)  1 destructive test Collimator setup test H, V, dp/p  3 destructive tests Collimator + TCDQ ramp TCDQ – beam Software Interlock (activate) Orbit Software Interlock (activate) Safe Machine Parameters System

25.3 Protection/MP setup for 450 GeV - todos Collimator Setup Dump Protection (TCDQ) Setup Revisit…. Revisit…. Dump protection setup test Debunch beams, dump (simulation of asynch. Dump)  1 destructive test Collimator setup test H, V, dp/p  3 destructive tests TCDI (TL) collimator setup check High(er) intensity injection tests – possible request to allow for injection of 5E10 in empty ring in inject & dump mode Orbit Software Interlock (activate) Safe Machine Parameters System

25.3. Program for next 24+ hours Once more: shift by 24 hours. Start compressing… 25 THU N 4 Recovery from 18 kV perturbations Collimation check 450 GeV 26 FRI M Protection device and collimator setting-up - 3.5 TeV A LBDS 450 + 3.5 TeV Protection and collimator check - 3.5TeV 27 SAT 8 'Higher' intensity 450 GeV - preparation for stable beams Two beam operation 3.5 TeV - non-colliding STABLE 2-3h 28 SUN Collimation 450 GeV - if needed Contingency 450 GeV Collision STABLE BEAMS 29 MON Preparation MD