FAA Implementation of Amendment 1

Slides:



Advertisements
Similar presentations
Regional RAIM Prediction System – Progress Report
Advertisements

1 Marinus C. F. Heijl Acting Director Air Navigation Bureau ICAO 30 March 2007 SYMPOSIUM OUTCOMES AND THE WAY FORWARD.
1 PP 48 Use of GNSS distance instead of DME B. Rabiller CNS-ATM steering group meeting Gatwick February 2008.
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
International Civil Aviation Organization European and North Atlantic Office OVERVIEW OF THE AMENDMENT - ICAO EUR FPL2012 Workshop Kiev, Ukraine 29 June.
Data-link Elements and Role of Stakeholders – Reflections of an ANSP
European Organisation for the Safety of Air Navigation 2012 FPL Task Force Revised Specifications for 2012 FPL in EUR Region Andrew Hill, Eurocontrol.
European Organisation for the Safety of Air Navigation Presentation to ICAO Workshop Kiev 28 July – 1 July 2010 EUR Regional Implementation of Flight Plan.
European Organisation for the Safety of Air Navigation Presentation to ICAO Workshop Kiev 28 July – 1 July 2010 EUR Regional Implementation of Flight Plan.
USER COMMUNITY NAVIGATION TRANSITION PLAN 19 TH ANNUAL FAA/JAA INTERNATIONAL CONFERENCE June 3-7, 2002 Phoenix, Arizona Presented by Frank Alexander Northwest.
Mr. Hooper Harris FAA/JAA Annual Meeting Phoenix, AZ June 3 - 7, 2002
APAC PBN Seminar F.LECAT (ICAO)
ICAO SARPS and Guidance Material
Presented to: By: Date: Federal Aviation Administration Gulf of Mexico 50 NM Lateral Separation – RNAV Routes Project Project Overview ATO Oceanic & Offshore.
International Civil Aviation Organization European and North Atlantic Office CLARIFICATIONS FROM ICAO - ICAO EUR FPL2012 Workshop Kiev, Ukraine 29 June.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
© FREQUENTIS 2010 Datum: Rev.1 Autor: ODOSeite: 1 FPL 2012 Kym Shenton Senior Technical Engineer/Safety Engineer Frequentis California, Inc.
International Civil Aviation Organization SAM Regional Seminar/Workshop Tom Brady ICAO Air Navigation Bureau May Flight Plan Implementation and.
ICAO Flight Plan 2012 Workshop ARE YOU READY? Durban 24 August 2012.
Performance Based Navigation Aviation Industry Forum 18 November 2009.
ICAO Changes to the Present Flight Plan Form Amendment 1 to the PANS-ATM Fifteenth Edition (PANS-ATM, Doc 4444) Tom Brady ICAO HQ.
1 Presented by Erwin Lassooij (ICAO, Montreal) Presented by Erwin Lassooij (ICAO, Montreal) From RNP divergence to Performance Based Navigation Convergence.
PBN Deployment – New Zealand Domestic Airspace CAA PBN Forum November Auckland.
FPL2012 TF#7Brussels 10 October 2012 Kim Breivik Operational Requirements Network Management EUROCONTROL Deployment.
Vendors Conference Prestwick 2011 Customer Picture Implementation of Changes to ICAO FPL 2012 Christoph Kunze Lufthansa Systems 7th December 2011.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
1 PBN Performance Based Navigation - Concept & Change - Presented by: Lex Hendriks, EUROCONTROL ICAO Performance Symposium March 2007 Federal Aviation.
EUR Flight Planning Guidance
Transition to RNP 4/10 (MNPS to PBN)
APAC PBN Seminar F.LECAT (ICAO)
General Rules When completing a flight plan the following rules apply:
Presentation to ICAO Workshop Kiev 28 July – 1 July 2010 EUR Regional Implementation of Flight Plan Amendment 1 for 2012 Issues with Certain Fields.
OVERVIEW OF THE AMENDMENT - ICAO EUR FPL2012 Workshop
Performance-Based Communication and Surveillance (PBCS)
FPL 2012 Kym Shenton Senior Technical Engineer/Safety Engineer
SYMPOSIUM OUTCOMES AND THE WAY FORWARD
PBN Performance Based Navigation
ATS Route and Waypoint Implementation:
Performance Based Communication and Surveillance (PBCS)
Practical Work and Experience With Performance Management
Overview of Continental En-route Navigation Specifications
CLARIFICATIONS FROM ICAO - ICAO EUR FPL2012 Workshop
ADS-B OUT - IATA VIEW ADS-B SITF/11 – Jeju, Korea 24 – 27 April 2012
The Norwegian PBN Implementation Plan Arne Lindberg Inspector ANS
Performance based communication and surveillance
Performance-Based Communication and Surveillance (PBCS)
Air Traffic Organization
2018/6/11 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
PBN Performance Based Navigation
Frequency Finder 1 Installing, Start page, Home page
Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
Regional RAIM Prediction System – Progress Report
Runway Incursion JJ Johnson May 2011
Summary of the results of discussions in the aviation panel
FPL 2012 FPL Vendor Conference Mona Annaddaf Scotland, 7-8/12/2011
OVERVIEW OF THE AMENDMENT - ICAO EUR FPL2012 Workshop
Oceanic and International Operations
Oceanic and International Operations
Oceanic and International Operations
ICAO 2012 Network Operations Update
2012- ICAO FPL Changes the airline viewpoint Arkady Merkulov IATA
Workshop on preparations for ANConf/12 − ASBU methodology
Objective NAV03 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Presented by Eduard Porosnicu, EUROCONTROL
RNAV-RNP CERTIFICATION SUMMARY RNAV-RNP EVOLUTION RNAV-RNP CERTIFICATION SUMMARY2 On-Board Navigation Monitoring 2016.
ICAO 2012 FPL Anthony Coult 8 Dec 2011.
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
SAM Regional Seminar/Workshop
Clause 7 Comment Resolutions
Presentation to ICAO Workshop Kiev 28 July – 1 July 2010 EUR Regional Implementation of Flight Plan Amendment 1 for 2012 OLDI Issues
Presentation transcript:

FAA Implementation of Amendment 1 Vendors Conference Discussion

Outline Issues regarding use of FPL data Regional Variations (SUPPS) FAA Variations (AIP)

Issues Regarding use of FPL Data Length of Field 10, impacts on Line length Fields 09/10 can exceed 69 characters Where should the line break? Field 10b rules Eligibility to file specific equipment or capability PBN information all ANSP requirements should map to Doc. 9613- must be able to assume that RNP-x means the same thing everywhere ADS-B RTCA-DO-260A versus 260B GBAS Landing System- standards? Augmentation in Field 18

Proposed 10b filing instructions ‘N’ or SSR Modes A and C and S File either ‘A’ or ‘C’ or ‘E’ or ‘H’ or ‘I’ or ‘L’ or ‘P’ or ‘S’ or ‘X’ and/or ADS-B either B1 or B2 or neither and/or either U1 or U2 or neither and/or either V1 or V2 or neither and/or ADS-C Neither, one, or both of the entries ‘D1’ ‘G1’

Issues Regarding use of FPL Data Specificity (or lack thereof) of Instructions/Requirements for Field 18 Resulting inconsistencies, limits Effect of unknown data on ANSPs Difficulties discerning which FIR an entry applies to, e.g. ATFMX Use of STS/NONRVSM Reasons for special handling that are not For active flights, modification of items not relevant to the airspace Use of DOF/ - Early Filing APAC recommends States not initially implement FAA will initially accept DOF/ field, but not process. Plan to implement a rejection for flight more than 24 hours in future.

Issues Regarding use of FPL Data Non-Standard Field 18 Indicators Eurocontrol RVR/, RFP/ FAA IRMK/ APAC guidance recently changed to recommend accepting non-standard indicators Different States will likely handle it slightly differently FAA current plan: Accept known non-standard indicators Accept unknown non-standard indicators, but remove the / and place the information after RMK/ We will consider eventually moving to a rejection of unknown, non-standard indicators

Issues Regarding use of FPL Data Eligibility to file specific equipment or capability PBN information all ANSP requirements should map to Doc. 9613- must be able to assume that RNP-x or RNAV-x means the same thing everywhere Some issues- RNAV-1 for FAA requires DME/DME/IRU (D4) or GNSS (D2). PBN/ lists a code for RNAV-1 using DME/DME (D3), this would not be valid for FAA. ADS-B RTCA-DO-260A versus 260B GBAS Landing System- standards? GNSS Augmentation in Field 18

Issues Regarding use of FPL Data Acknowledgments- Most FAA systems provide an ACK or REJ for a filed FPL, for users that register to receive it There is no ICAO standard for this service, so FAA service is unique Will facilitate 2012 testing for flight plan filers in some cases Another item that should be discussed for standardization

Regional FPL Variations via SUPPS No known new variations expected in NACC

ANSP Variations via AIP: FAA Non-standard Field 18 Indicator: IRMK/ Continued use of PBN information in NAV/ Early filing of Flight Plans