Materiel Solution Analysis (MSA) Phase

Slides:



Advertisements
Similar presentations
Optimize tomorrow today. TM Cost and Affordability approach at Development Planning stage 1.
Advertisements

NDIA 15 th Annual SE Conference October 2012 | Page-1 Distribution Statement A – Approved for public release by OSR on 10/09/2012, SR Case # 13-S-0078.
JHP Case Study Introduction 1 UNCLASSIFIED notional data for notional program.
1 May 2009 ver. 5.5 Materiel Development Decision (MDD) MDA: Approves AoA Study Guidance Determines acquisition phase of entry Identifies initial review.
Financial Systems Needs Assessment Project Update Monthly Research Administrators Meeting March 11, 2010.
NSS SMC/XR Template SMC April 2008; rev19 Program Management
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force AFRB MDD Template Rank, Name Office Symbol Date See footnotes on each.
“Common Process for Developing Briefings for Major Decision Points” INSTRUCTIONS Provide Feedback via to: Lois Harper PEO C4I and Space
Gate 1 Input Criteria Objectives of Top Leadership Teams/CDR’s Intent Completed CBA Completed Service review of ICD Identification of mutually shared needs.
DoD Systems and Software Engineering A Strategy for Enhanced Systems Engineering Kristen Baldwin Acting Director, Systems and Software Engineering Office.
JHP Case Study Exercise 1 UNCLASSIFIED notional data for notional program.
Chemical Biological Defense Acquisition Initiatives Forum (CBDAIF)
Gate Review Process presented at DODCAS 2009 DON Session CAPT Jim Baratta Deputy Director, NCCA.
DISTRIBUTION STATEMENT A: Cleared for Public Release by OSR on 8/04/11; SR Case # 11-S-3228 applies R&M Engineering 08/16/11 Page 1 DTM R&M Engineering.
The Defense Acquisition Management System 2009 Implementing DoDI 5000
Life Cycle Logistics.
1 Workshop Schedule Welcome and Workshop Overview International Acquisition & Exportability (IA&E) Fundamentals Break
1 1 Defense Acquisition Guidebook Progress Update March 27, 2012.
CCA LSS Support Slides1 Draft The Defense Acquisition Management Framework. Post Implementation Review (PIR) Capability Needs Satisfaction & Benefits.
Materiel Development Decision (MDD) Information Requirements
Initiate User Needs And Technology Opportunities Finalize ICD, AoA Plan and Develop TDS Initiate Milestone A Program Review Planning Process Initiate Acquisition.
Transmission Advisory Group NCTPC Process Update Rich Wodyka September 7, 2006.
Business, Cost Estimating & Financial Management Considerations
MORS Special Meeting: Risk, Trade Space, & Analytics for Acquisition
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
Contracting (Product) Considerations
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
Lesson Objectives Determine the key Requirements Manager activities and the role of the ICD leading up to the MDD and during Materiel Solution Analysis.
Lesson Objectives Determine the key Requirements Manager activities leading up to the MDD, the outputs of the MDD, and the Defense Acquisition documents.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities July 12, 2016.
System Engineering Considerations (See Chapters 3 and 9)
Life Cycle Logistics.
Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities April 25, 2017.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities March 7, 2017.
MDD to Milestone A Requirements Management Activities
NSS SMC/XR Template SMC April 2008; rev19 Program Management
ISA 201 Intermediate Information Systems Acquisition
Milestone A to Milestone B Requirements Management Activities
Milestone A to Milestone B Requirements Management Activities
Production Considerations
Milestone A to Milestone B Requirements Management Activities
Campus Master Plan.
Workshop Schedule Welcome and Workshop Overview
DAG CH 3 Figure 11: Weapon System Development Life Cycle
Test and Evaluation Considerations
DAG CH 3 Figure 17: Weapon System Development Life Cycle
DAG CH 3 Figure 23: Weapon System Development Life Cycle
MDD to Milestone A Requirements Management Activities
Materiel Development Decision (MDD) to Milestone A (MS A)
Materiel Development Decision (MDD) to Milestone A (MS A)
Information Required for Milestone and Decision Reviews
CBA ICD CDD CDD CPD MDA MDA MDA MDA MDA AoA RVA RVA RVA
DAG CH 3 Figure 13: Weapon System Development Life Cycle
DAG CH 3 Figure 19: Weapon System Development Life Cycle
Product Support Considerations
DAG CH 3 Figure 18: Weapon System Development Life Cycle
DAG CH 3 Figure 28: Weapon System Development Life Cycle
Product Support Strategy
DAG CH 3 Figure 15: Weapon System Development Life Cycle
Definition/Decomposition of Warfighter’s Sustainment Requirements ICD
Requirements Management
Technology Maturation & Manufacturing Development Phase
DAG CH 3 Figure 21: Weapon System Development Life Cycle
DAG CH 3 Figure 27: Weapon System Development Life Cycle
DAG CH 3 Figure 22: Weapon System Development Life Cycle
DAG CH 3 Figure 25: Weapon System Development Life Cycle
Presentation transcript:

Materiel Solution Analysis (MSA) Phase MDD MS A Conduct AoA Perform Analysis to Support Selection of a Preferred Materiel Solution Perform Operational Analysis on Preferred Materiel Solution Perform Technical/Engineering Analysis on Preferred Materiel Solution Establish Program Framework and Strategies Prepare for Initial Review Milestone and Next Phase Final AoA SAG/ESC Service Recommended Preferred Materiel Solution FCB Review Documents: Draft CDD RFP AS SEP (including RAM-C Report) TEMP AoA Report PPP (including IA strategy) LCSP CCE ASR Legend AoA – Analysis of Alternatives AS – Acquisition Strategy ASR - Alternative Systems Review CCE – Component Cost Estimate CDD – Capability Development Document FCB – Functional Capabilities Board IA – Information Assurance LCSP – Life-Cycle Sustainment Plan MDD – Materiel Development Decision MS A – Milestone A PPP – Program Protection Plan RAM-C – Reliability, Availability, Maintainability, and Cost RFP – Request for Proposal SAG/ESC – Senior Advisory Group/Executive Steering Committee SEP – Systems Engineering Plan TEMP – Test & Evaluation Master Plan DAG CH 3 Figure 10: Activities in Materiel Solution Analysis Phase