Downtown Truck Traffic Study

Slides:



Advertisements
Similar presentations
Salt Lake City Downtown Transportation Master Plan Light Rail & Bus; Presentation Background and Introduction August 23, 2006.
Advertisements

Manitoba International Gateway Strategy Manitoba Infrastructure & Transportation.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Freight in the Southeast Conference Bob Romig State Transportation Development Administrator Florida Department of Transportation February 9, 2011 Florida’s.
U.S. 33 Northern Connector Alternative
City of Ashland Transportation System Plan Update September 6 th, 2012.
Environmental Assessment Public Meeting
An Integral Perspective on the S.E. 17 Corridor October 29, 2013 Calgary.
TBG MKE West Waukesha Bypass Study Community Sensitive Solutions Advisory Group Meeting No. 5 January 31, 2011 Community Sensitive Solutions.
South Coast Rail Project February 28, 2014 Stoughton Town Hall.
Wiehle Ave. Traffic Concerns Created by Judy and Doug Pew.
Introducing Bicycle/Pedestrian Planning & School Travel Plans Presentation prepared for the 2010 Active Transportation Conference Jim Fisher, PhD, AICP.
Efficiency through technology and collaboration Road Diet (Roadway Reconfiguration) Every Day Counts 3 Innovative Safety Initiative.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Multimodal Corridor Plan BCC Discussion Item Transportation Planning Division August 19, 2014.
Page Avenue What has it done for the region? A comparison of traffic volumes from Fall 2003 to Fall 2004 What has it done for the region? A comparison.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Meeting March 28, 2006 Item No. xx Supp. Meeting.
Metrobus 30s Line Study Improving Your Customer’s Transit Experience Virginia Transit Association May 20,
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Holly Springs Town Center Transportation Study & Plan Stakeholder Meeting # GPA FALL DETERMINING THE RIGHT TOOLS FOR THE JOB ERIC.
February 24, “Moving Transit Forward”  A fiscally responsible, community-driven vision for restoring, enhancing, and expanding the Metro Transit.
Southern Bridge Project Brown County Executive
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
Bicycle Advisory Board September 2, 2015 Freight Master Plan.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
CITY OF RAINIER RAILROAD CROSSINGS 1. Team Members Matthew DeGeorge Robert Acevedo Josh Crain Jim Harvey Heather Wenstrand 2.
Company LOGO Georgia Truck Lane Needs Identification Study Talking Freight Seminar March 19, 2008 Matthew Fowler, P.T.P Assistant State Planning Administrator.
Shaping our Future Transportation Transportation trends Influencing trends through land use decisions Alternative futures: Base Case and Scenario Complementary.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
Freight Transportation Plan Savannah, GA AMPO Conference - October 23, 2014.
Smyrna’s Major Thoroughfare, Bicycle, and Pedestrian Plan TOWN COUNCIL RETREAT APRIL 14, 2015.
Complete Streets Training Module 4b – Designing for All Users.
1 CPA Request to expand the Oaks Mall Activity Center and change land use to Mixed Use 87 acres 8000 Block of W Newberry Rd.
Pedestrian Facility Improvement Program
Pioneer Road Relocation and Reconstruction Project
Freight Transportation Plan Savannah, GA
Chelan County Transportation Element Update
North Georgia Water Resources Partnership
Nixon Road Corridor Study: Findings & Options
City of New Braunfels Regional Transportation Planning Garry Ford, P.E., PTOE City Engineer June 13, 2017.
For Complete Streets FDOT DRDE Meeting
Downtown Valdosta Truck Traffic Mitigation Study
Reducing GHG emissions from Transportation using Smart Growth
Welcome to CIVITAS.
Center City Connector 101.
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
SR 60/Kennedy Boulevard and Jackson Street Resurfacing Projects
After the NACTO Guide Now I’m going to discuss the options available within the NACTO Urban Bikeway Design Guide.
Integrating Travel Demand Management into the Long-Range Planning Process 2017 AMPO October 19, 2017.
Cheyenne Regional Freight Mobility Plan
83 North Lake Avenue Predevelopment Plan Review
Tampa Historic Streetcar, Inc. May 16, 2018
When Big Data Meets Better Data
Tampa Bay Regional Strategic Freight Plan
Downtown Valdosta Truck Traffic Mitigation Study
Hillsborough County Initiatives to Address School Safety
Comprehensive Transportation Plan
Josephine County TSP Update
Southern Bridge Project Brown County Executive
North-South Corridor Bus Rapid Transit Project
Welcome to CIVITAS.
MPO Board Meeting Briefing
being an important junction on two TEN –T routes that
New Hanover Comprehensive Plan
Presentation transcript:

Downtown Truck Traffic Study Stakeholders Group Nee How (hello) and Shi-wu How (good afternoon)

Valdosta, Georgia 3 Hours Valdosta, GA MPO Designated 2000 ~120,000 3 Counties MPO Staff of 1 Founded in 1861, town moved to be on Railroad 1hr. North of Intersection of I-75 & I-10 US 84, US 41, Moody AFB CSX and NS Railroads, 2 short lines Within 8 hr. drive of Ports in Savannah, Charleston, Jacksonville, Miami, Tampa, Mobile, New Orleans, etc.

Freight Planning in Valdosta 2009 Freight Study White Paper Series Industry/Economic Development Analysis Local Economic Impact of Freight Rail Commercial Vehicle Crash Analysis Downtown Truck Traffic Study

The Issue Logistics and Distribution Growth of Port Traffic Inland Port 1 hr north Through Traffic I-75 LOS F Rail Lines LOS D or F Truck Detour for construction

The Issue Map ID Roadway Name Truck AADT AADT Truck Percentage Year 1 U.S. 84/West Hill Avenue 714 8,280 9% 2014 2 U.S. 84/East Central Avenue 647 5,950 11% 2013 3 U.S. 84/East Hill Avenue 627 6,180 10% 4 5,660 5 U.S. 84/West Central Avenue 623 7,970 8% 6 603 7,530 7 577 7,860 7% 8 U.S. 41/Patterson Street 524 9,830 5% 9 U.S. 41/Ashley Street 450 12,000 4% 10 438 6,870 6% 11 416 8,180 12 381 9,060 13 285 11,200 3%

Impacts 3 new corporate headquarters in last year, new residential growth New retail, dining New hotel 125 rooms 90% occupancy Not safe for pedestrians/crossing roads Damage to buildings – crashes and vibrations Noise, ambiance for restaurants on sidewalk Inside buildings, noise

The Alternatives

Freight Intensive Industries

Truck Following

Paths from I-75

Paths from IPR

Truck Destinations – Phase 1 50% are through tucks 25% go south of downtown to industrial area

From West Downtown

From East Downtown

Truck Destinations – Phase 2 83% through 22% south

The Alternatives

The Alternatives

Alternative Evaluation Savannah Ave. Truck Friendly Central/Hill Pedestrian Friendly

Alternative Evaluation

Alternative Costs Alternative Construction ROW Engineering Total Cost Savannah Avenue (2 Lanes) $5,150,000 $3,552,000 $412,000 $9,114,000 Savannah Avenue (4 Lanes) $7,799,000 $4,646,400 $624,000 $13,069,400 South of Savannah Avenue $8,762,500 $16,413,091 $701,000 $25,876,591 South Bypass (James Road Route) $28,128,000 $14,103,273 $2,250,000 $44,481,273 South Bypass (St. Augustine Road Route) $17,894,000 $12,357,818 $1,431,520 $31,683,338 Western Perimeter $28,914,000 $2,792,727 $2,313,000 $34,019,727

Savannah Ave. Alternative Pros Cons Greater reduction of trucks Easier Fed/State Approval Little ROW needs Minimal EJ impacts Fast/Easy to Construct Central/Hill become livable streets Impact to commercial properties Noise/vibrations only 1 block away from downtown core Vehicle/Pedestrian Safety More reliant on local governments to fund construction

South of Savannah Ave. Alternative Pros Cons Increases vehicle and pedestrian safety Likely to have a mix of funding partners US 84 removed from downtown Central/Hill become livable streets Does not address 25% of truck traffic (southbound) Creates “wall” to the Southside/EJ Impacts Fed/State Approval Harder Greater ROW needs (railroad concerns) Long time to construct Central/Hill, become local streets

Alternative Strategy Short-term Strategy Long-term Strategy An alternative that can be implemented relatively quickly, at low cost, and offer immediate relief to downtown businesses and residents Savannah Avenue alternatives Long-term Strategy An alternative that requires a greater investment of time and financial resources, but may complement other regional goals and be more sustainable New alignments (South of Savannah or South Bypass) Hybrid Strategy Implement a short-term fix while pursuing a longer-term solution

The Alternatives

What’s Next Business Involvement and Input Local government input Choose the least dis-liked alternative

Corey Hull, AICP Transportation Director Southern Georgia Regional Commission Valdosta-Lowndes MPO www.sgrc.us