INSTRUMENT DATA PROCESSING UNIT (IDPU)

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
Advertisements

Instrument TrainingIDPU - 1 UCB, Dec 6, 2006 THEMIS INSTRUMENT TRAINING IDPU.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Pre-Environmental Review May , 2012 Flight Software Peter R. Harvey Mars Atmosphere and Volatile.
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
GoetzFIELDS iPDR – I&T SPP/FIELDS Integration and Test Preliminary Design Review Keith Goetz University of Minnesota 1.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Integration and Test Critical Design Review Rick Sterling University of California – Berkeley Thm_CDR_IT_Revc.
Solar Probe Plus FIELDS ICU/FSW Peter R. Harvey Dorothy Gordon –ICU Will Rachelson – FSW Dec 1, 2012.
ISUAL Long Functional Test H. Heetderks. TRR December, 20012NCKU UCB Tohoku ISUAL Long Functional Test Heetderks Basic DPU Function Verify Power on Reset.
Selda HeavnerFIELDS iPDR – Antenna Electronics Board Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Board Selda S. Heavner U.C. Berkeley
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
MonsonPeer Review – 5 December 2014 SPP/FIELDS LNPS PEER REVIEW Steven Monson University of Minnesota 1.
THEMIS Instrument PDR 1 UCB, October 15-16, 2003 IDPU Mechanical / Thermal Preliminary Design Review Heath Bersch University of California - Berkeley.
TIM Phase A 1 SSL, 8/15/2007 Electric Field and Waves Instrument (EFW) Technical Interchange Meeting EFW Digital Electronics Digital Control Board (DCB)
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
THEMIS Engineering Peer Review 1 UCB, October 15-16, 2003 Electric Field Instrument (EFI) Electrical Fabrication and Test.
TRIO-CINEMA 1 UCB, 2/08/2010 Instrument Interface Board Dorothy Gordon CINEMA - EE Team Space Sciences Laboratory University of California, Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
21-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : Flight Software Peter R Harvey Mars Atmosphere.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR217 RBSP Electric Field and Waves Instrument (EFW) Instrument.
C. Ingraham5-7 March 2001Data Processing Unit IFR1NCKU UCB Tohoku ISUAL Data Processing Unit (DPU) C. Ingraham.
THEMIS Instrument FM2/FM3 PERSystems- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review System Overview Ellen Taylor University.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Acuña1 MAGNETOMETER (MAG) M. H. Acuña NASA/GSFC Laboratory for Extraterrestrial Physics.
THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 1 UCB May 2, 2005 THEMIS Pre-Environmental Review Instrument Verification Overview Ellen Taylor University of California.
SDR 7 Jun Associated Electronics Package (AEP) Curtis Ingraham.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 213 Low Voltage Power Supply & Power Controller Board Peter.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes LVPS+PCB Peter BergRBSP/EFW CDR /30-10/1 IDPU LVPS AND PCB Critical Design Review.
AEP Mechanical and Power System H. Heetderks. CDR July, 2001NCKU UCB Tohoku AEP Mechanical and Power System H. Heetderks 2 AEP Mechanical Design System.
THEMIS Instrument PDRGSE- 1 UCB, October 15-16, 2003 IDPU Ground Support Equipment Preliminary Design Review F. Harvey University of California - Berkeley.
FGM peer CDR GSE - 1 Berlin, April 6, 2004 Ground Support Equipment Concept (GSE) Werner Magnes Institut für Weltraumforschung (IWF) Austrian Academy of.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Flight Software Summary Peter Harvey Space Sciences.
June 16, 2015SPP/FIELDS SOC CDR: Integration & Test SPP/FIELDS Integration and Test SOC Critical Design Review Keith Goetz University of Minnesota
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 EFI Preamp Sensor G.T. Delory, A. Hull, D. Schickele, J. Bonnell & The EFI Team University of California.
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB Flight Software Design Peter Harvey University of California 1.
THEMIS Instrument PDR 1 UCB, October 15-16, 2003 ESA & SST (ETC) Interface Board Preliminary Design Review Robert Abiad University of California - Berkeley.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
THEMIS CDR 1 UCB, June 16, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
THEMIS Instrument CDR 1 UCB, April 20, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
FM2/FM3 IPSR AND FM4/FM5 IPERIDPU- 1 UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE-
THEMIS IDPU PDRPCB- 1 UCB, October 16, 2003 IDPU Power Control Board (PCB) Peter Berg University of California - Berkeley.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 647 Ground Support Equipment Will Rachelson University of.
THEMIS-SCM SCM – OVERALL RESSOURCES – STATUS versus REQUIREMENTS ItemSpecificationStatus Sensor Bandwith Sensor Sensitivity Up to 4 kHz 1 pT/√Hz at 10.
DATA PROCESSING UNIT (IDPU)
Particles and Fields Package (PFP) SWEA Pre-CDR Peer Review
INSTRUMENT DATA PROCESSING UNIT (IDPU) REQUIREMENTS
Command & Data Handling
University of California - Berkeley
CINEMA System Engineering
ESA GSE.
Instrument Data Processing Unit (IDPU)
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
THEMIS Mission Assurance
Boom Electronics Board (BEB)
ISUAL Associated Electronics Package
Preliminary Design Review
THEMIS FM4/FM5 INSTRUMENT SUITE
Low Voltage Power Supply & Power Controller Board
0.0 Instrument Suite Name Presenter’s name
University of California, Berkeley
Digital Sub-System Dorothy Gordon.
Digital Sub-System Bob Goeke.
Launch and On-orbit Checkout
CubeSat vs. Science Instrument Complexity
Presentation transcript:

INSTRUMENT DATA PROCESSING UNIT (IDPU) Mission Critical Design Review Michael Ludlam University of California - Berkeley

Overview Instrument Overview, Block Diagram and Board Status Power Interface, supply switching Data Interface, TM & TC. Operational Modes Flight Software Data Rates and Storage Grounding Diagram Harness Diagram Mass & Power Mechanical ICDs GSE ETU and FM Test Plans Safety / Contamination RFA Responses Schedule

IDPU Box

IDPU Core Functions IDPU Core Functions Instrument signal processing and formatting into CCSDS packet frames Instrument state of health data collection and formatting Instrument data memory storage Instrument data compression Instrument power conversion and regulation Instrument power switching Actuator (Booms, Doors, Attenuators) control Spacecraft Data and Power Interface IDPU Reviews (Instrument Board Reviews were presented at Instrument CDRs) IDPU CDR 20th April 2004 FGM CDR 6th April 2004 SCM CDR 8th April 2004 SST CDR 19th April 2004 ESA CDR 19th April 2004 EFI CDR 20th April 2004

IDPU Team IDPU Core Systems Data Controller Board DCB Dorothy Gordon UCB Power Control Board PCB Craig Domeny, UCB Low Voltage Power Supply LVPS Peter Berg, UCB Flight Software Frank Harvey, UCB Mechanical Heath Bersch, UCB IDPU Instrument Boards DAP Ron Canario, UCB BEB Hilary Richard, UCB DFB Aref Nammari, LASP ETC Rob Abiad, UCB FGE Uli Auster / Werner Magnes, TUBS IDPU Support Functions IDPU Lead: Michael Ludlam, UCB Thermal: Chris Smith, UCB Ground Support Equipment: Jim Lewis, UCB. Reliability and Quality Assurance (R&QA): Ron Jackson, UCB Parts Engineering: Jorg Fischer, UCB

Block Diagram

IDPU Board Status IDPU Core Systems DCB 3 ETUs built, 2 at UCB for interface and software testing. PCB PCB ETU in population . LVPS ETU in fabrication. Flight Software Phase I and Phase III nearly complete. Mechanical ETU housing machined, Vibration completed. IDPU Instrument Boards DAP Revised ETU in fabrication, Original ETU in testing. BEB ETU tests on going. DFB Breadboard delivered to UCB. ETU ready for fabrication. ETC ETU tests on going. FGE ETU built and testing on going. PCB/FGE board in population.

Instrument Power Interface Probe provides Instrument package with 28V through the IDPU. This is nominally 22-34V. Instrument Supply interface is at LVPS. Produces 32 voltages Primaries are current limited Topologies chosen to promote efficiency DC-DC converter frequencies run over 100kHz to avoid science bands. Supplies are soft started to minimize turn-on stresses – input current controlled Regulation – 1% on directly regulated voltages and 5% on auxillary voltages Isolated secondaries where appropriate Impedance: < 500 milliohms DC-10KHz effective line impedance in the service at the instrument connector Grounding: 28V service load shall return its current through the provided return line. The 28V return shall be isolated from signal and chassis ground by at least 1 Mohm and no more than 1F. Inrush and Transients: <10A for 1 msec; < Peak power consumption after 10ms Motor & 28V Actuator Supply interface is at PCB. Voltages are switched on the PCB through board FPGA by command. Heater Supply interface is at PCB Voltages are routed through board to instrument heaters.

Power Distribution

Instrument Switching Services All power switching is controlled by command to PCB. One switch enables the supply (e.g. +2.5VD) One switch enables supply to instrument (e.g. FGM +2.5VD) Supply switches have voltage and current monitors Supply will trip in an over current condition Tripped supplies can be reset on, or forced on by command Switches are controlled by Actel FPGA on PCB which responds to commands from the DCB.

Actel Issues Themis uses 11 RT54SX72S Actel FPGAs – 9 of these are in the IDPU. There are a number of issues with this family of Actel that have been well documented by GSFC and Actel – most notably ground bounce, antifuse programming failure and output transients or “burps”. To mitigate risk the following steps are being taken; Internal Review of FPGA VHDL/Schematic Designs amongst Themis FPGA engineers. Distribution of Actel design best practice document to engineers drawn from experience and documentation. External Review of board layout, best design practices by Actel. Use new programming algorithm for Silicon Sculptor. Power switches designed to turn on 2.5V before 5V. UCB in consultation with Actel and GSFC experts about current best design practices and solutions to issues.

DCB Board

BAU Interface Command Interface Telemetry Interface 38.4kbaud single line. IDPU receives synchronisation command once per second. Includes probe status segment and command segment. Telemetry Interface Low Speed Telemetry – 38.4kbaud single line. Sent once per second to BAU Includes State of Health packet, Memory Dump or FGM data High Speed Telemetry – 2Mbs, sent in CCSDS formatted packets. Flow of data is broken into fixed length frames.

High Speed TLM Interface High Speed Telemetry Interface Bit serial interface used to send full CCSDS telemetry frames from the IDPU to the spacecraft Bus Avionics Unit (BAU). Characteristics and Timing shown below  

Timing and Synchronisation Two service signals from the BAU 1PPS (1Hz) Sun Pulse Notes: 1. Minimum width 1ms

Inter Instrument Communication Communication Command & Data Interface (CDI) Developed and used by UCB for previous missions Two line interface, clock (8.38MHz) and data. Commands consist of 24 bits (8 address, 16 command data), a start bit, stop bit and parity bit. FGE data consists of 16 bits, and a start bit. DFB data and ETC data is 24 bits and a start bit, stop bit and parity bit.

IDPU Operational Modes SAFE POWER MODE is entered on reset (power-on), by ground command, or by command from the Probe power system in response to an undervoltage condition Power-on state, saves power and the contents of SRR IDPU Core Systems (LVPS, PCB, and DCB) are powered on All instrument sensors and associate electronics are powered off ENGINEERING MODE is entered by ground command in preparation for early operations (instrument health and safety diagnostics), special case instrument operations (boom deploy, high voltage turn-on), and maneuvers (FGM data for attitude determination) Early operation and maneuver state, provides additional specified data Higher engineering rate and additional telemetry points telemetered Operational only, typically during ground contact LOW POWER MODE is entered by ground command or by automated command by the BAU to the IDPU. Core systems and FGM (used for attitude control) are powered, all other instruments are off. On entering Low Power Mode, the IDPU will automatically power off active instruments (apart from FGM). NOMINAL MODE (Science) is entered by ground command (instruments are powered on one at a time) Normal operating state, full science data collection IDPU Core Systems, instrument sensors and assoc. electronics are powered on Booms are deployed

Flight Software Overview

Memory Resources PROM/EEPROM PROM Functions EEPROM/Uplink EEPROM Load Uplink Support L&EO Functions EEPROM/Uplink One-Time Events Test Programs Initialization Params Science Upgrades RESOURCE USAGE 86% PROM 34% RAM 42% EEPROM 36.5% CPU

Instrument Data Rates

Data Storage and Compression DCB contains 256Mb SDRAM for TM storage. This is sufficient space in memory for 4 day orbit + 1day contingency at a spin period of 2.7seconds. Data compression uses lossless Huffman and Delta Modulation algorithms. Entire memory can be compressed by a factor of 2 in less than 2 hours.

IDPU Grounding

Harness Diagram

IDPU Power IDPU within power budget and has 15% contingency Power Mode usage is Safe 5.9W Engineering and Low Power 6.66W Nominal 10.20W

IDPU Mass Mass margin is only 3% but current estimate is mature enough to be confident IDPU will remain within budget.

ICD Drawing

Mechanical Interface PEM SPACER WEDGE LOC ALUM SHIELD HEAT SINKS D-SUB CONNECTOR WEDGE LOC ATTACHED TO BOX WALL

Ground Support Equipment Each IDPU board will have it’s own GSE to check out boards individually. Once ready for integration, boards will be tested through the DCB with the IDPU GSE. This GSE will follow the IDPU through Instrument Suite and Probe I&T.

ETU Test Plans Functional Tests Interface Tests Test and debug performance against requirements Measure power and electrical interfaces Interface Tests Preliminary interface tests between IDPU boards on going for ETU (DCB to DFB complete). Once boards have completed tests with sensors (DAP, BEB, DFB, FGE) they will be integrated fully with IDPU Core boards (LVPS, PCB, DCB). Flexibility in board test order to help accelerate schedule – e.g. PCB can be integrated with LVPS or DCB first. Once all boards are integrated, all services and modes are checked out as a complete instrument. A subset of these tests will become an IDPU functional test to be run later during instrument I&T. IDPU will undergo 2 cycles of thermal vacuum. Completed IDPU ETU will run interface tests with BAU ETU as soon as possible.

FM Test Plans ETU will be used to test out procedures, practices and organisation for the FM. FM build up and I&T will mirror the ETU. Lessons learnt will be taken from ETU and applied to FM Flight Units will have >100 hour logged test time before delivery to probe integration.

Test Plans Software Development Dedicated DCB board used to develop and test FSW. Enables software development and board tests in tandem. Code will be verified on this test bed before programming of flight units. Software will be tested against software requirements document (THM_FSW_001). Software Acceptance test will be developed to test IDPU models during instrument build.

Assembled Test Flow Assembled IDPU Functional Test Metrology Interface Measurements Vibration with SCM pre-amp and ESA Thermal Vacuum (2 cycles) Bake Out Functional Test IDPU Ready

Safety & Contamination Frangibolts 28V Actuator power enabled before frangibolts are fired. Frangibolts will be fired for a minimum of 20 seconds. ESA HV ESA 28V powered for ESA HV to be enabled (FPGA). If ESA 28V power removed, ESA HV disabled (FPGA). ESA HV enable command requires 16bit code (FPGA). FSW will also make the above checks. Contamination IDPU will be cleaned prior to integration with ESA. A number of parts on the IDPU need to be depermed and tested prior to assembly (mostly mechanical). IDPU resides within probe, so not subject to ESC requriements.

Responses to RFAs RFA-INST-01F RFA-INST-02 List jc and dissipation of Mosfets in IDPU. Check heat sinking on assembly. Response: Listed all Mosfet jc and dissipation. All devices are well within derating guidelines and temperature rise above ambient in all cases is small (<10degrees). A post assembly inspection will be made of heat sinks on PCB. RFA-INST-02 Investigate effect of Actel RT54SX72S output transients on designs. Take appropriate action Response: Consulted with Richard Katz at GSFC. Awaiting his and Actel’s report. An assessment of impact on designs will be conducted during Actel design reviews (before FM layout).

Responses to RFAs RFA-INST-R13 RFA-INST-R15 Document jc of 3D+ SDRAM module used on DCB Response: jc = 250 C/W. The SDRAM 3D+ Module has a peak power consumption of 25mW. Increase in temperature will be 6.25C. RFA-INST-R15 Consider using high fidelity power input for IDPU testing Response: Where appropriate during IDPU testing, simulation of more flight like power supply will be used. An early test with BAU ETU is scheduled.

Schedule Project Milestones – IDPU Ready Dates IDPU ETU 8/12/04 IDPU F1 11/1/04 IDPU F2 11/9/04 IDPU F3 11/16/04 IDPU F4 11/23/04 IDPU F5 11/30/04 IDPU F6 12/7/04

Schedule