Queries raised by Director (Tariff) on ARR and Tariff Application of SLDC for FY 2011-12 on 11.02.2011.

Slides:



Advertisements
Similar presentations
Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW APRIL 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State___________.
Advertisements

1 A Presentation on ARR & Tariff Proposal of OPTCL for FY Analysis/Objections/Suggestions February 6, 2008 By Dr. Shibalal Meher (Consumer Counsel)
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
Queries raised by Director (Tariff) on ARR and Tariff Application of NESCO for FY on
Maharashtra State Load Despatch Centre Role of SLDC in RRF Implementation & Issues By MSLDC.
Queries raised by Director (Tariff) on ARR and Tariff Application of OHPC for FY on
Analysis of ARR & Tariff Proposal of SLDC Consumer Counsel.
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
Understanding Financial Management
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
1. 2 ENERGY MANAGEMENT SYSTEM AN OVERVIEW AN OVERVIEW.
Release of funds The FC Award for each year releases directly to the Finance Department of the respective States. The Finance Department in turn transfers.
Responsible and safer places where men have sex with men.… Everywhere A European Methodological Model of HIV Prevention in Men who have Sex with Men (MSM):
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
0 FY12 State Budget Discussion Policy and Fiscal Committee September 2010.
Presentation On Annual Action Plan for IWMP-HARYANA
The Australian Energy Regulator Public Forum NSW electricity distribution & transmission revenue proposals July 2014.
Queries raised by Director (Tariff) on ARR and BSP Application of GRIDCO for FY on
1 Analysis of OPTCL’s ARR and Transmission tariff for FY By: World Institute of Sustainable Energy, Pune (Consumer Counsel) 4 th February, 2011.
Analysis of ARR & Tariff Proposal of OHPC World Institute of Sustainable Energy Consumer Counsel.
Improving the world through engineeringwww.imeche.orgImproving the world through engineering Budget Update.
Queries raised by Director (Tariff) on ARR and Tariff Application of SLDC for FY on
Queries raised by Director (Tariff) on ARR and Tariff Application of OPTCL for FY on
Queries raised by Director (Tariff) on ARR and Tariff Application of WESCO for FY on
Queries raised by Director (Tariff) on ARR and Tariff Application of CESU for FY on
1 A Presentation on ARR & Tariff Proposal of SLDC for FY Analysis/Objections/Suggestions February 8, 2008 By Dr. Shibalal Meher (Consumer Counsel)
Queries raised by Director (Tariff) on ARR and Tariff Application of OPTCL for FY on
DEPARTMENT OF ENERGY PCE PRESENTATION ON THE DEPARTMENT’S 2012/13 ANNUAL FINANCIAL STATEMENTS Ms Yvonne Chetty Chief Financial Officer 1.
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
Presentation on Annual Action Plan for IWMP
The Texas Nodal Market Trip Doggett ERCOT Interim President and Chief Executive Officer Mike Cleary ERCOT Chief Technology Officer Executive Briefing 28.
OPEN ACCESS IN INTER STATE TRANSMISSION 29 TH MARCH TH MARCH 2004.
Queries raised by Director (Tariff) on ARR and BSP Application of GRIDCO for FY on
Fiscal Year-End Review Session Sponsored Projects Accounting
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
GOVERNMENT OF TELANGANA Irrigation & CAD Department
Faculty Additional Pay Processes and procedures
Lecture 1 Learning Objective
Proposals for State: ……..
ANNUAL ACTION PLAN INTEGRATED WATERSHED MANAGEMENT PROGRAMME
OF ESTABLISHED PERSONNEL
ARMA Board of Directors Meeting November 5, 2009 Washington, D. C
Health Savings Account (HSA) Funding & Invoicing
Scheduling of Collective Transactions Through Power Exchange
EU Implementation Programme
WELCOME ANNUAL ACTION PLAN For IWMP
OVERVIEW presentation THE NELSON MANDELA MUSEUM
Health Savings Account (HSA) Funding & Invoicing
City:- Corporation of City of Panaji
Budget Planning & Training
Queries raised by Director (Tariff) on ARR and Tariff Application of CESU for FY on
Update on European Network Codes
Fiscal Year-End Review Session Sponsored Projects Accounting
Student Activity Training FY16-17
Accounting Services Updates
Queries raised by Director (Tariff) on ARR and Tariff Application of OHPC for FY on
Queries raised by Director (Tariff) on ARR and Tariff Application of NESCO for FY on
PAB-MDM Meeting-National Informatics Centre (NIC)
PAB Meeting on National Portal for Mid Day Meal Scheme
portfolio committee on ON the Independent development trust
Enduring NTS Exit Capacity Arrangements - Update
“All About Me” Staff Development Day
Presentation to the Portfolio Committee on NCC
Mod 09_19 - Removal of locational constraints from Imbalance Pricing
Comparision of No. of Accidents in BESCOM
Reports Welcome to the Finance video on reporting.
Queries raised by Director (Tariff) on ARR and Tariff Application of SOUTHCO for FY on
Financial Reporting System
Presentation transcript:

Queries raised by Director (Tariff) on ARR and Tariff Application of SLDC for FY 2011-12 on 11.02.2011

. Establishment of Energy Accounting & Settlement System Centre (EASSC): As per the Road Map of the Commission, EASSC was to function by 31.8.2007. In spite of specific allocation for EASSC in ARR of OPTCL, EASSC is yet to function. As a result monthly State Energy Account, Weekly UI Account & Weekly Reactive Energy Account etc are not issued by SLDC to all the stakeholders as per Orissa Grid Code & OERC Intra-State ABT Regulation, 2008 etc. OPTCL is, therefore, advised to indicate the Road Map of Trial Run/Commercial Operation of EASSC of SLDC so that SLDC can really play the role of Nodal Agency during Intra-State ABT/ Open Access Regime.

Transfer of Sub-LDCs to the Control of SLDC: The Commission had directed OPTCL to transfer all assets of Sub-LDCs at Bhubaneswar, Meramundali, Jayanagar & Budhipadar to SLDC immediately. OPTCL may indicate the exact time line to handover these assets of SLDC and that of Sub-LDCs at Bhubaneswar, Meramundali, Jayanagar & Budhipadar to SLDC.

Appointment of Chief Load Dispatcher & other Executives in SLDC: The Commission had directed OPTCL to ensure that SLDC should be headed by a Chief Load Dispatcher in the rank of Director and should have three distinct wings of Grid Operation, Commercial and Telecommunication with other support services in the pattern of Executives and Staff deployed in ERLDC (81 Nos.) which should be in place within 4 months i.e. by 20th July, 2009. OPTCL should indicate the exact time line of appointment of a Director as Chief Load Despatcher of SLDC and should also submit before the Commission the tentative time frame when 81 nos. of posts approved by the Commission for SLDC will be filled up.

SLDC Website: The Commission had directed SLDC to have its own Website within 20th May, 2009 and to submit the status of its own Website for display of all Data as per CERC/OERC Regulations for the information of all stakeholders. In reply to the Commission’s Query, SLDC submitted that SLDC website has already been created and is in place. The Weekly/Monthly/Annual System Performance Reports are being displayed in the web site. Daily Grid Report is also being displayed in the Website. Other Reports/ Data as per CERC/OERC Regulation will be displayed in the website from 1st April’2010 onwards. As SLDC Website could not display 15-minute schedule/drawal data of 4 DISCOMs, OERC made an adhoc arrangement and 15-minute schedule/drawal data were made available in OERC Website since 1st November, 2009 which enabled the DISCOMs to perform Mock Exercise of Intra-State ABT (Phase-I) since that date till now.All the stakeholders have suggested in last G.C.C Meeting that all data relating to generation, scheduling and drawal by different stake holders in 15-minute mode should be displayed in SLDC website. OPTCL/SLDC should indicate the time line of full functioning of SLDC website as required under CERC/OERC Regulations.

Proposed CAPEX of Rs. 2.94 Cr. in FY 2011-12: OPTCL has proposed a CAPEX of Rs.2.945 Cr. in the ARR of Rs.11.70 Cr. for FY 2011-12. Out of the CAPEX of Rs.5.87Cr. approved for FY 2010-11, OPTCL has incurred a CAPEX of Rs.68.68 lakhs only in FY 2010-11 (April to November, 2010) which shows that OPTCL may not be able to spend the entire CAPEX of Rs.5.87 Cr. allowed for FY 2010-11. OPTCL may indicate the CAPEX incurred upto 31st January, 2011 and the action plan to spend the balance of CAPEX approved for FY 2010-11 so as to justify their further proposal of CAPEX of Rs.2.945 Cr. for FY 2011-12.

Monthly Cash Flow during FY 2010-11: The Commission had approved Rs.7.76 Cr. as ARR for FY 2010-11 and OPTCL had spent an amount of Rs.4.55 Cr. during the period from April to November, 2010. OPTCL may submit the expenses upto end of January, 2011 out of ARR approved for FY 2010-11. Month-wise cash flow for the FY 2010-11 (actuals upto January, 2011) may be submitted.