Single Site Acceptance Report for TIGO UMTS Project Phase II

Slides:



Advertisements
Similar presentations
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Post Launch Tuning Cingular UMTS.
Advertisements

El Salvador Service-Immersion Trip March 9-18, 2012.
Final Year Project Presentation FYP 08 Arsalan Tariq Mir Saad Najeeb Syed Ammar Faheem.
Cell id GVHD : Hà Duyên Trung Sv thực hiện :Lương Kim Doanh Trần Hoàng Điệp Nguyễn Trung Thành Ngô Quang Thìn.
1/03/09 De 89 à 98. 1/03/09 De 89 à 98 1/03/09 De 89 à 98.
Radio Network Tuning and Optimization for Universal
CDR Analysis & Investigation Basic Course - Presentation
Numbers
1 HSDPA Overview By: Syed Asif Hussain Shah Mohammad Reza Akhavan 10th March, 2005 Networking Project.
Phase Difference = Phase Difference = 0.05.
UMTS Radio Network Planning Andreas Eisenblätter Thorsten Koch (ZIB) Alexander Martin (TU Darmstadt)
Capacity and Load Sharing in Dual-Mode Mobile Networks
Interview and drive test tips
© Omnitele Ltd UMTS Quality of Service enabling new mobile applications CANTO St. Kitts & Nevis, 19 th – 22 nd June 2005 Heidi Lagerström,
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Using TEMS Investigation.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Cingular UMTS Phase II Markets Pre-Launch RF Activities.
MohammaD AL-Khuffash, Rasool Bani Matar, Raja’y Kelany GSM Network Planning For Nablus City ( Third Phase ) Submitted to: Dr.Jamal Kharosha.
Landmark Medical Center IB T-Mobile Benchmark Dec, 2012.
06/09/2005Master's Thesis Seminar - Jesse Kruus 1 Analyzing and Developing Base Load for WCDMA Base Station Automated Testing System Thesis written at.
Data collection empowered by iMeasure. Contents The scope of this survey is to Benchmark the existing coverage for all major carriers. This following.
Data collection empowered by iMeasure. Contents The scope of this survey is to Benchmark the existing coverage for all major carriers. This following.
Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets.
Business Id © NetHawk All rights reserved. Confidential April 2005NetHawk NetHawk Quality of Service products Markus Ahokangas, MSc Product.
Test 1: Co-channel interference at the mobile unit
Slide title In CAPITALS 50 pt Slide subtitle 32 pt POST LAUNCH TUNING.
Section 6 Wideband CDMA Radio Network Planning. Radio Network Planning A radio network planning consists of three phases: 1.Network Dimensioning (using.
Analyze Assure Accelerate TM HSDPA Roadmap. Analyze Assure Accelerate TM SR3420 WCDMA Network Emulator SR3420 is a new WCDMA network emulator platform.
Rev PA1 WCDMA RAN PM - Supplemental Information 3/3/20051 WCDMA RAN PM Supplemental Information.
Maximum Value.
2G Vs 3G Drive TEST with tems
親愛的吉姆舅舅: 今天吃完晚餐後,奶奶說,在家 裡情況變好以前,您要我搬到城裡跟 您住。奶奶有沒有跟您說,爸爸已經 好久沒有工作,也好久沒有人請媽媽 做衣服了? 我們聽完都哭了,連爸爸也哭了, 但是媽媽說了一個故事讓我們又笑了。 她說:您們小的時候,她曾經被您追 得爬到樹上去,真的嗎? 雖然我個子小,但是我很強壯,
STI Proprietary1 St. Louis, MO September 21 st, 2004 AmpLink Rx 1900e GSM Field Trial.
10-1 人生与责任 淮安工业园区实验学校 连芳芳 “ 自我介绍 ” “ 自我介绍 ” 儿童时期的我.
。 33 投资环境 3 开阔视野 提升竞争力 。 3 嘉峪关市概况 。 3 。 3 嘉峪关是一座新兴的工业旅游城市,因关得名,因企设市,是长城文化与丝路文化交 汇点,是全国唯一一座以长城关隘命名的城市。嘉峪关关城位于祁连山、黑山之间。 1965 年建市,下辖雄关区、镜铁区、长城区, 全市总面积 2935.
Introduction to GENEX Probe
Celcom Golden cluster Post Drive test peak result
Nominal Plan For PC_SBE_05
Nominal Plan For PC_SBE_10
Project hammer T00278 LTE DT Analysis Celcom CA Project
REPORT_DT_JABAR_VIP Jl
What is Actix Spotlight ?
Project CA project T00087 oss KPI justification - Appendix CA Project
Site Audit Scenario & Antenna Adjustment
Hammer Project Celcom CA SSO Project
Hammer Project KV020 S-KPI CBO
Project hammer Cluster C00200 CA - SSO Celcom CA Project
Site Audit Scenario & Antenna Adjustment
Site Audit Scenario & Antenna Adjustment
Site Audit Scenario & Antenna Adjustment
Site Audit Scenario & Antenna Adjustment
UMTS Call Drop Analysis
Celcom LTE CA Project_OSS
Site Audit Scenario & Antenna Adjustment
Site Audit Scenario & Antenna Adjustment
4G_CA project_OSS Justification
Drive Testing Basics 2013 March
Hammer Project Celcom CA SSO Project
Project hammer PC_CA_SWE_07 CA Celcom CA Project
Project hammer PC_CA_ERE_06 LTE DT ANALYSIS Celcom CA Project
Yahoo Mail Customer Support Number
TECHjOSH.COM TechJosh.com.
Most Effective Techniques to Park your Manual Transmission Car
How do Power Car Windows Ensure Occupants Safety
THANK YOU!.
Thank you.
Thank you.
Optimisation of Softer Handover in UMTS Network
Landmark Medical Center
Presentation transcript:

Single Site Acceptance Report for TIGO UMTS Project Phase II NodeB: VALLA MONTES DE SAN BARTOLO 3GVMSB PSC: 180, 181, 182 Date: 19 - OCTUBRE - 2010 Huawei El Salvador

Contents 1 RSCP Before/After (CS and PS) 2 Ec/Io Before/After (CS and PS) 3 Best Server in Active Set Before/ After 4 RSCP per PSC 5 CS Active Set and Monitor Set Before/After 6 CS SHO - PS HHO Before/After 7 Statistical Data (Accesibility & Retainability) Before/After 8 HSDPA Parameter 9 Data of Design of the New Site

CS RSCP – 3GVMSB Before

CS RSCP – 3VMSB After

PS RSCP – 3GVMSB Before

PS RSCP – 3GVMSB After

Contents 1 RSCP Before/After (CS and PS) 2 Ec/Io Before/After (CS and PS) 3 Best Server in Active Set Before/ After 4 RSCP per PSC 5 CS Active Set and Monitor Set Before/After 6 CS SHO - PS HHO Before/After 7 Statistical Data (Accesibility & Retainability) Before/After 8 HSDPA Parameter 9 Data of Design of the New Site

CS Ec/Io – 3GVMSB Before

CS Ec/Io – 3GVMSB After

PS Ec/Io – 3GVMSB Before

PS Ec/Io – 3GVMSB After

Contents 1 RSCP Before/After (CS and PS) 2 Ec/Io Before/After (CS and PS) 3 Best Server in Active Set Before/ After 4 RSCP per PSC 5 CS Active Set and Monitor Set Before/After 6 CS SHO - PS HHO Before/After 7 Statistical Data (Accesibility & Retainability) Before/After 8 HSDPA Parameter 9 Data of Design of the New Site

3GVMSB Best SC in Active Set Before

3GVMSB Best SC in Active Set After

Contents 1 RSCP Before/After (CS and PS) 2 Ec/Io Before/After (CS and PS) 3 Best Server in Active Set Before/ After 4 RSCP per PSC 5 CS Active Set and Monitor Set Before/After 6 CS SHO - PS HHO Before/After 7 Statistical Data (Accesibility & Retainability) Before/After 8 HSDPA Parameter 9 Data of Design of the New Site

3GVMSB RSCP Sector A, B and C

3GVMSB SC 180 RSCP Sector A

3GVMSB SC 181 RSCP Sector B

3GVMSB SC 182 RSCP Sector C

Contents 1 RSCP Before/After (CS and PS) 2 Ec/Io Before/After (CS and PS) 3 Best Server in Active Set Before/ After 4 RSCP per PSC 5 CS Active Set and Monitor Set After 6 CS SHO - PS HHO Before/After 7 Statistical Data (Accesibility & Retainability) Before/After 8 HSDPA Parameter 9 Data of Design of the New Site

CS Active Set After

CS Monitor Set After

Contents 1 RSCP Before/After (CS and PS) 2 Ec/Io Before/After (CS and PS) 3 Best Server in Active Set Before/ After 4 RSCP per PSC 5 CS Active Set and Monitor Set Before/After 6 CS SHO - PS HHO Before/After 7 Statistical Data (Accesibility & Retainability) Before/After 8 HSDPA Parameter 9 Data of Design of the New Site

Intra Frequency Handover

3GVMSB CS SHO Before

3GVMSB CS SHO After

3GVMSB PS HHO Before

3GVMSB PS HHO After

Contents 1 RSCP Before/After (CS and PS) 2 Ec/Io Before/After (CS and PS) 3 Best Server in Active Set Before/ After 4 RSCP per PSC 5 CS Active Set and Monitor Set Before/After 6 CS SHO - PS HHO Before/After 7 Statistical Data (Accessibility, Retainability & Static) After 8 HSDPA Parameter 9 Data of Design of the New Site

Accesibility Statistics

Retainability

Static Test Per Sector (Video Call) Sector A

Static Test Per Sector (R99) Sector A

Static Test Per Sector (Video Call) Sector B

Static Test Per Sector (R99) Sector B

Static Test Per Sector (Video Call ) Sector C

Static Test Per Sector (R99) Sector C

3GVMSB RSCP Histogram Before

3GVMSB RSCP Histogram After

3GVMSB Ec/Io Histogram Before

3GVMSB Ec/Io Histogram After

Contents 1 RSCP Before/After (CS and PS) 2 Ec/Io Before/After (CS and PS) 3 Best Server in Active Set Before/ After 4 RSCP per PSC 5 CS Active Set and Monitor Set Before/After 6 CS SHO - PS HHO Before/After 7 Statistical Data (Accesibility & Retainability) Before/After 8 HSDPA Parameter 9 Data of Design of the New Site

HSDPA Delta Served Rate (kbps) Before/After 8.1

3GVMSB HSDPA Delta Served Rate Before

3GVMSB HSDPA Delta Served Rate After

HSDPA HS-DPCCH CQI Before/After 8.2

3GVMSB HS-DPCCH CQI Before

3GVMSB HS-DPCCH CQI After

Contents 1 RSCP Before/After (CS and PS) 2 Ec/Io Before/After (CS and PS) 3 Best Server in Active Set Before/ After 4 RSCP per PSC 5 CS Active Set and Monitor Set Before/After 6 CS SHO - PS HHO Before/After 7 Statistical Data (Accesibility & Retainability) Before/After 8 HSDPA Parameter 9 Data of Design of the New Site

Data of Design of 3GVMSB NODEB NAME NODEB ID CELL ID NEW SITE PSC Azinuth M-Tilt E-Tilt Tower height (m) Antenna Type 3GVMSB 5178 51781 VALLA MONTES DE SAN BARTOLO 180 90 6 18 DBXLH-6565A-VTM 51782 181 220 11 51783 182 345 8

Thank You Thank You Thank You www.huawei.com www.huawei.com