S.Movchan Straw manufacturing and QC

Slides:



Advertisements
Similar presentations
Lothar Naumann Institut für Strahlenphysik Abteilung Hadronenphysik Mitglied der Leibniz-Gemeinschaft MuCH Straw Tube Tracker - Motivations.
Advertisements

The Lightweight Straw Tube Tracker for PANDA Detector at GSI Andrey Sokolov *,1, James Ritman 1, Peter Wintz 1, Paola Gianotti 2, Dario Orecchini 2 1 Institut.
A) 80 b) 53 c) 13 d) x 2 = : 10 = 3, x 3 = 309.
Construction and quality control of the end-cap Transition Radiation Tracker for the ATLAS experiment Vasiliki A. Mitsou CERN HEP 2003, April, Athens,
18-Sep-15S.Movchan Straw manufacturing and QC1 Remove metallization from tape by laser. Part 2 laser mode optimization for Hostaphane RNK 2600 samples.
N. Dixon PH / DT Vladimir Elsha JINR Straw working group meeting Monday 6th february 2011 CERN1 Straw Material and development.
CMS Week, CERN, Mar Mar 2004CMS Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università di.
16-Oct-15S.Movchan Straw manufacturing and QC1 Straw machine status polished anvil new welding configuration software for on-line seam quality control.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
Chi-Square Test.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
Status of straw-tube tracker V.Peshekhonov, D.Peshekhonov, A.Zinchenko JINR, Dubna V.Tikhomirov P.N.Lebedev Physics Institute, Moscow Presented on the.
Module 23: Proportions: Confidence Intervals and Hypothesis Tests, Two Samples This module examines confidence intervals and hypothesis test for.
A.Ayriyan 1, V.Ivanov 1, S.Lebedev 1,2, G.Ososkov 1 in collaboration with N.Chernov 3 1 st CBM Collaboration Meeting, JINR Duba,19-22 May JINR-LIT,
20-Nov-15S.Movchan Straw manufacturing and QC1 Straw machine status straw fabrication option 1: removing metallization from tape edges by laser study straw.
8 July 1999A. Peisert, N. Zamiatin1 Silicon Detectors Status Anna Peisert, Cern Nikolai Zamiatin, JINR Plan Design R&D results Specifications Status of.
Pump design Raimonds Nikoluskins CERN – LIEBE project coordination meeting.
Qualification of the longitudinal weld of thin wall PET tubes of the straw tracker of the NA62 experiment Master thesis presented 28 th of june 2011 by:
Neil Dixon PH/DT CERN 22/03/10 Straw Material Plans Latest news. Latest news. Many tests ongoing at CERN and in JINR in and attempt to validate in and.
Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 17 July 2012 LAV construction & installation status.
Straw manufacturing current status T.Enik, S.Shkarovskiy, I.Polenkevich,Yu.Potrebenikov
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
N. Dixon PH / DT CERN 12 July Straw Material, weld line latest news and plans.
Introduction Straw Working group meeting CERN group 1 NA62 Collaboration meeting, Brussels 7-10/9/2010.
The Scientific Method:
A course is designed to increase mathematical comprehension. In order to evaluate the effectiveness of the course, students are given a test before and.
Straw manufacturing current status T.Enic, Yu.Potrebenikov
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
N. Dixon PH / DT Straw working group meeting Monday 14 December 2010 CERN1 Straw Material and development.
13-jan-2014 Some results for a GEM-based central detector A.Zinchenko, V.Vasendina, M.Kapishin VBLHEP, JINR, Dubna, Russia.
DB Current Status Polenkevich Irina. The general requirements on DB Access through the Internet; DB backup to do automatically (once per week);
Tests of Significance: The Basics ESS chapter 15 © 2013 W.H. Freeman and Company.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
28-Feb-16S.Movchan Straw manufacturing and QC1 Straw machine status straw welding machine QC by microscope control by computer straw welding speed optimization:
Module 25: Confidence Intervals and Hypothesis Tests for Variances for One Sample This module discusses confidence intervals and hypothesis tests.
8-Mar-16S.Movchan Straw manufacturing and QC1 Straw machine status 01_09_2010 machine alignment check by laser level control device machine set up after.
8-Mar-16S.Movchan Straw manufacturing and QC1 Straw machine status anvil new welding configuration software for on-line seam quality control conclusion.
Presented by: De Carlo Livio Supervisor: Scheubel Maud Section: EN/MME-MM.
Neil Dixon PH/DT Dubna July 1010 Straw Material latest news and plans 1.
Closeout. Sharing 2010 Straw production – Material study: CERN – Procurement (CERN) – Straw production: Dubna Electronics (CERN) Simulations, analysis.
10-Jun-16S.Movchan Straw manufacturing and QC1 Straw manufacturing conditions and QC tape and straw parameters specification conditions of straw production.
FEE for Muon System (Range System) Status & Plans G.Alexeev on behalf of Dubna group Turin, 16 June, 2009.
N. Dixon PH / DT Vladimir Elsha JINR Straw working group meeting Monday 6th April 2011 CERN1 Straw Material and development.
The reading is 7.38 mm. The reading is 7.72 mm.
NA 62 – straw detector Content Detector Specifications Chamber design Straw design and specifications Calculations and measurements Prototyping Plans Straw.
The Status of the CBM Experiment
Status of the forward tracker design
The drift chamber with a new type of straws for operation in vacuum
S.Movchan Straw manufacturing and QC
Arithmetic and Geometric Means
S.Movchan Straw manufacturing and QC
S.Movchan Straw manufacturing and QC
Quality Control in Straw Production
Dubna/JINR Status & Plans
Hypothesis Test for Independent Groups Two Means
Simulation of 200 MHz RF cavities. 11 cells preliminary results
S.Movchan Straw manufacturing and QC
Status of straw production straw module assembling
Confidence Intervals and Hypothesis Tests for Variances for One Sample
Status of the PANDA Magnet
Module Production and Testing at Duke
MATH 2311 Section 8.2.
Chi-Square Test.
STAR TOF MRPC Mass Production & Q.C. (USTC)
Chi-Square Test.
Width vs. Area for Sample Squares
Wire Diameter Variation
Project Presentations August 5th, 2004
Chi-Square Test.
Presentation transcript:

S.Movchan Straw manufacturing and QC Dubna straw status (21/05/2012) straw parameters measurement results conclusion Presented by S.Movchan 12-Jun-18 S.Movchan Straw manufacturing and QC 1

842 straws for Dubna Module #3 Tapes number Straw tubes 02-09 34 05-14 103 05-16 104 05-18 95 04-06 99 04-04 78 04-02 96 04-12 04-08 100 04-10 842 Last straw # - 1972 12-Jun-18 S.Movchan Straw manufacturing and QC 2

Straw diameter va straw number For last 1015 straws (#861 ÷ #1875) Straw start - Blue Straw end - Red Requirement: 9.75 ≤ Din ≤ 9.80 mm Rejected – 30 pc 12-Jun-18 S.Movchan Straw manufacturing and QC 3

Test sample (o-ring 5 mm): elongation vs straw number For last 1015 straws (#861 ÷ #1875) Requirement: dL ≥ 1.0 mm Rejected – 51 pc 12-Jun-18 S.Movchan Straw manufacturing and QC 4

Test sample (o-ring 5 mm): F vs straw number For last 1015 straws (#861 ÷ #1875) Requirement: F ≥ 3.7 kg Rejected – 32 pc 12-Jun-18 S.Movchan Straw manufacturing and QC 5

S.Movchan Straw manufacturing and QC Straw resistance For last 1015 straws (#861 ÷ #1875) Requirement: R ≤ 75 Ohm Rejected – 0 12-Jun-18 S.Movchan Straw manufacturing and QC 6

Sonotrode track width vs straw number For last 1015 straws (#861 ÷ #1875) Requirement: (0.4 ≤ W ≤ 1.0) mm Rejected – 1 12-Jun-18 S.Movchan Straw manufacturing and QC 7

Statistic for last 1015 straws (#861 ÷ #1875) Straw rejection results: 1. Straw parameter out of specification: - out of D ~ 3 % ( 30 straws) - dL < 1 mm & dF < 3.7 kG ~ 7 % ( 70 straws) - out of R 0 - out of W ~ 0.1 %( 1 straws) Total: ~ 10 % (101 straws) 2. Scratches on straw cathode ~ 2 % (17 straws) Sub total: ~ 12 % (118 straws) 3. Straw overpressure long term test 2 straws out from 352 pc 12-Jun-18 S.Movchan Straw manufacturing and QC 8

DB NA62 straw label: NA62TASTDU003525 NA62 – NA62 experiment TA or TR – Tracker ST - straw DU–Dubna, JINR, Russia CE – CERN (Sefar, Swiss) 003525 – straw serial # (000001-999999) 12-Jun-18 S.Movchan Straw manufacturing and QC 9

Storage of 574 straws for Dubna Module #3 1-st measurement: 132 straws After 3-d measurement: 354 straws 2-nd measurement: 88 straws Total: 574 straws 12-Jun-18 S.Movchan Straw manufacturing and QC 10

S.Movchan Straw manufacturing and QC Conclusion Dubna 1972 straws were manufactured: ~ 20 straws/shift ~ 100 straws per spool L=300 m (straw L=2.5 m) ~ 12% straws are rejected Straws for Dubna Module #3: - manufactured – 842 straws: - storage 574 straws (long term test) - end plug glued 180 straws 12-Jun-18 S.Movchan Straw manufacturing and QC 11

S.Movchan Straw manufacturing and QC 12-Jun-18 S.Movchan Straw manufacturing and QC 12