OSIRIS FDM Failure investigation summary

Slides:



Advertisements
Similar presentations
IT-Forensic Investigations (in Sweden) Computers Sebastian Leclerc
Advertisements

ECE 4411 Dynamic Braking of Induction Motors Slow down a machine by converting kinetic energy stored in the rotating mass to heat energy in the rotor and/or.
MPE, 4th of May 2006 Page 1 XMM-Newton Status of EPICs Operations Stéphane RIVES 4th of May 2006.
Automated Colored Balls Sorter Presented By : Mihir Daftari Ka Fai Ng Woo Jin Park.
Managing Reuse Presented by: Aisha Al-Hammadi. Outline Introduction History. The technical and managerial advantages of Reusing Solutions. The main challenges.
Root Cause Analysis: Why? Why? Why?
ET 332a Dc Motors, Generators and Energy Conversion Devices 1Lesson a.pptx.
Onboard Data Processing Units
Corolla Electric Power Steering PE June, 2010.
Guidance Notes on the Investigation of Marine Incidents
Analyze Opportunity Part 1
1 Commissioned by PAMSA and German Technical Co-Operation National Certificate in Paper & Pulp Manufacturing NQF Level 2 Describe bearing types, designs.
IT Essentials: PC Hardware and Software v4.0. Chapter 4 Objectives 4.1 Explain the purpose of preventive maintenance 4.2 Identify the steps of the troubleshooting.
Why AlgaRisk08? Andrew Wither – Principal Marine Scientist.
Detector Status J. Brunner 12/09/2014. Highlights Line 3 Optical Margins Line 5 UPS Situation Data Taking Status Planned Operations.
Assurance service/engagement
Representative photo of the case Group name Group participants (without student number) [date]
1. What do you understand by software engineering? Discuss the role of engineering software development. 2. What do you understand by software requirement.
INTEGER NUMBERS DATE: JANUARY 30TH – FEBRUARY 7TH TEACHER: Miss Osiris Rincón SUBJECT / GRADE: MATH / SEVENTH GRADE GOAL: IDENTIFIES THE PROPERTIES OF.
There are two parts to stopping distance: Thinking distance Braking distance Both of these can be increased by different factors. Explain in detail how.
Standard Deviation A Measure of Variation in a set of Data.
PACS SVR22/23 June 2006 Warm Electronics1 Warm Electronics: Components/Subsystems Test Results B. Voss PACS SVR.
Geant4 release 5.1 summary Gabriele Cosmo EP/SFT.
1 Diversity of Life How are living things grouped? Classification Introduction 7.
PACS IHDR 12/13 Nov 2003 Digital Processing Unit1/15 DPU PRESENTATION R.Orfei & S. Pezzuto CNR- IFSI.
Obstacle Detection. In the previous program the robot moves forward and then checks for something in the way. As we observed it only checks for things.
Failure Modes and Effects Analysis (FMEA)
SPECIAL FUNCTIONS ON ASDA-A2. To Audience Advance level This slide will teach some special functions on ASDA-A2. For better understanding the content,
HIGH QUALITY LOW- LOSS LOW-COST DC MOTOR TORQUE CONTROLLER JOSE PEDRO GARCERAN SANCHEZ BYEONG CHAN PARK NUMBER 48.
OSIRIS Solar System Simulator
OSIRIS operation summary
Instructor Materials Chapter 8: Network Troubleshooting
SOFTWARE TESTING Date: 29-Dec-2016 By: Ram Karthick.
Max-Planck-Institut für Sonnensystemforschung
Mechanism requirements: 0
OSIRIS Full Team Meeting Welcome, Introduction, Logistics
OSIRIS Calibration Report (Lab Calibration)
Post-Operation Status: Archiving, Calibration & Science
Critical Systems Specification
OSIRIS Science Team Meeting Agay 15. – 17. November 2005
Rosetta Science Ground Segment Overview
Pro-Active Transaction Resolution Measures
OSIRIS Horst Uwe Keller and the OSIRIS Team
Tower 8 – X6 anomaly MRB Meeting – 24 August 2005.
Summary of the science planned per mission phase
OSIRIS operation summary
Detlef Koschny Research and Scientific Support Department ESA/ESTEC
OMI OPERATIONS OVERVIEW
TRADING STOCK PAGE 295 NAME, TEACHER AND DATE.
Annual Report of the DWP Experiment 9th CAA Operations Review
SPEED CONTROL OF INDUCTION MOTOR IN SUGAR PLANT
Status of Magnet Setup Cycling for LHC
Wind turbine technology
Working of Script integrated with SiteScope
Trouble Shooting Brian Nettleton
Nature of Technology.
CUSat High Altitude Test (CHAT) Mission Briefing
General Grants Program Process
Insert subhead here Project Status.
Program Status (Chart 1)
Unit 3 8th grade Electric Motor Project
Root Cause Analysis: Why? Why? Why?
Full Title of Research Proposal
HP ALM – General Navigation
Chapter # 4 Development and Quality Plans
Name(s): Date: Block:.
Obstacle Detection.
Implement Spanning Tree Protocols
5 Why Process/Guidelines
Always adhere to Red/No Go zones
Presentation transcript:

OSIRIS FDM Failure investigation summary P. Kerhousse, ESA/ESTEC (TEC-MMM) February 2004

Failure investigation summary Contents Failure description Root causes tree Failure analysis Open issues Identified risks Recommendations Issue date: 25th February 2005 Failure investigation summary

Failure investigation summary Failure description (1/2) What is the failure observed? Failure identification: Unexpected number of motor steps needed by the FDM mechanism to reach both the Open and Close positions given by the associated Open and Close micro-switches status. Observables: Number of steps commanded Switches status Camera pictures Model: ROSETTA-OSIRIS FDM NAC FM in orbit (20th January 2005) Issue date: 25th February 2005 Failure investigation summary

Failure investigation summary Failure description (2/2) Is it the first failure occurrence? Similar failures occurrence history: WAC FDM QM during life testing ->Not treated as NCR/ MRB WAC FDM FM during system acceptance testing Only 1 g effect considered as possible root cause (jamming condition) -> Manual assistance during closing NAC FDM FM during system acceptance testing Only 1g effect considered as root cause (jamming condition) ROSETTA Satellite in-orbit commissioning (5th Sept 2004) Software switch search logic considered as root cause -> Change of FDM software Issue date: 25th February 2005 Failure investigation summary

Failure investigation summary Root causes tree (1/2) What can explain the failure observed? (A) Motor steps commands missed (1) MCB failure (2) DC/DC converter failure (3) Low level S/W failure (4) High level S/W failure (5) Harness failure (B) Motor steps loss (1) Motor failure (2) Increase of resistive torque (3) Dynamic coupling (4) End stop reached Issue date: 25th February 2005 Failure investigation summary

Failure investigation summary Root causes tree (2/2) What can explain the failure observed? (C) Wrong switch status (1) MCB failure (2) Switch failure (3) Switch fixation failure (4) Harness failure (D) Mechanical position inaccuracy (1) Mechanism backlash (2) Switches reproducibility (3) External torque variations Issue date: 25th February 2005 Failure investigation summary

Failure investigation summary Failure analysis (1/2) Issue date: 25th February 2005 Failure investigation summary

Failure investigation summary Failure analysis (2/2) Issue date: 25th February 2005 Failure investigation summary

Failure investigation summary Open issues (1/2) End stop not reached: How to explain? Open switch release is located above the activation activation and release are sliding in the Open direction Close switch activation is sliding in the Close direction Release is sliding in the Open direction The Open to Close switches distance is increasing (more pronounced on activation than on release) Issue date: 25th February 2005 Failure investigation summary

Failure investigation summary Open issues (2/2) End stop reached: How to explain? Open switch activation and release are slightly sliding in the Open direction Close switch activation is sliding in the Close direction Release position is stable The Open to Close switches distance is increasing (by far more pronounced on activation than on release) Issue date: 25th February 2005 Failure investigation summary