LHC-EYETS 2016/17 Coordination meeting #18

Slides:



Advertisements
Similar presentations
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
Advertisements

ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx.
7/23/ J.Coupard. 1) Cryogenic risks 2) Cryogenic phases from RT/floating to nominal and additional safety rules A. Sectors warmed-up to RT or considered.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
EN-CV interventions during YETS
R2E relocation & shielding activities Anne Laure Perrot EN/MEF- LE R2E project meeting, 23 rd October 2012.
LHC-YETS Coordination meeting #9 24 th November, 2015.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
Overview of the LHC Year End Technical Stop
LHC progress Tuesday 28 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 30/08/2013LSC - S. Baird, M. Bernardini1.
Activities related to BE-BI during LHC-YETS 7 th December, 2015 Maria Barberan, Marzia Bernardini.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
Proposal for rerouting of buried electrical networks and optical fibres at Point 1 LS2 Committee meeting S. Bertolasi on behalf on EN/EL WP17.2 HL-LHC.
LHC schedule status K. Foraz EN-MEF 12/04/2013LSC - K. Foraz1.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Electrial Safety LS2 days November 2016 AP
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
YETS & LS2 Works EN-EL / Power distribution
ALICE 5 o’clock meeting Wk 51.
Linac4-PSB 160 MeV connection readiness review
ABT-EC EYETS Activities 2nd reports
LIU – EVM status and next steps
Framework Schedule from EYETS 2016 to LS2
SPS LS1 Planning meeting (N019) 04/09/13
Update on the Critical Path of the PS Booster Schedule for the EYETS
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
EYETS Works EN-EL [ FC excluded ]
YETS & LS2 Works EN-El on LHC / Power distribution
EYETS David Hay EN-OSS.
BA6 – crab cavity activities in EYETS
Status of LHC installation & New Installation Schedule
EYETS LHC 2016/2017 Works EN/EL/CF
Injector De-cabling Project
Activités SPS pour BE/ICS Systèmes d’Alarmes YETS
SPS - EYETS 2016/17 Vacuum systems planning
SHORT LHC-TS Coordination meeting #1
Helium spill in LHC tunnel
LIU–PLI report LIU SPS meeting.
YETS & LS2 Reminder G. Girardot 20 juin 2017.
De-cabling strategy during YETS
LHC-TS3 Coordination meeting #3
Keeping LHC cold during LS periods Preliminary proposal
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
CRG activities for EYETS 2016
NA CONSOLIDATION & SAFETY SYSTEMS
SPS activities during LS2 TE-EPC (Power Converter Group)
Short LHC-TS week 38 Confirmed by LMC on 16th August
Cryogenic Risk Assessment in LHC
GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) Olivier Barrière.
YETS PS + PS SWY + TT2 Facility Coordinator:
LHCb & EYETS
YETS & LS2 Works EN-EL / Power distribution
Overview & baseline of LS2 and roadmap for CRG
East Hall under construction
EYETS septa status Septa activities TE/ABT Thierry Masson
K. Foraz on behalf of OSS members
GIS Portal Racks Project
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
Power cut 18kV cable for EMD404/E9 is heating
BLM planning 24/02/2014.
BLM planning 03/03/2014.
LS1 status 17/03/2014.
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 06/03/2019.
BLM planning 03/02/2014.
SPS 2, 3, 4 and 6 during W D.MCFARLANE EN-ACE-OSS 12/06/2019.
LHC coordination meeting 12th December 2017
Presentation transcript:

LHC-EYETS 2016/17 Coordination meeting #18 14th February, 2017 EYETS follow up – Marzia Bernardini

LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945 EYETS 2016-2017: General infos LHC-EYETS completed on Sunday 30th April. All the activities must be completed by Friday 14th April IMPACT: intervention period EYETS-LHC-2016/17 Phone ‘piquet’: 161669 OSS website (planning, constraints, …): https://espace.cern.ch/en-dep-mef-lpc/EYETS2016-2017/Global%20Schedules/Forms/AllItems.aspx INDICO: https://indico.cern.ch/category/7198/ The access during the AUG test is according to a list  any access IN SURFACE need to be declared  NO access underground except EN-EL and EN-CV Unlock out W14 (3rd April - 7th April) LHC back to BE-OP on Friday 14th April LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

Validation of level gauge klystron/RF cryo-module Proposed dates from coordination  week 8 Proposed date from TE-CRG  15th February (Tomorrow) NO ACCESS between green doors Activities schedule: Depressurising line C from 8:30 to 10:00 to 1.1b and then keeping line C to that pressure (return flow line D) Lock out of CV933 removed (only this valve) (1/2h) Then CV933 will be opened slowly to equilibrate pressure if any..(1/2h) Then positioner will be replaced + a ‘re-initialisation’ will be done (2-3h) And finally valve will be lock out again. IMPACT on BE/BI activities  BSRT LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

Fire detection and ODH flash Fire detection in RA67  Installation of a fire detection tube, needed: VIC Work authorisation (Helium spill risk) Electrical lock out Cryogenics lock out ODH flash replacement in UJ14, ITs area  Move position in the transport zone? LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

Survey measurement w/o ventilation s.7-8 Test performed yesterday Shielding in UJ 84 closed Ventilation doors in LSS7R opened residual air flow 0.4 m/s Request from EN-ACE-SU to CLOSE the ventilation door in LSS7R  Safety authorisation required LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945 New request, BGI in LSS4R Replacement of BGI in LSS4R - Following the lasted investigations on the BGIs, it might be suggested that the 2 BGI chambers in 4 Right (D5R4) are replaced with drift tubes as done for D5L4. Please, can you let us know: 1. Are the replacement chambers ready of installation? If not, what is that status and when could they be installed? 2. What would be the impact on the planning if these BGIs were replaced with drift tubes? - Warm magnet lockout needed LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945 Non conformities BI in UJ22 Un diamond BLM a été installé durant un des TS-2016, selon ECR LHC-BLM-EC-0005 Il avait été validé que ce BLM soit installé coté passage. Il a finalement été installé à l’arriere, sous le BLM existant. BI RA43 Le BGV et ses accessoires ont été installés durant le LS1, selon ECR LHC-BGV-EC-0002. Les 2 tuyaux d’alimentation en gaz, reliant le rack en UA43 a la boite en RA43, n’ont pas été installés comme prévu ce qui obstrue la visée géomètres. Les 2 tuyaux reviennent à plat a 2390 du sol, soit au travers toujours de la même visée. Enfin, les 2 tuyaux remontent plus tôt que prévu, juste en face et tres proche du soufflet de la QRL, et le support au plafond n’a pas été intégré, et 1 de ses branches ne sert à rien. BLM on D1 in LSS1 and LSS5  decision to NOT re-install the BLMs LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

LHC-EYETS: electrical constraints AUG TEST Point Day LHC1 + ATLAS 6th January BA1 13th February LHC18 + SM18 10th January BA2 15th February LHC2 + ALICE 16th March BA3 16th February LHC3 + PM32 16th January BA4 + CNGS 28th February LHC4 8th Mars BA5 1st Mars LHC5 + CMS 5th January BA6 20th January LHC6 9th Mars BA7 LHC7 7th Mars LHC8 27th February PS + PSB 14th & 15th January Prevessin 18th February BA80 4th April Meyrin + Adm. 4th January BA81 5th April Meyrin W. + ISR 28th January BA82 + 85 6th April No Access in the Surface, Underground Areas and Underground adjacent access points Under discussion TEST SECOURS (10min) AUTO TRANSFERT TEST All points on 9th January (6am – 6:10am) No access in LHC1, LHC18, BA6 & BA7 on 4th and 5th February (Saturday & Sunday) LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

LHC-EYETS: Maintenance CV Maintenance Point Weeks Start Finish LHC1 50 – 51 – 1 – 2 15th December 11th January LHC2 9-10-11 27th February 19th Mars LHC3 8 10 6th March 10th March LHC4 2 – 3 – 4 10th January 27th January LHC5 49 – 50 – 51 – 1 5th December 6th January LHC6 6 – 7 – 8 6th February 24th February LHC7 9 3rd March LHC8 3 – 4 – 5 16th January 3rd February Cryo Maintenance Point Weeks Start Finish LHC1 2 – 3 – 4 11th January 24th January LHC2 11-12 13th March 24th March LHC4 9 – 10 27th February 10th March LHC6 6 – 7 – 8 – 9 6th February 3rd March LHC8 7 – 8 13th February 24th February LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

No Access in the Surface & Underground Areas Safety Test & DSO Test No Access in the Surface & Underground Areas Point Week SAFETY TEST LHC1 + ATLAS 6 06/02/2017 LHC2 + ALICE 7 07/02/2017 LHC3 1 3/01/2017 LHC4 51 22/12/2016 LHC5 + CMS 52 28/12/2016 LHC6 27/12/2016 LHC7 4/01/2017 LHC8 + LHCb 2/01/2017 COMPLETED DSO TEST All points  7th & 8th April LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

LHC-EYETS: constraints W7 and W8 LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

LHC-EYETS: constraints W7 and W8 LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

LHC-EYETS: constraints W7 and W8 LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

Safety aspects: VIC follow up Activity Group Location Status @ 7th February Cabling & Fibre EN-EL-FC Gael Girardot Antonio Gonzales LSS8 LSS5R LSS2R LSS6 LSS7 Arc 2-3 (for TE-MSC thermoswitch) VIC Approved VIC Approved VIC Approved VIC Approved VIC not needed VIC to be organised ALFA shielding installation EP- Alfa Mickael Lazzaroni LSS1 A31L@ Magnet exchange MSC Sandrine Le Naour 31L2 Sensor Cracks SMB Richard Morton RB26 VIC waiting for approval Network cable pulling IT-CS Stephane Casenove UJ33 UD62 and UD68 activities EN-STI UD62 & UD68 DIMR completed MKI activities & Cabling EN-EL, TE-ABT UA63, UA67, RA63, RA67 Fire detection in RA67 BE-ICS RA67 VIC to be performed ODH flash in UJ14 UJ14 (ITs) LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

Work authorizations (Helium spill risk) updated on 5th Jan. 2017 New: Campagne de mesure des géomètres sans ventilation dans l’arc 78 (EYETS 2016/17) under approval LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

Lineal schedule Co-activity P1 LSS1L W6-7 Survey activities AFP activities W8 à ALFA shielding installation à NO co-activity W9-10 tomographies in sector 8-1 (no access)  W11-12-13  AFP activities W14 à ALFA shielding installation à NO co-activity (3-4th April)   LSS1R W6-7  Survey activities W7-8-9-10  NO ACCESS FROM Wed. 15th FEB!!!  Cool down sector 12 W11 à ALFA shielding installation à Works on shift (6h-14h or 14h-22h) AFP activities à Works on shift (6h-14h or 14h-22h) W 12 à AFP activities W13  ALFA shielding installation à NO co-activity (27-28th Mars) W13-until the end of EYETS  NO ACCESS à ElQA test 12 Arc12 W7-8-9-10  NO ACCESS  Cool down sector 12 W13-14 à NO ACCESS à ELQA test sector 12 W14-15 à NO ACCESS à Cool down sector 12 LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

Personal ODH MANDATORY LSS1L Personal ODH MANDATORY in the arc LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

Personal ODH MANDATORY Point 1 Personal ODH MANDATORY in the arc LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

Personal ODH MANDATORY Point 18 Personal ODH MANDATORY in the arc LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

Personal ODH MANDATORY Arc 1.2 Personal ODH MANDATORY in the arc LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

Personal ODH MANDATORY LSS2L – P2 Personal ODH MANDATORY in the arc LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

Personal ODH MANDATORY LSS2R – Arc 2.3 Personal ODH MANDATORY in the arc LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

Personal ODH MANDATORY Point 3 Personal ODH MANDATORY in the arc LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

Personal ODH MANDATORY Arc 3.4 - LSS4L Personal ODH MANDATORY in the arc LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

Personal ODH MANDATORY Point 4 Personal ODH MANDATORY in the arc LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

Personal ODH MANDATORY LSS4R – Arc 4.5 Personal ODH MANDATORY in the arc LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

Personal ODH MANDATORY LSS5L Personal ODH MANDATORY in the arc LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

Personal ODH MANDATORY in the arc Point 5 LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

Personal ODH MANDATORY in the arc LSS5R LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

Personal ODH MANDATORY in the arc Arc 5.6 – LSS6L LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

Personal ODH MANDATORY in the arc Point 6 LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

Personal ODH MANDATORY in the arc LSS6R LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

Personal ODH MANDATORY in the arc Arc 6.7 LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

Personal ODH MANDATORY LSS7L Personal ODH MANDATORY in the arc LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

Personal ODH MANDATORY Point 7 Personal ODH MANDATORY in the arc LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

Personal ODH MANDATORY LSS7R Personal ODH MANDATORY in the arc LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

Personal ODH MANDATORY Arc 7.8 Personal ODH MANDATORY in the arc LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

Personal ODH MANDATORY in the arc LSS8L LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

Personal ODH MANDATORY in the arc Point 8 LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

Personal ODH MANDATORY in the arc LSS8R – Arc 8.1 LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

Next Coordination meetings Week 8  21st February @9h00, room 30-7-010 Week 9  28th February @9h00, room 30-7-010 LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

LHC-EYETS: linear schedule Baseline LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945

LHC-EYETS: Constraints LHC machine Schedule for LHC EYETS EDMS 1756963; INDICO 613945