Very preliminary draft

Slides:



Advertisements
Similar presentations
Optical Manufacturing Solutions 1 Probe Assembly.
Advertisements

Click on this image to open the full PDF document.
STAR Detector Main Support System1 Lateral Tracking of the STAR Detector during Translation. November 23, 2005 Ralph L. Brown STAR Operations Group.
SPL Intercavity support Conceptual design review 04/11/ A. Vande Craen TE/MSC-CMI.
ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.
Mu2e Production Target Remote Handling By: Michael R. Campbell, Fermi National Accelerator Laboratory, , System Layout Basic.
Wed 15 Jul 2009 ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 First installation report 15 July 09.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD IR Mechanics 7 th B2GM.
Tracking Integration Challenges Y. meeting 2013/9/25.
SVD Mechanics 21th B2GM Florian Buchsteiner (HEPHY Vienna)
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
1 Mechanics news from KEK S.Tanaka (KEK) SVD/PXD meeting SVD parallel session.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
ILC / ILD TPC Requirements of the support mechanics Volker Prahl ILD Workshop 2013 Cracow
1m 3 SDHCAL Mechanic Structure M.C Fouz 8/10/2010 The 1m 3 prototype Mechanical Structure is financed by: Spanish HEP National Program by the project FPA
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
The Belle II Silicon Vertex Detector Florian Buchsteiner (HEPHY Vienna)
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
1 Beam pipe and VXD mockup status at KEK S.Tanaka (KEK) SVD/PXD meeting.
Lav meeting F. Raffaelli INFN – Sezione di Pisa C. Capoccia LNF, A. Cecchetti INFN – Sezione di Frascati CERN, Dec13 th, Feet friction studies. -Installation.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
SVD assembly S.Tanaka. Outline SVD assembly work is individual with Beam pipe, heavy metal shield and PXD system. –Assembly work will be done on two assembly.
,C. Kiesling, 10th BPAC Meeting, KEK, Japan, Feb. 7-9, VXD Commissioning Organizational Matters (in response to the BPAC October report) Overall.
Next chance for Service test. In the next B2GM Use of old VXD KEK The screw connection may not work. -> double scotch tape for PXD PP mock 1/4.
Ladder Mount R&D T. Tsuboyama (KEK) 2 Oct T. Tsuboyama (KEK) 2 Oct
Side Rail Sag Measurement T. Hayakawa, K. Inami, K. Suzuki (Nagoya) and T. Kohriki (KEK) PID upgrade meeting.
Joint Institute for Nuclear Research Deformations and stresses in the flux return yoke A.Efremov, Yu.Lobanov, A.Makarov Darmstadt,
SVD IR mechanics status S.Tanaka SVD mechanics session.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
KEK status report S.Tanaka(KEK) 13 th DEPFET workshop 2013/06.
Status of the Yoke Interfaces Presented by Evgeny Koshurnikov February 2013.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
VXD mechanics issues S.Tanaka. Remaining issues (short term) SVD ladder mount table –Mount arm design(KEK+SVD) –Origami cooling pipe assembly procedure.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
8 September 2011 Belle II SVD/PXD Installation Procedure Mockup Meeting Munich Immanuel Gfall (HEPHY Vienna)
Removing the VTPC from the VERTEX magnets
Shaft Replacement Standard Operating Procedure
Florian Buchsteiner (HEPHY Vienna)
Miscellaneous MEC Topics Mainz, CM September 2016, MEC Session J
Installation Walkthrough Image Guide
Installation scheme (1)
9 September 2015 VXD Mechanics Summary Markus Friedl (HEPHY Vienna)
Easy centering and setting system
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
ProtoDUNE – DSS Installation, Alignment and QA
MECHANICS OF THE FORWARD STRAW TUBE TRACKER (preliminary) Federico Evangelisti INFN - Ferrara GSI - 7/11 dicember 2009.
KEK IR status S.Tanaka KEK.
NA62 LAV Anti1 REMOVAL & TESTS
Update on the SVD construction
- CT INSTALLATION PROCEDURE OVERVIEW -
Present status of the flux return yoke design
Discussion items SVD mechanics session.
KEK IR status Shuji Tanaka KEK DEPFET workshop 2011/2/7-9 1.
Cooling pipes and Space for Services
Katsuro Nakamura Sep. 10, 2015 VXD meeting
INSTALLATION SEQUENCE
Requirements of the support mechanics
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
The IR beam pipe M. Sullivan For
Test box for ProtoDUNE SP – Integration Test
Challenges for FCC-ee MDI mechanical design
Presentation transcript:

Very preliminary draft VXD installation S. Tanaka (KEK)

VXD Installation options Remote Vacuum Connection: *VXD and QCS are independently installed like SVD2 *Requiring space for RVC mechanism *Service work start after VXD installation *The RVC mechanics have confirmed by some tests *Installation tool design (for conceptual test) is ongoing (Installation procedure other than RVC will validate before decision) C.Niebuhr,K.Gadow Baseline installation procedure: *VXD and QCS are connected before installation *Requiring space for VXD support ring to align position *Service work of FW should finished before installation *Mechanical analysis ->done *Installation test with mock-up->done other than cable stress estimation to VXD structure T.Kohriki, K,Kanazawa 2013 Oct: Starting design work of VXD installation sub-parts 2013 Nov.: Decision of installation procedure by internal review The decision will be done in Nov.

VXD mechanics Do you have good picture including SVD service > Tschalie?

Discussion slide Request from reviewer We hope that the installation procedures and sequence can be discussed in some detail with a full accounting of clearances and the remote vacuum connections. (by Tschalie ?) Would it be possible to also post the specifications for installation? For example, what is the target relative alignment between the PXD and SVD, between the end rings and support rings that control the twist of the SVD, module installation precision and things of that nature. (L-shape sensor for inside or additional sensors to monitor position on installation) These are to be answered in Shuji Tanaka's talk. Obviously he needs input from benny. Answer slides will be prepared after meeting in Sunday and Monday This is not only for AIM but also for baseline option

What should be prepared before decision Installation procedure animation image with realistic. Mechanical analysis on each typical step Stress to CFRP (because of gluing connection with End-flange) Deformation of VXD by stress on installation Installation test with mockup Showing feasibility of service work with space margin Ensuring repeatability of VXD Installation and dismantle Decision should be done by Belle II EB with machine group leader in Nov. B2GM

Comparison table Baseline Alternative option Cabling +piping(FW) Before install After install QCS disassembly Common with VXD Individual with VXD Mockup test Done Discussing in Nov. Mechanical analysis Service space estimation including working space OK (because of individual work with installation) Cable stress estimation to VXD structure on Installation steps Need verification Not issue by cabling work after installation Should discuss on meetings in Sunday and Monday

VXD load test into CDC As a result,  The VXD structure sink ( CDC structure deform) about 180-190um (200um was expected) with 80 kg of VXD mockup structure and additional weight (This load was applied on both End flange. )

QCS tip position shift on install · How much the tip of the QCS used in KEKB shift at collision point, based on the movement test of the QCS moving frame. -From spec of the frame, horizontal and vertical variation should be within 0.5 mm. the results of the test are satisfied with it move. However, if we look at the tip of the QCS, the tip of the QCSR was shifting about 1 mm in vertical. On the other hand, on QCSL case, 0.2mm variation in vertical and 0.4mm in horizontal The difference is mainly caused by the adjustment of the position of the rail. In the current scenario, the movement of the QCS tip should be kept below 0.5 mm.

Floor for QCS stage Floor will be very flat by adopting self-leveling method

Base line procedure

Installation Scenario - Baseline T. Kohriki Design of support structure is not started yet. (expected from September)

Vertex detector installation The cabling and piping work should be finished before installation. The cables on backward are put on sled The sled guide is fixed on backward side

Vertex detector installation

Vertex detector installation The guide roller keep the weight until touching the roller on CDC Inner cylinder

Vertex detector installation After touching the roller in CDC inner cylinder , Guide roller will be removed.

Vertex detector installation On this case, the roller on backward side keep the Weight (CFRP should not attach in any position)

Vertex detector installation VXD is connected with CDC at backward (xyz) Forward position is fixed for x-y position with guide roller

SVD support ring at forward region Positioning guide pin (CDC side) Release control rod after install (QC cryostat side) Guide roller to keep weight of SVD

QCS-VXD Joint VXD arm Pin(f 10) QCS arm Screw bolt(M8) Nut-cramp (M8) The junction between VXD and the cryostat must be loosened so that a possible motion of the cryostat after exciting magnets may not exert a force on VXD. VXD arm Pin(f 10) QCS arm Screw bolt(M8) Nut-cramp (M8) Ring-cramp(f 8.2) The pin support the support ring of VXD. By loosening the nut-cramp, VXD arm and QCS arm are mechanically disconnected. The tolerance is 1 mm. (Kohriki)

Fixing Backward Remove support extension Remove the upper half of the support ring and adopt brackets connecting CDC ring and VXD Remove other half of the support ring and adopt brackets connecting CDC ring and VXD VXD detector is fixed at backward end for x, y, z axis

Vertex detector installation

Vertex detector installation

BP20kg_Sled:SUS1mmt Equivalent stress:Max 32MPa Deformation:Max 1.3mm IR weight ~60kg Rib is added Deformation:Max 1.3mm CFRP stress :Max 11MPa The equivalent stress depends on the weight of structure

Installation test with mockup On Dec 2012. we have tested this installation procedure with mockup.

Alternative Installation method

Schematic view of RVC installation procedure Apply similar procedure with Belle SVD2 case Almost similar with Belle SVD Procedure without support tube Discussion of detail procedure is ongoing

VXD Installation Step 1 Install mounting tube (stainless steel) and connect to inner endring of CDC (both sides) bwd fwd

VXD Installation Step 2 install support structures on both sides bwd fwd

VXD Installation Step 3 install mounting tube extensions on both sides bwd fwd

VXD Installation Step 4 connect cable trays on both sides of VXD bwd fwd 40 kg 80 kg 40 kg sliding parts

VXD Installation Step 5 lower VXD system to mounting tube extension bwd fwd

VXD Installation Step 6 bend CO2 pipes and fiddle through CDC as far as possible bwd fwd

VXD Installation Step 7 push VXD system by hand through mounting tube, helping from bwd with rope or better divided rod … bwd fwd

VXD Installation Step 8 … until it reaches the final position bwd fwd

VXD Installation Step 9 fix the bwd end of VXD to CDC endring (at 3 flange-positions, 0 degree of freedom at bwd) bwd fwd

VXD Installation Step 10 fix the fwd end of VXD to CDC endring (with long fixing screw, 1 degree of freedom in moving direction at fwd) bwd fwd

VXD Installation Step 11 temporarily suspend cable/pipes on fwd end bwd fwd

VXD Installation Step 12 remove extension on fwd end bwd fwd

VXD Installation Step 13 Install the first fwd cable on CDC inner wall and hang all other cable on hooks which are mountet on the fwd outside wall of the CDC bwd fwd

VXD Installation Step 14 remove cable tray on fwd end bwd fwd

VXD Installation Step 15 remove the mounting tube flange fwd bwd fwd

VXD Installation Step 16 Install all other fwd cable bwd fwd

temporarily suspend cable/pipes on bwd end VXD Installation Step 17 temporarily suspend cable/pipes on bwd end bwd fwd

Pull extension bwd which is connected with the mounting tube VXD Installation Step 18 Pull extension bwd which is connected with the mounting tube bwd fwd

VXD Installation Step 19 Remove extension bwd bwd fwd

VXD Installation Step 20 remove mounting tube bwd fwd

VXD Installation Step 21 Install the first bwd cable on CDC inner wall and hang all other cable on the hook which is mountet on the bwd outside wall of the CDC bwd fwd

VXD Installation Step 22 remove cable tray on bwd end bwd fwd

VXD Installation Step 23 Install all other cable bwd bwd fwd

BRM (Baseline Retraction Method) (for emergency extraction together with QCS on fwd) (V2.2)

VXD emergency de-installation Step 1 QCS disconnected from the beampipe on bwd with RVC or by hand bwd fwd

VXD emergency de-installation Step 2 retract QCS on bwd bwd fwd

VXD emergency de-installation Step 3 release cable basket on fwd so that the VXD cables rest on the QCS bwd fwd

VXD emergency de-installation Step 4 on bwd end install cable suspension system (cantilever arm) bwd fwd

VXD emergency de-installation Step 5 fix cable to suspension system on bwd end bwd fwd

VXD emergency de-installation Step 6 connect cable tray on bwd side of VXD bwd fwd

VXD emergency de-installation Step 7 install a support flange for the emergency mounting tube on bwd bwd fwd

VXD emergency de-installation Step 8 move the emergency mounting tube in position (bwd) bwd fwd

VXD emergency de-installation Step 9 move the emergency mounting tube until it will be fixed at the QCS/RVC with a snap fit connection bwd fwd

VXD emergency de-installation Step 10 remove the VXD fixing on bwd side of CDC flange bwd fwd

VXD emergency de-installation Step 11 partially retract the QCS together with emergency mounting tube and the VXD bwd fwd

VXD emergency de-installation Step 12 bwd fwd

VXD emergency de-installation Step 13 on fwd side install two emergency cantilever arms and a mounting tube support bwd fwd

VXD emergency de-installation Step 14 Remove the bwd flange of the mounting tube bwd fwd

VXD emergency de-installation Step 15 Retract QCS further until all cables on bwd side are free bwd fwd

Installation tools

Support tool idea for baseline option Installation tools are similar on both option

Installation tools for AIM