Forecasting and Minimizing Field Rework

Slides:



Advertisements
Similar presentations
Construction Project Coordination Presented by: Philip H
Advertisements

FACTORS AFFECTING CONSTRUCTION COSTS IN SAUDI ARABIA By Yaser Abdulla Al-Juwairah Presented by Shaikh Imran Abdul Qayyum Gani.
The Value of an Engineering Degree Dave Johnson M.Eng.
Position Title: Band: Location: Reports to: Supervises: Sales Manager / Regional Sales Manager AVP On Site General Manager, Sales Job overview Achieve.
Ensure Vendor/Engineer of Choice Product Quality
COAA Industry Benchmarking What gets measured, gets improved! “When you’re average, you’re just as close to the bottom as you are to the top.”
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
QAAC 1 Metrics: A Path for Success Kim Mahoney, QA Manager, The Hartford
Establishing the Integrity of Data:
Management Accounting. The Functions of Management Planning Acting Controlling Feedback.
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
Operations and Supply Chain Strategies
Diploma of Project Management Course Outline NSW Course Number Qualification Code BSB51407.
Computers Are Your Future Eleventh Edition Chapter 10: Careers & Certification Copyright © 2011 Pearson Education, Inc. Publishing as Prentice Hall1.
Project Definition Rating Index (PDRI) Revisited
B & M Industrial Services “The Leader in Industrial Contract Services”
PIP: Working in Harmony to Change Industry Steve Franke Shell Chemical Company Process Industry Practices 2000 CII Annual Conference Nashville,
المؤتمر الهندسي الدولي الثاني للإعمار والتنمية الجامعة الإسلامية- غزة The 2 nd Inter. Engineering Conference on Construction and Development Islamic University.
National Energy Technology Laboratory U. S. Department of Energy Project Kickoff Presentation December 16, 2003 Ken H. Green Principal Investigator Development.
Engineering Productivity Measurement Research Team Engineering Productivity Measurement Research Team Bob Shoemaker BE&K Bob Shoemaker BE&K CPI Conference.
Construction Work Packaging
Software System Engineering: A tutorial
Predicting Patterns: Lenawee County's Use of EXPLORE and PLAN DataDirector 2011 User Conference Dearborn, Michigan.
Making Zero Field Rework A Reality Workshop
COAA Industry Benchmarking If you are not keeping score you are just practicing “
AMERICAN SOCIETY OF SAFETY ENGINEERS – ENERGY CORRIDOR LEVERAGING LEADING INDICATOR DATA TO TRANSFORM EH&S PERFORMANCE SEPTEMBER 10, Quincey Jones.
32 nd National Energy & Environmental Conference September 19, 2005 Benchmarking the Engineering & Construction Industry.
Project Delivery and Contract Strategy (PDCS) Project Delivery and Contract Strategy Research Team Project Delivery and Contract Strategy Research Team.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Forecasting and Minimizing Field Rework Effects of Field Rework Research Team 2000 CII Annual Conference Nashville, Tennessee Jim Atkinson U.S. Steel Effects.
DACE Labor Productivity Norms – The New “Gulf Coast”?
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
1 Project Management Introduction. 2 Chap 1 What is the impact? 1994: 16% of IT projects completed “On-Time” 2004 : 29% of IT projects “On- Time” 53%
Center for Reliable Engineering Computing (REC) We handle computations with care Founded 2000.
What is the Owner’s Role in Project Success? Debra Nauta-Rodriguez Smithsonian Institution.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
FORUM: Design for Maintainability CII Construction Project Improvement Conference September 11-13, 2005 Austin, Texas George Conner Richard Danks Robert.
CII Director’s Remarks Wayne A. Crew, P.E., CII. NCCER – Scramble for Skills Sponsors Cianbro CMLA (Construction Market Labor Analyzer) Fluor Hargrove.
1-1 Copyright © 2014, 2011, and 2008 Pearson Education, Inc.
CII RT204 THEOWNERSROLETHEOWNERSROLE RT 204 The Owner’s Role in Project Success 2005 Jim Vicknair – WorleyParsons.
2015 CII Annual Conference August 3-5 Boston, Massachusetts Art MarkmanNoé SáenzStephen Mulva Univ. of Texas / HDOBurns & McDonnellUniv. of Texas / CII.
Quantifying the Cumulative Impact of Change Orders Rich Camlic Chair Cumulative Change Order Impacts Research Team 2000 CII Annual Conference Nashville,
Engineer Exceptionally Capable Project Teams February 2012.
NAPA Agile Story: From Zero to Hero in Two Years Toivo agilehope.blogspot.com #NAPA #SAFe.
CS646: Software Design and Architectures Introduction and Overview †  Definitions.  The general design process.  A context for design: the waterfall.
1. Stephen R. Thomas Candace L. Macken Tae Hwan Chung Inho Kim Construction Industry Institute Funded by NIST 2.
Don’t Gamble with Your Project’s Performance Benchmarking and Metrics Committee 2009 CII Annual Conference Danny Scott (BE&K, a KBR Company)
2011 Annual Conference Chicago Driving Predictable Business Outcomes in a Dynamic Global Market Opening Comments Noé Hernández-Sáenz (Moderator) Burns.
Ken Eickmann Director Construction Industry Institute
Engineering Productivity Measurement
Construction Work Packaging
TOPIC : PROJECT MANAGER
Commissioning & Startup
Capital Projects Supply Chain Management
Agile Metrics that Matter
Quantifying the Cumulative Impact of Change Orders
Project Delivery and Contract Strategy (PDCS)
Fully Integrated and Automated Project Processes – The Vision
State of Michigan Achieving Software Process Improvement with
Evaluating Onsite Design Project Team
Project Organization, Leadership, & Control Reading: pp. 351 – 339.
Benchmarking as a Best Practice
Noé Hernández-Sáenz Burns & McDonnell Engineering
CIFE welcome.
in Construction Industry
INDUSTRIAL FIREPROOFING Evaluation Services
CIFE welcome.
TDOT Civil Rights Division Small Business Development Program.
S-STEM: Bridging Our Students to Their Future
Presentation transcript:

Forecasting and Minimizing Field Rework Effects of Field Rework Research Team Jim Atkinson U.S. Steel Effects of Field Rework Research Team 2000 CII Annual Conference Nashville, Tennessee

Field Rework Research Team RT-153 Richard Calhoun Phillips Petroleum Co., Chairman Jim Atkinson U.S. Steel Andrew Beal Air Products & Chemicals Joe Beffa Black & Veatch Tom Falso Eichleay Francis House Kellogg Brown & Root David Rogge Oregon State University Phill Stassi Jacobs Engineering Group, Inc. William Wright Chemtex International

RT-153 Objectives Identify methods being used to track rework. Identify the major causes of rework. Identify practices that most effectively minimize field rework. Develop a tool (Field Rework Index, FRI) that will foretell the degree of field rework.

Definition Field Rework is: Field Rework is not: Total direct cost of rework in the field regardless of initiating cause or source. Field Rework is not: Change orders (not affecting previously installed work) Off-site fabricator errors Off-site modular fabrication errors

Calculation % Field Rework = Total direct cost of rework performed in field Total field construction phase cost

How BIG is the Problem? CII Survey Data CII Research Summary 10-2 12% rework on nine industrial projects 1997 Benchmarking & Metrics Data Report 3.4% for 19 industrial projects CII Effects of Field Rework Research Team 5.8% for 78 industrial projects Ranges between 0% and 27%

Cost Growth vs. Field Rework >4% Rework  Avg 8% Cost Growth <4% Rework  Avg –1.5% Cost Growth

How Is Field Rework Tracked? Objective 1 CII Quality Performance Management System (QPMS) Adaptations of QPMS elements Company internal systems Research Report 153-11 will present a simplified system for field rework tracking only.

Rework Causes and Cures Objectives 2 & 3 Analysis shows strongest relationships between: Engineering rework and field rework Owner organization alignment and field rework Conclusion: Improve upstream processes (pre-project planning and engineering) and downstream processes (construction) will improve. Not Rocket Science

Predicting Field Rework Objective 4 Project team answers 16 questions. Scores are tabulated and multiplied by a factor and summed. A1(X1) + A2(X2) … A13(X13) + Constant = FRI An = Factor Xn = Team score for a question

What Are the Questions? Three categories of questions: Team planning and organization Information availability Staffing or schedule constraints

Team Planning and Organization Alignment within owner organization Owner’s attitude on scope change Degree of use of project execution planning Change of design discipline leaders Commitment to using constructability by design and construction contractors

Information Availability Design firm’s qualifications Field verification of conditions by engineering Quality of interdisciplinary design coordination Availability of supplier information Level of design rework

Staffing or Schedule Constraints Compression of design schedule Design overtime Quality of supplier pre-qualification Availability of skilled craftworkers Construction contractor shift work Construction contractor overtime

When Will the FRI Be Published? That depends on you... FRI database needs more projects! Confidence in predictors of rework Improve accuracy and reliability Will not be released unless “statistical robustness” is demonstrated.

What Do I Do to Help? Contact Dr. David Rogge: Dept. of Civil Engineering Oregon State University Apperson Hall, Rm. 111 Corvallis, OR 97331-2302 Phone: (541)737-4351, Fax: (541)737-3300 E-mail: David.Rogge@orst.edu Download copies of the FRI - EZ data collection form, complete, and return to Dr. Rogge. www.engr.orst.edu/~rogged