GIG plan updates GIG leads were requested to update their work plans

Slides:



Advertisements
Similar presentations
Intercalibration of assessment systems for the WFD: Aims, achievements and further challenges Presented by Sandra Poikane Joint Research Centre Institute.
Advertisements

Lake Intercalibration: status of ongoing work Sandra Poikane Joint Research Centre Institute for Environment and Sustainability.
Biological methods to detect the effects of hydrological and morphological pressures Introduction and overview of questionnaire responses.
Intercalibration Guidance: update Sandra Poikane Joint Research Centre Institute for Environment and Sustainability.
Presented by Sandra Poikane EC Joint Research Centre Institute for Environment and Sustainability Biological indicators of lakes and rivers and the Intercalibration.
1 Intercalibration in the Eastern Continental Region 1 Dr. Ursula Schmedtje International Commission for the Protection of the Danube River.
WG 2A ECOSTAT 7-8 July 2004 Task on Harmonisation of Freshwater Biological Methods Status Report AC Cardoso and A Solimini Harmonisation Task Team: JRC.
Lake Intercalibration Presented by Sandra Poikane Joint Research Centre Institute for Environment and Sustainability.
ECOSTAT 8-9 October 2007 River GIGs: Future intercalibration needs/plans Presented by Wouter van de Bund Joint Research Centre Institute for Environment.
Working Group A ECOSTAT Intercalibration Progress Coast GIGs JRC, Ispra, Italy, March 2005 Dave Jowett, Environment Agency (England and Wales), Coast.
ECOSTAT 1-2 October 2008 Intercalibration – status of ongoing work – Coastal/Transitional Presented by Wouter van de Bund Joint Research Centre Institute.
River Intercalibration Phase 2: Milestone 4 reports Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Intercalibration Option 3 results: what is acceptable and what is not ? Sandra Poikane Joint Research Centre Institute for Environment and Sustainability.
River Intercalibration Phase 2: Milestone 2 reports Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
River Intercalibration Phase 2: Milestone 3 reports Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Updating the intercalibration process guidance Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Working Group 2A ECOSTAT Finalisation of the intercalibration register Presented by Wouter van de Bund Joint Research Centre Institute for Environment.
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
NE ATLANTIC GEOGRAPHICAL INTERCALIBRATION GROUP (NEA GIG)
Task on Harmonisation of Freshwater Biological Methods
Intercalibration excersice progress report Presented by Palle Haastrup Joint Research Centre Institute for Environment and Sustainability Inland.
Intercalibration results 2006/2007
Intercalibration Results 2006
WG 2A Ecological Status First results of the metadata collection for the draft intercalibration register: RIVERS.
Results of the metadata analysis Meeting of the Working Group 2A on Ecological Status (ECOSTAT) March 4-5 , 2004, Ispra, Italy Peeter Nõges Anna-Stiina.
Working Group A ECOSTAT Summary Milestone 5 Reports: River GIGs Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Intercalibration in transitional waters (TW) Phase 2: Milestone 4 Reports (M4R) Presented by Nikolaos Zampoukas Joint Research Centre Institute for Environment.
Types, Pressures and Quality Elements - Rivers
CW-TW Intercalibration work progress
Working Group A ECOSTAT October 2006 Summary/Conclusions
Results of the Coastal and Transitional Waters Metadata Analysis
CEN TC 230 WG2 “Biological and Ecological Methods” Implications for Annex V ECOSTAT Oct 2012 Paul Logan.
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
Progress on Intercalibration COAST GIGs
River GIGs: Future intercalibration needs/plans Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Draft Commission Decision on Intercalibration
ECOSTAT, Stresa, Italy, 3-4 July 2006
Working Group 2A ECOSTAT Summary progress report River GIGs Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
Working Group 2A ECOSTAT Intercalibration process - state of play Wouter van de Bund & Anna-Stiina Heiskanen Joint Research Centre Institute for Environment.
Working Group A Ecological Status - ECOSTAT WFD CIS Strategic Coordination Group meeting, October 2005 Progress in the intercalibration exercise.
Working Group A ECOSTAT Summary Milestone Reports: River GIGs Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Ecostat meeting - Ispra March 2006
Working Group A ECOSTAT Update on intercalibration Prepared by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Working Group A Ecological Status - ECOSTAT State of play in the intercalibration exercise Water Directors Meeting, November 2005.
Progress Report Working Group A Ecological Status Intercalibration (1) & Harmonisation (3) Activities Presented by Anna-Stiina Heiskanen EC Joint Research.
Intercalibration Decision and Technical Report
WFD – CIS Working group A ECOSTAT
WG A Ecological Status Progress report April-October 2009
Working Group A ECOSTAT progress report on Intercalibration Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
ECOSTAT, Stresa, Italy, October 2005
IC remaining gaps: overview and way forward
ECOSTAT meeting, June 28th, 2011
River groups with extension
Lake Intercalibration – IC Decision Annexes + what to do in future
Presented by Ana Cristina Cardoso
Standardisation/Harmonisation
Working Group A Ecological Status - ECOSTAT WFD CIS Strategic Coordination Group meeting, 22 Febraury 2006 Progress Report.
Lake Intercalibration
Common Implementation Strategy for the
WFD CIS WG ECOSTAT meeting on 8-9 October 2007 Objectives What do we need to achieve during this meeting?
NEA GIG COORDINATION.
2nd phase intercalibration
Intercalibration round 2: finalisation and open technical issues – RIVERS ECOSTAT October 2012.
Baltic Sea GIG Status April 2009
WG A Ecological Status Intercalibration: Where do we go from here ?
NORTH EAST ATLANTIC GIG
WG A Ecological Status Progress report October 2010 – May 2011
Baltic Sea GIG Status Ecostat 23 April 2013
Why are we reviewing reference conditions in intercalibration?
Presentation transcript:

Updates of IC work plan 2008-11

GIG plan updates GIG leads were requested to update their work plans Responses from most (but not all) GIGs Incorporated in version 3.2 of the Intercalibration work programme (24 September 2008)

River GIGs - Alpine No changes No work planned at GIG level

River GIGs – Central-Baltic Updated September 2008 – changes: Planned work on Acidification dropped Macrophyte results delayed (see presentation S. Birk on macrophyte progress)

River GIGs – Eastern Continental No update since previous version Current plans: finalisation phytobenthos, macrophytes, macroinvertebrates mid 2009 Is this still applicable?? See presentation L. Cerovska on EC GIG progress

River GIGs – Mediterranean No update since previous version See presentation T. Ferreira on Med GIG progress

River GIGs – Northern No update since previous version Focus on acidification for QE macroinvertebrates Work in progress?

River GIGs – Fish (all GIGs No update since previous version Planned finalisation – end 2009 See presentation D. Pont

River GIGs – Horizontal issues Two major horizontal issues identified in the river GIG work plans: Reference conditions Large rivers Presentation R. Owen on progress Propose to add separate planning sheets for these topics in the work programme

Lakes GIGs – Alpine Macrophytes, phytoplankton – no update Benthic fauna – update September 2008

Lakes GIGs – Eastern Continental No update since previous version

Lakes GIGs – Mediterranean No update since previous version

Lakes GIGs – Central-Baltic Last update September 2008 (phytoplankton, macrophytes, benthic fauna)

Lakes GIGs – Northern Benthic fauna - last update September 2008

C/T GIGs – NEA Plans last updated by Dave Jowett, May 2008 Phytoplankton: results 2011 Benthic invertebrates: results 2010 Macroalgae: results 2010 Angiosperms: results 2011 Fish: results 2010

C/T GIGs – Mediterranean Plans last updated by G. Casazza, September 2008 Timetables are still missing See presentation G. Casazza on Med progress

C/T GIGs – Black Sea No update since previous version Timetables are still missing

C/T GIGs – Baltic Sea Last update September 2008 (H. Karup) Work in progress – draft work plan July 2008 See presentation H. Karup on Baltic progress

Proposed way forward Keep IC work programme 2008-11 updated (‘living document’) GIGs are requested to check and update their planning sheets where needed Estimated date of completion should always be included JRC will continuously update the document, with the latest version always available on EEWAI CIRCA