CJK NGN test-bed study Phase III&IV

Slides:



Advertisements
Similar presentations
©Koichi Asatani Next Generation Networks -Dream or Reality- Koichi Asatani Kogakuin University, Tokyo APNOMS, Keynote Sapporo, Japan, October 10, 2007.
Advertisements

INTERNATIONAL TELECOMMUNICATION UNION Document 27 – E TELECOMMUNICATION STANDARDIZATION SECTOR TSB Directors Consultation Meeting on IPTV standardization.
Telekom Malaysia’s NGN Implementation Plan
The 6th CJK NGN Working Group Meeting April 10 ~ 12, 2006, Hangzhou, China CJK NGN WG (IP-TV Ad-Hoc Group) Chae Sub Lee
24/08/2005 IP Telephony1 Guided by: Presented by: Dr.S.K.Ghosh Nitesh Jain 05IT6008 M.Tech 1 st year.
Testing SIP Services Over IP. Agenda  SIP testing – advanced scenarios  SIP testing - Real Life Examples.
IP Address Classes How large is the network part in an IP address? Today we use network masks to tell Originally, IP had address classes with fixed numbers.
DOCUMENT #:GSC15-GTSC8-15 FOR:Presentation SOURCE: CJK Test-bed Ad-hoc Group(CCSA, TTA and TTC) AGENDA ITEM: GTSC 4.1 NGN CONTACT(S):CCSA:
DOCUMENT #:GSC15-PLEN-31 FOR:Presentation SOURCE:CCSA AGENDA ITEM:Opening Plenary 6.5 Standardization activities on IPTV in CCSA.
Traffic Monitoring on CJK-Network 16th CJK NGN-WG TTC Nobuyuki NAKAMURA ( Oki Electric Industry Co., Ltd.)
NGN : current and beyond 21st CJK UNIOT-WG TTC Yoshinori
Core Network Technology Prof. Hamid Aghvami Centre for Telecommunications Research - King’s College London Wireless Multimedia Communications Ltd.
0 draft-lkchoi-mmusic-iptvdbs-req-00.txt 63rd IETF, 1 August 2005 Requirement of service provider for the Data Broadcasting Service over the IPTV Lark.
Setup and Evaluate Quality of Service of VoIP on SCOLD Systems Sherry Adair Hakan Evecek Elizabeth Gates.
© Copyright 2009 OKI Networks Co., Ltd. Carrier grade video delivery server OKI MediaServer Ver Hideki Yamamoto (Editor of H.IPTV-AM.0-2 in.
The 6th CJK NGN Working Group Meeting April 10 ~ 12, 2006, Hangzhou, China CJK NGN Test Scenario Proposal by TTA Taesang Choi
The 11th CJK NGN-WG Meeting 1 11 th CJK NGN-WG (CJK NGN Test-bed Activity Report) CJK NGN Test-bed Ad-hoc Group.
The 6th CJK NGN Working Group Meeting April 10 ~ 12, 2006, Hangzhou, China CJK NGN WG (IP-TV Ad-Hoc Group) Chae Sub Lee
1 Status Report on CJK NGN Working Group China Communications Standards Association 9 th CJK meeting April 2009 HeyuanXu, Chairman of NGN-WG.
The 6th CJK NGN Working Group Meeting April 10 ~ 12, 2006, Hangzhou, China CJK NGN Test-bed Proposal by TTA Taesang Choi
Status report on CJK NGN Working Group April 9, th CJK Standard Meeting Taesang Choi Chairman of CJK NGN Working Group.
CJK Standards Collaboration - Brief overview of CJK NID WG HyoungJun Kim Telecommunications Technology Association.
CJK B3G Standards Collaboration Jinsung Choi Ph.D TTA PG301 Chair & Vice-President of LGE, Mobile Communication Technology Research Lab. Telecommunications.
CJK test-bed study Service control based on MPM-RACF communications Test-bed Ad-hoc Group Hideaki YAMADA, Norihiro FUKUMOTO KDDI (KDDI R&D.
The 7th CJK NGN Working Group Meeting October 10 ~ 11, Tokyo, Japan CJK NGN Test-bed Activity Status Report Taesang Choi
RACF Considerations in CJK NGN Test-Bed Youngwook Cha, Taesang Choi, Youhyeon Jeong
The 7th CJK NGN Working Group Meeting October 10 ~ 11, 2006, Tokyo, Japan Performance Objectives for performance testing on CJK NGN testbed Hyungsoo Kim.
A dynamic QoS control scheme for services based on RACF
CJK NGN Test-bed Activities Phase I & II Testing Result
CJK NGN Test-bed Ad-hoc Group
Evaluation Scenarios of the CJK NGN Test-bed
Standardization activities on IPTV in CCSA
VoIP ALLPPT.com _ Free PowerPoint Templates, Diagrams and Charts.
Cognitive Network Standardization Activities April, 2008
CJK test-bed study based on MPM
Review of new Question descriptions under ITU-T SG11
CJK NGN test-bed study Phase Ⅲ&Ⅳ
GSC-14 Closing Plenary Summary Report
Chae-Sub LEE TTA Summary Report of 6th FG NGN Chae-Sub LEE TTA
Proposal for study scope of CJK IPTV-adhoc group
Status report on CJK NGN Working Group
Activities of MPM based admission control device on NGN CJK test-bed
IPTV mechanism for content delivery using P2P
Report of 19th UNIOT-WG Meeting
20th CJK UNIOT-WG (Standardization of Mobile IPTV in ITU-T)
Home Networking activities in TTC
Hans (Hyungsoo) Kim KT corp.
Klara Nahrstedt Spring 2014
Status report on CJK NGN Working Group
Proposal for the CJK NGN Test-bed Activity
CJK 10th NGN-WG (Follow up IPTV-GSI) Chae Sub, Lee
Net 431: ADVANCED COMPUTER NETWORKS
GSC-17 Closing Plenary Summary Report
CJK NGN WG (Proposal for drafting group on IPTV Standards)
Standardization activities on IPTV in CCSA
CJK B3G WG Report.
GSC-17 Closing Plenary Summary Report
Taesang Choi CJK Testbed Collaboration for NGN Taesang Choi
Global Standards of IPTV and its infrastructural framework
GSC: Standardization Advancing Global Communications
Liu Duo CJK4_014 NGN activities in CCSA Liu Duo
Standardization Activities in TTC
I3forum : Terms of Reference WG “IMS-based services and related platforms’ interconnection” Version 1 May 19th 2016.
Charles KIM TTA Collaboration Plan for CJK NGN Charles KIM TTA
The CJK IT Standards Meeting July 5~7, 2004, Seoul, Korea
16EC Computer networks unit II Mr.M.Jagadesh
ITU-T Study Group 16 Multimedia services, systems
Further NGN Development
Hans, KIM TTA Release approach and CJK requirements Hans, KIM TTA
Hans (Hyungsoo) Kim KT corp.
Presentation transcript:

CJK NGN test-bed study Phase III&IV 2008.4.2 Test-bed Ad-hoc Group

Study phases on the CJK test-bed Phase I: 2006 3rd/4th Quarter (Completed) Network Connectivity Scenario 2 and 4 only (2 CS and 2 domains) Phase II: 2007 1st/2nd Quarter (Completed) Scenario 1, 3 (simpler version of 2 and 4, single domain) and 5 The Phases I & II have attained their original objectives for testing planned. We have decided to revise the scenarios of the phases III & IV as follows and to pursue them as the high-priority study among CJK considering the current NGN requirements. CJK NGN Test-bed Phase III: 2008 1st/2nd Quarter Performance Evaluation of RTP/RTCP-based MoIP (Multimedia Voice/Audio/ Video) over IP) service Network connective for Performance evaluation and Performance Monitoring Scenarios 6-1 and 6-2 Phase IV: 2008 3rd ~ 2009 2nd Quarter Performance Evaluation of RTP/RTCP-based MoIP and IPTV services Performance Monitoring Scenarios 6-3 and 6-4 Initial RACF Interoperability testing : Scenario 7 Testing of RACF and RTP/RTCP-based MPM Interactions IPTV Interoperability testing

Test Scenario 6,7 in Phase III & IV Performance Evaluation with RTP/RTCP-based Measurement extensions and initial RACF interoperability testing. Scenario 6-1: Performance evaluation of Network Segments MoIP (Multimedia (Voice/Audio/Video) over IP) service based on CS and/or IMS Scenario 6-2: Performance evaluation of MoIP service among CPEs Local testing of MPM (Provided by KDDI R&D Labs.) CPE-to-CPE performance evaluation Scenario 6-3: Performance evaluation of MoIP service with two MPMs CPE – MPM1 – MPM2 – CPE performance evaluation Scenario 6-4: Performance evaluation of MoIP service with three MPMs CPE – MPM1 – MPM2 – MPM3 – CPE performance evaluation Scenario 7: Testing of RACF and RTP/RTCP-based MPM Interactions Note: Development of the ATCA (SBC of OKI Electric Industry) based MPM is planned.

Network configuration

Concurrent (Multimodal) services Target services Quality and performance testing of the Multimedia over IP (MoIP) services Voice Video Audio (TBD) Concurrent (Multimodal) services Evaluation of the quality of service (QoS) and the application layer quality (QoE; Quality of Experience) in order to control streams of the FMBC (Fixed Mobile and Broadcast Convergence) services based on MoIP.

Test Scenarios 6&7 Scenario No. IP Network Service Platform Services CPE Terminals and other Equipment Evaluations Countries Inter- operability Test among CJK Report Measurement Scheme Measurement Metrics Let by 6-1 C-K: R&D Network C-J: Commercial Network K-J: Commercial Network - See the Next Page Active Measurement Y.1543 - IPTD - IPDV - IPLR TTA/ TTC/ CCSA Local test: C, J, K Two MPMs: C-J, K-J, C-K Three MPMs: C-J-K 13th CJK meeting 2008.07 6-2 SIP MoIP (Unicast) Passive Measurement RTCP (CPE-CPE) TTC/ TTA/ CCSA CPE 6-3 RTCP (CPE-MPM1- MPM2-CPE) CPE and MPM 6-4 RTCP (CPE-MPM1- MPM2-MPM3- CPE) 7 SIP/ IMS-SIP MoIP (Unicast/ Multicast, IPTV) Active and Passive Measurement CPE, MPM, and RACF 14th or 15th CJK meeting

Role-sharing arrangement China (CCSA) Korea (TTA) Japan (TTC) IP Network C-K: R&D network C-J, K-J: Commercial networks (or R&D network) CPE for Voice over IP CPE used in Phase I&II are applicable Software based CPE supporting the RTCP extensions such as SR/RR/XR/HR for Video over IP TBD Hardware based CPE Support RTCP SR/RR/XR video Service Platform Call servers used in Phase I&II 1st Stage: Call server emulator (planning) 2nd Stage: IMS MPM MPM (Software/Hardware) 1st Stage: PC based MPM provided by KDDI R&D labs. 2nd Stage: ATCA based MPM (based on the SBC by OKI Electric) RACF In preparation

Example of the check sheet for the preparation Responsibility Date Status Note IP Network Commercial IP-NW (CJ) J OK Commercial IP-NW (KJ) R&D IP-NW (CJ) C, J  TBD R&D IP-NW (KJ) K, J  CK-NW K Service Platform Call server (C) C To be prepared Simple SIP Call server (K) K  Call server emulation (J) J  Simple SIP >> IMS CPE  Voice/Video Terminal (C) C  PC, (Dedicated Terminal provided by KDDI R&D Labs.) Voice/Video Terminal (K) Voice/Video Terminal (J) OK  MPM PC based MPM (C) 1st : Provided by KDDI R&D Labs. PC based MPM (K) PC based MPM (J) Evaluations Scenario 6-1 C, J, K CJ    Start April 2008 KJ April 2008  CK  April 2008  Scenario 6-2 CJ  CK       Scenario 6-3 C, J, K   Scenario 6-4 Scenario 7 RACF (1st : Admission Control) Reports 13, 14, 15th -WG

Schedule

Discussions and Results IP connectivity Routing equipment, IP addressing, Operation, etc. ●Commercial networks, C-J and K-J networks, have the flexibility in the policy of IP addressing. The IP addressing will be decided considering the routing functions of the existing IP network (R&D network) between China and Korea Services Testing priority of Voice, Video, Audio (RTP streams)  ●Voice  Video Types and specifications (wide/narrow-band etc.) of CODECs should be discussed Target dates of Scenario 6-1,6-2,6-3,6-4 and 7 C-J , K-J, C-K testing ●Scenario 6-1 and Scenarios 6-2: July 2008 (13th NGN-WG) Scenario 6-1 and 6-2 Testing procedures, Drafting of the checking sheet, instauration of MPM (importation) ●Discussion will be made using e-mail reflector and teleconferencing by the end of May 2008. Specifications of Call servers (C and K) ●Specifications will be provided by C and K by end of April. Reporting Rotating the role among CJK ●The reports will be created at the CJK NGN-WG meeting (Lead author will be a person from the hosting SDO).