Uppsala University Contract UH2015/09 - UA2016/05 Job nr. 5973/7200

Slides:



Advertisements
Similar presentations
Cryo Capture Cavity II Progress Mike McGee April 6, 2005.
Advertisements

Mucool cryo-design Christine Darve Fermilab/Beams Division/ Cryogenic Department 8/12/02.
2 Technical seminar - 5 th June 2014 Vincent Roger - TE-MSC-TF.
Internal Cryomodule Instrumentation ERL Main Linac Cryomodule 10/10/2015 Peter Quigley, MLC Design Review.
WP3 Required interfaces for cryostat design / integration Patxi DUTHIL SPL 3 rd Collaboration Meeting, CERN, Geneva November 12 th 2009.
STATUS OF THE MEG CRYOSTAT Construction status Schedule ____________________________________________________________ 04/Agust/06 F. Raffaelli, L. Delfrate.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
Assembly Organisation and Duration. Work Site Organisation STORAGE SMA18 UNLOADING CLEAN ROOM CERN-SITE CLEANING MANUFACTURE DIRTY TRIAL ASSEMBLY ISO7.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
RESEARCH AND DEVELOPMENT FOR FUTURE LHC SUPERCONDUCTING MAGNETS POINT SUR LA STATION D’ESSAIS préparé par Jean-Marc Gheller Steering committee –September.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
H-ECCTD KICK-OFF DEVELOPMENT PLAN AND SCHEDULE 16/03/2016.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
LCLS-II Prototype Cryomodule Darryl Orris 21 January 2015 Final Design Review: Instrumentation.
S A Griffiths CM42 June 2015 Electrical & Control.
F LESEIGNEUR / G OLIVIER LUND January 9th, ESS HIGH BETA CRYOMODULE ESS CRYOMODULE STATUS MEETING HIGH BETA CRYOMODULE LUND JANUARY 9TH, 2013 Unité.
JLAB / SLAC – 4.5K Cold Box Schedule Review Directors Review
Task T6.2 Tertiary Buildings infrastructures installations
Final Design Cryogenic and mechanical configurations
Teleconf ACS – FREIA 28th March 2017
Teleconference ACS – FREIA 31th May 2017
Gersemi Cryostat Mechanical analysis
Teleconf ACS – FREIA 13th March 2017
Mechanical and cryogenic configurations
Control System and Automatic Sequences
Uppsala University Contract UH2015/09 - UA2016/05 Job nr. 5973
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
Liquid Hydrogen Infrastructure Update
UPPSALA UNIVERSITY GERSEMI
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
HFM Test Station Main Cryostat
LEP cryostat Procurement strategy and plans
Cryostat procurement, status and plan, QA/QC
Complementary ISTC Projects #3888, 3889p
AEGIS Magnet System.
Teleconference ACS – FREIA 18th April 2017
Teleconference ACS – FREIA 10th May 2017
Cryostat design Mechanical design: Thermal screens: Specifications:
Teleconference ACS – FREIA 17th October 2017
LARP Vertical Test Facility
Development of the pellet target in ITEP
Definition of work flow for string DESY Example on critical operation
Teleconference ACS – FREIA 31st October 2017
Diffuser status October 2017
Sébastien Bousson (CNRS-IN2P3-IPN Orsay)
From Design to Installation courtesy R. Folch S. Atieh TS / MME
(vertical cryostat, Gersemi)
Parts exchange for HL-LHC AUP Q1&Q3
UK RFD Pre-Series cryomodule
WP 3 coordination meeting Saclay May 2008
Cryostat design Mechanical design: Thermal screens: Specifications:
FRESCA Cryostats Outer cryostat during pressure test at the manufacturer Top plate and lambda plate for the outer cryostat Inner cryostat during reception.
Teleconference ACS – FREIA 20th February 2018
It is now possible to schedule operations based on their finish time
Uppsala University Contract UH2015/09 - UA2016/05 Job nr. 5973/7200
AIRnet Valves D83 to D158 What to order
Uppsala University Contract UH2015/09 - UA2016/05 Job nr. 5973
Schematic diagram of the cryogenic system
Prototype cryomodule development
Daresbury ESS In-Kind Contributions
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
Teleconference ACS – FREIA 19th June 2017
Prototype cavities development
UPPSALA UNIVERSITY_GERSEMI PROJECT
(vertical cryostat, Gersemi)
PS magnet status D Bodart 25/06/2019.
Presentation transcript:

Uppsala University Contract UH2015/09 - UA2016/05 Job nr. 5973/7200 Vertical Cryostat GERSEMI 3rd follow-up meeting 14/02/2017

WP1: double re-heater Delivered to Uppsala JOB STATUS WP1: double re-heater Delivered to Uppsala Manufacturing and testing procedure reviewed with ACS Use of the clean area Manufacturing file to be integrated in GERSEMI or to be done separately

WP2: cryostat status Overall: 68% Procurement: 77% Manufacturing: 21% JOB STATUS WP2: cryostat status Overall: 68% Procurement: 77% Manufacturing: 21% Actual tasks: Vacuum vessel procurement Lambda flange pre-assy On critical path: Vacuum vessel procurement Manufacturing start date: W1/2017 Manufacturing end date: W22/2017

WP2: cryostat Actual issues: Helicoflex gasket JOB STATUS WP2: cryostat Actual issues: Helicoflex gasket The cryostat is still the critical path

WP3: magnet insert WP4: bath insert Design updated W3 by ACS JOB STATUS WP3: magnet insert Design updated W3 by ACS Manufacturing drawings not started WP4: bath insert Procurement finished Assembly just started Will be stored in clean area

JOB STATUS WP3: magnet insert Actual issue: planning. Not in critical path if not linked to the VC+VB+bath insert

WP5: valves box status Large parts (valves, HX) already procured JOB STATUS WP5: valves box status Large parts (valves, HX) already procured Vacuum vessel and vacuum equipment in procurement Sensors and in procurement Assembly start date: W11/2017 Manufacturing end date: W18/2017

WP6: transfer lines Multiline general design completed JOB STATUS WP6: transfer lines Multiline general design completed An auxiliary support is needed Transfer line design to implement Close to critical path

Procurement: Other material: JOB STATUS Procurement: Other material: Butterfly control valves: VAT  1rst valve to be delivered W9 Vacuum valves: VAT  other valves delivered W12 Pressure sensors: BROOKS  delivery W13 Vacuum sensors: Pfeiffer Temperature sensors: Cernox  issue on delivery postponed to W10 Flowmeters: BROOKS  delivery W13 Film heaters: Winkler: tests validated by ACS  delivery W9 Gas heaters: Vulcanic Level sensors: AMI  delivery W20 Cryogenic valves delivered DATE HX delivered