GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Tracker Test Plan Overview.
Advertisements

GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, ANick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT Silicon Tracker Marcus ZieglerAPS April Meeting The GLAST Silicon Tracker Marcus Ziegler Santa Cruz Institute for Particle Physics University.
GLAST LAT ProjectOctober 14, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Engineering Meeting Tracker Engineering-Model.
GLAST LAT ProjectDOE/NASA Delta Baseline/Preliminary Design Review, July 30, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS.
CERN 30 Aug 2002ATLAS MDT-ASD PRR -- E. Hazen1 ATLAS MDT-ASD Integrated Circuit Production And Testing Plan E. Hazen – Boston University.
GLAST LAT ProjectMonthly Status Review – December 2, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT Silicon Tracker Marcus ZieglerIEEE The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus Ziegler.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 16 EEE Parts 1 GLAST Large Area Telescope Gamma-ray Large Area Space Telescope.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, BNick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 GLAST Large Area Telescope: Tracker Subsystem MCM Production Readiness.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Robert P. Johnson 1 GLAST Large Area Telescope: Silicon-Strip Tracker/Converter.
GLAST Large Area Telescope:
Tracker Subsystem1 GLAST LAT Project Production Readiness Review, 25 August, 2004 GLAST LAT Tracker TOWER-A PRR TKR Tower Electrical Test Plan Luca Latronico.
THEMIS SCM CDR MC VASSAL - 3D PLUS CETP 04/08/ Preamplifiers in 3D Technology EM manufacturing Part list and component Lot Acceptance Tests FM manufacturing.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: On-Orbit Calibration and.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Ladder Fabrication A. Brez.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Schedule Summary; Critical.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
Tracker SSD Ladder Preproduction Review Actions and Changes Since Last Week September 16, 2002 Alessandro Brez Robert Johnson.
GLAST LAT ProjectMonthly Status Review – June 30, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: MCM Assembly Gamma-ray.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Electronic Parts & Materials.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Silicon Strip Detector.
GLAST LAT ProjectQuarterly Review, November 12, 2002 LAT-PR GLAST Large Area Telescope: Tracker Subsystem Robert Johnson Santa Cruz Institute for.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 Survey & Process Review conducted at Teledyne on Nov. 14, 2003.
GLAST Large Area Telescope:
Integrated Circuits.
EFW DFB Systems Assurance
EFW DFB Systems Assurance
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Mini-Tower test results
GLAST Large Area Telescope:
Preproduction Status & Results
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Thermal Vacuum Test: Plans and Procedures
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Integration and Test Organization Chart
Introduction and Overview
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Presentation transcript:

GLAST Large Area Telescope: Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Tracker Subsystem WBS 4.1.4 5D: ASIC Procurement

Overview LAT-PS-1279: General Overview of Tracker ASIC Procurement Design specifications: LAT-SS-00169, LAT-SS-00170 (released) Wafer procurement from MOSIS/Agilent LAT-PS-1201 (released): Front-end readout chip (GTFE) LAT-PS-1222 (released): Readout controller chip (GTRC) Fabrication completed this month (submitted December 2002) Wafer probing and ASIC screening at UCSC LAT-PS-1250 (release in progress) Wafer lapping, dicing, and inspection LAT-PS-1321 (draft spec in progress) Wafer lot acceptance testing (MIL-STD-883E, Method 5007.6) Radiation testing (See Presentation 2B) LAT-TD-1325 (draft) Destructive physical analysis Electronics qualification and acceptance testing

Wafer Procurement Vendor: The MOSIS Service of the USC ISI. Checking of design files, including DRC on the layout Subcontracting for fabrication of the masks (Dupont) Subcontracting the wafer fabrication HP/Agilent 0.5 m, 3-metal, epitaxial process (AMOS14TB) Thorough electrical testing of process monitors on each wafer MOSIS guarantees that the wafers meet the Agilent process specifications MOSIS provides the test results in the form of e.g. physical transistor parameter, sheet resistance, etc. Extraction of Spice model parameters for each wafer lot BSIM3 V3.1 models for design verification, especially in case problems arise Shipment of wafers to SLAC LAT specifications: LAT-PS-1201 and LAT-PS-1222 (released)

Wafer Procurement Status The flight wafers are locked in a dry-nitrogen cabinet in the wafer-probing clean-room at UCSC. One wafer of each chip type was sacrificed to yield chips for testing.

ASIC Screening Procedures, QA provisions, and travelers: LAT-PS-1250 Detailed descriptions of the test vectors: LAT-TD-247 for the GTFE LAT-TD-248 for the GTRC Carried out in a cleanroom at UCSC Conforms with the LAT contamination control plan (LAT-MD-404) Conforms with ESD controls in LAT-MD-228 and NASA-STD-8739.7 Cascade automated probe station Custom probe cards interface to the VME readout Bad dice are automatically ink marked 100% testing of all functionality GTFE performance testing (to extent possible without SSDs) Data archived in an MS Access database

EM ASIC Screening Only limited wafer probing was achieved with the Engineering Model ASICs: The GTRC probe card had fatal problems (such as the probes being put on backwards by the vendor) and did not work. A new card has since been built and is functional at the full clock rate. The GTFE probe card could only operate at 2 MHz, due to excessive capacitive loading on the IC output drivers. The chip-to-chip outputs could not be tested at all. The probe card design has been updated and new cards built to correct these problems. It now operates at 20 MHz+ and tests all functionality. The probe station operation was not integrated with the test program. We have since updated out software to enable fully automated processing of an entire wafer plus automatic marking of bad dice. Incomplete IC testing caused problems during the EM MCM assembly. The wafer test system is now much improved and is ready for flight production.

Flight ASIC Screening The Cascade automated probe station at the Santa Cruz Institute for Particle Physics. Located in a small clean room that is dedicated solely to wafer probing. In addition, it is under a downflow hood with extra HEPA filters. The work area has recently been upgraded to conform to LAT contamination control and ESD control requirements. Workers have been formally trained in ESD and cleanroom procedures. Wafers are stored in a locked dry-nitrogen cabinet in this room.

Flight ASIC Screening Status: Final versions of both probe cards are in hand and tested. Software details are being finalized and tested and the software put under configuration control. The procedure (LAT-PS-1250) is in the review/release process. The clean room has been updated for procedures, ESD, etc. and was inspected. A date is set to train personnel in clean-room and ESD procedures. New GTRC probe card under test in a manual probe station.

Wafer Lapping & Dicing Specification, LAT-PS-01321, in progress. A single vendor will do the following: Lap the wafers from 610 microns to about 270 microns. This improves the wire bonding on the MCM Dice the wafers to our specified die size Pick the dice, separate the chip types, and separate bad dice from good dice (according to ink markings) into waffle packs. Visually inspect the dice to reject Scratches or chipped edges Inked dice Dice of the wrong chip type Ship the completed waffle packs to Teledyne Perform wafer lot acceptance testing on each lot according to MIL-STD-883E, Method 5007.6

ASIC Qualification & Acceptance Qualification and acceptance testing of the ICs cannot be done on the bare dice in any practical way. Therefore, the qualification and acceptance tests are those pertaining to the completed MCMs (Presentation 7C). Qualification: 38 MCMs from the initial production, including 2 for DPA. DPA of some bare dice. Acceptance: all MCMs Complete functional tests of finished MCMs Noise, threshold, and gain performance (without the SSD load) Thermal cycles to acceptance levels Burn-in MCMs failing acceptance testing or not 100% functional after burn-in (except for possibly <<1% bad individual amplifier channels) must be discarded. Radiation testing (Presentation 2B): ICs mounted on mini MCMs.