Gordon L. Jaynes glj4law@aol.com A DAM GOOD THING Gordon L. Jaynes glj4law@aol.com Copyright 2008.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

A GIA is a contract between a surety company and a contractor (or subcontractor)/principal. A GIA is a standard, typical document in the construction.
Contracts – important issues
What Small and Emerging Contractors Need to Know Understanding Dispute Resolution Options in the Construction Industry © Copyright 2014 NASBP.
The ICC DISPUTE BOARD RULES DRBF 6th Annual International Conference Programme Budapest 6-7 May 2006 Presentation by Katherine González Arrocha Senior.
Dispute Settlement Services offered by the WIPO Arbitration and Mediation Center Heike Wollgast, WIPO Arbitration and Mediation Center.
Dr. Lic. Herfried Wöss, LL.M. (Exeter), MCIArb. © The relationship between Arbitration and the Dispute Adjudication Board under the FIDIC Silver Book (EPCT)
Cost Effective Dispute Resolution Alana Dowley Legal Services Director Contract Intelligence Pty Ltd.
GENEVA GROUP INTERNATIONAL World Conference - Rome, Italy October 19, 2012 Att. Patrizia GIANNINI.
FIDIC MDB Conference Brussels Putting Your Money Where Your Mouth Is OR Practising What Your Preach The Funding (or not) of DABs by International Banks.
WIPO ARBITRATION AND MEDIATION CENTER 1 Ignacio de Castro WIPO Arbitration and Mediation Center February, 2008 Arbitration of Intellectual.
INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS. FIDIC MEASUREMENT AND EVALUATION CHAPTER 20 SECTIONS 20.5 TO 20.8.
Learn. Perform. Succeed. Protest, Claims, Disputes and Appeals Chapter 7.
Time for a new standard - AS General Conditions of Contract
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT 20. Claim, Disputes and Arbitration [Construction Contract Administration]
Drafting a Bullet-Proof ADR Clause: Lessons Learned
Introductory to the “Basics” of Contract Types and Their Impact in the Management of Government Property Presented by: Fay K. Schulte, CPPM.
تقديم وسائل تسوية المنازعات Presentation of dispute settlement means.
AMENDED LAWS FOR UTILITY COORDINATION 2009 AASHTO R/W & Utilities Subcommittee Conference April 22 nd.
Design Build, Job Contracting, or Construction Manager at Risk In early 2000 the legislators added an alternate way to accelerate construction project.
CONSTRUCTION ADMINISTRATION Claims and Disputes Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate Program.
1 DISPUTE SETTLEMENT THROUGH ADJUDICATION N D Sharma.
Change Orders. CO Proposals Initiated by owner or GC –Owner requests estimate for work proposed –GC CO results from changed site condition or response.
Institute for Austrian and International Tax Law Session IX. “I had a dream…” A Gradual Approach to Improving Dispute Resolution with.
Practice of International Trade – The Prevention and Settlement of Disputes Chapter 4-6
LONDON COURT OF INTERNATIONAL ARBITRATION
Your Rights! An overview of Special Education Laws Presented by: The Individual Needs Department.
Change Orders, Extras and Claims Presented by Geoffrey Cantello, City of Ottawa.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
CCA Adjudication Cashflow, or fair dispute resolution, or both? Opportunities for Improvement in the Act and adjudication procedure Peter Degerholm AMINZ.
CHANGE ORDER/CLAIMS MANAGEMENT MODULE 9. Change Order Management.
Four Ways Suppliers Limit Their Risk Contractually
Contract Compliance Training
The Mediation Centre of Chamber of Notaries in Gdańsk
Amendments to the Public Works Contracts
Resolving Health Care Disputes
Procurement and Contract Management Training
Addressing Vendor Disputes
What Small and Emerging Contractors Need to Know Understanding Selected Key Provisions of Construction Contracts © Copyright 2017 NASBP.
Programming Committee - composition
Principal And Building Rep Advocacy Training
Green Line Extension Project
Arbitration and the MLI
Administration of a FIDIC Contract - Project Control
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Resolving IP Disputes outside the Courts through WIPO ADR
What Small and Emerging Contractors Need to Know Understanding Dispute Resolution Options in the Construction Industry © Copyright 2017 NASBP.
EPA CONTRACT TEMPLATE Overview
The subcontract template
Contract implementation - Management of Suppliers -
CHAPTER ONE OBJECTIVE AND GOAL
EPA SUBCONTRACT TEMPLATE Overview September 2017
Grant Orientation Session
What Small and Emerging Contractors Need to Know Understanding General Agreements of Indemnity © Copyright 2017 NASBP.
First Collective Agreements
BRIEFING TO THE SELECT COMMITTEE ON SECURITY AND JUSTICE ON THE INTERNATIONAL ARBITRATION ,BILL, 2017 [B10B-2017] 1 NOVEMBER 2017.
Tim Ahern Consultancy Ltd. tim. Tel;
Contract Compliance Training
Contract Review and Processing
SIMAD UNIVERSITY Keyd abdirahman salaad.
SIMAD UNIVERSITY Keyd abdirahman salaad.
Sponsored by Illinois Presented by Trent Knoles
Resolving Health Care Disputes
Certificates JCT 11 SBC allows for 10 different kinds of certificates.
Function of the International Court of Justice (ICJ):
Grant Orientation Session
Unique General Conditions of the Alabama Building Commission (ABC)
Enhancing Procurement Efficiency: Litigation Issues, Standard Bidding Documents and eGP Shakti Prasad Shrestha March 21, 2018.
ALTERNATIVE MEANS OF DISPUTE RESOLUTION
What is a Dispute Board? A Dispute Board is composed of 1 or 3 neutral individuals who help the Parties avoid disputes or resolve disputes. If necessary,
Presentation transcript:

Gordon L. Jaynes glj4law@aol.com A DAM GOOD THING Gordon L. Jaynes glj4law@aol.com Copyright 2008

“The world requires at least ten years to understand a new idea “The world requires at least ten years to understand a new idea.” Sir Ronald Ross Copyright 2008

El Cajon, Honduras – "A Dam Good Thing"

Standard Bidding Document “Procurement of Works and User’s Guide” “MDB Harmonised Conditions for Construction” Copyright 2008

What is a Dispute Board? Clause 20, MDB Harmonised Conditions Dispute prevention Dispute decision One person/three persons Copyright 2008

Who can Serve? “Professionals experienced in the type of construction involved and with the interpretation of contractual documents.” “Fluent in the language for communication defined in the Contract” Must undertake to abide by (and be liable for failure to observe) various commitments made in the Agreement of service. Copyright 2008

How are the members selected? Each Party nominates one for approval by the other Party The two so chosen nominate Chair for approval by the Parties A “default” provision is included Replacement and termination Copyright 2008

How does the DB operate? Site Visits At or near start of construction and thereafter at intervals of not more than 140 days; Accompanied by Parties & Engineer on “tour” of site; Informal discussion of progress of the Works and any impending problems or disagreements; Report of visit delivered before departure from site. Copyright 2008

How does the DB operate? Other DB is “to endeavor to prevent potential problems or claims becoming disputes.” Includes working with Engineer Can be summoned on short notice for critical events during construction (28 days notice) Between site visits, receives Monthly Progress Reports, including Variations, Claims, and Programme Changes. Copyright 2008

How does the DB process a dispute which is referred to it? Engineer makes a determination on any claim and either Party, if in disagreement, can refer to the dispute to the DB. Procedural Rules: Annex contains less than one page of procedures. DB has great latitude, but must act -- “fairly and impartially between the Parties” and “adopt procedures suitable to the dispute, avoiding unnecessary delay or expense.” Copyright 2008

How does the DB process a dispute which is referred to it? Written submissions Hearing: Informal compared to arbitral hearings Presentations by persons directly involved in the day-to-day construction of the Works Can work on “documents only” Copyright 2008

How does the DB process a dispute which is referred to it? DB will seek unanimity, but if unsuccessful, decision is by majority Majority may require dissenting opinion to be produced Decisions are to be reasoned and to be in writing Decisions are immediately binding, unless and until revised in an amicable settlement or by arbitration Copyright 2008

What are the steps to obtain such revision? Must give notice of dissatisfaction within 28 days of receipt Must engage in amicable settlement efforts for a minimum of 56 days After the minimum of 56 days of amicable settlement efforts either Party can commence arbitration Copyright 2008

Why do MDBs favour DBs? Some $90 billion of construction disputes have been resolved amicably by use of DBs Most resolved by the time construction is complete Cost is much less than arbitration or litigation (0.05% to 0.24% of final Contract Price; average 0.15%) Copyright 2008

How are DBs paid? Monthly Retainer fee for: Daily fee for: Being available on short notice Becoming and remaining familiar with the Contract Indirect costs All other matters not covered by the daily fee Daily fee for: Site visits including maximum of 2 days of travel time in each direction Hearings (if not during Site visit) Studying written submissions on a dispute Private meetings of DB to reach decisions Reimbursement of costs. Copyright 2008

What problems with DBs have arisen on MDB financed Contracts? Lack of training of borrowers/aid recipients False “economies”: Defer establishment of DB Reduce frequency of Site visits Eliminate monthly retainer fee Reduce daily fee Copyright 2008

El Cajon, Honduras – "A Dam Good Thing"