Ensuring a successful TPC production

Slides:



Advertisements
Similar presentations
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
Advertisements

Torch electronics test environment MCP readout update.
3.6.2 Student Book © 2004 Propane Education & Research CouncilPage 1 Many propane marketers receive railcar bulk propane shipments. Well-trained personnel.
Chapter 14 Network Design and Implementation. 2 Network Analysis and Design Aspects of network analysis and design Understanding the requirements for.
COMP8130 and 4130Adrian Marshall 8130 and 4130 Test Design & Documentation Adrian Marshall.
Quality control of raw materials In-process control
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
Design and Technology – Rain Gauge Project
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Tango Asset Management Capabilities Presentation 1.Desktop & Web Architecture 2.Equipment Management 3.Condition Management 4.Data Mining 5.Parameter Trending.
DOCUMENTATION.
… and after unit testing …
SWIS Digital Inspections Project (SWIS DIP) Chris Allen, Information Management Branch California Integrated Waste Management Board November 5, 2008 The.
Standards of Practice Course
From Research Prototype to Production
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
Standardization Control Kaizen Facilitation. Objectives Understand the need for standardization Explore different standardization approaches 2.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
Test and Review chapter State the differences between archive and back-up data. Answer: Archive data is a copy of data which is no longer in regular.
Rev.04/2015© 2015 PLEASE NOTE: The Application Review Module (ARM) is a system that is designed as a shared service and is maintained by the Grants Centers.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
UK ATLAS SCT Module Quality Assurance Joe Foster, Manchester University 04 Jan 2005 All results compiled in time for Christmas…
Radiopharmaceutical Production
STAGE 3 IMAGE SIZING AND COMPOSITION CREATION.. STAGE 3 SIZING AND COMPOSING YOUR IMAGE As you cannot change the size of your image after it is burnt.
How the NCSX Project Does Business
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
Complete Ordering System for Promotional Literature and Samples Quick Reference and Training Guide.
Idaho Procedures M650 GREEN LIGHT OPTICAL SCAN TABULATOR.
Project management Topic 2 Product based planning.
Quality Assurance for LHC Gas Systems Stefan Haider / EP-TA1.
PROGRAMMING FUNDAMENTALS INTRODUCTION TO PROGRAMMING. Computer Programming Concepts. Flowchart. Structured Programming Design. Implementation Documentation.
C. Haber / M. Gilchriese Integrated Stave Electrical/Mechanics/Cooling Update February 6, 2008.
4/22/20131BEAST MEETING Reminder of BEAST TDR schedule (expected deliverables in red) April 19 th: – Draft specifications for each beast subsystem We need.
PROCURE TO PAY REPORTS April 2016 Cindi Stinebaugh.
Fermilab LCLS-II Cryomodule QA/QC Model and Software Tools ESS Cryomodule Workshop, 16-Oct-2014 Jamie Blowers Head of Machine Shop and Quality & Materials.
QCG Report Francesco Forti University and INFN, Pisa.
Cold mass procurement, status and plan, QA-QC H. Prin With contribution from S. Becle, O. Housiaux, R. Principe, J.-L. Rudeiros Fernandez, F. Savary 3.
US Belle II Project – Technical Elements David Asner Pacific Northwest National Laboratory.
Testing and delivery Web design principles. Web development is software development.
Emdeon Office Batch Management Services This document provides detailed information on Batch Import Services and other Batch features.
BEAST micro-TPC Prototype Construction In charge: Igal / Sven now  later Peter / Igal / Sven Main grad students: Michael & Ilsoo Gas supply, measurement,
WBS 1.05 Commissioning Detector Scope, Cost & Schedule Sven Vahsen University of Hawaii.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
BSB Biomanufacturing CHAPTER 4 GMP – Documentation Part I (SOP)
Quality Brian Russell.
SOFTWARE TESTING Date: 29-Dec-2016 By: Ram Karthick.
Completion of the MICE-US construction project
Using SHOPFLOOR with QUALITY control
Field Inventory Services-Sanofi Inventory and Audit Training
System Navigation and Test Launch
Roberta Roth, Alan Dennis, and Barbara Haley Wixom
Product Development Scenario Overview
CHAPTER 10 Testing Introduction
SMART GOALS.
Multimedia and Internet Technology
CHAPTER 10 Testing Introduction
Chapter 1 Introduction(1.1)
Project Directions You can use the links on the next slide if you are in Show mode (just hit the F5 key to enter Show mode). Otherwise you can copy and.
Contracts, Purpose Statements, Examples and Tests
SYSTEMS ANALYSIS & DESIGN
Single-Phase Qualification of Microcircuits in ESCC 9000
Health Insurance Portability and Accountability Act
Pair work – Do you want to change seats??
Order procurement Input: customer need Sales: identifies customer need
Pair work – Do you want to change seats??
ESS High Beta Cavities Quality Assurance and Control - Learning and Planning Workshops, CEA Saclay, 30 June - 1 July 2016 Mark Pendleton STFC, Daresbury.
Radiopharmaceutical Production
Presentation transcript:

Ensuring a successful TPC production Design Quality Assurance (QA) Quality Control (QC) Sven

Hypothetical Failure Scenarios As magnetic field is turned on four of the TPC instantly fail. Cause: Ferromagnetic screws used to secure field cage resistors in last four TPCs, after we ran out of other screws. Actual problem: design stage - no clear agreement on exactly which screws to use. During phase II, as luminosity increases, gas purity deteriorates. We find we need slightly higher drift velocity and HV to get a good signal. Three of the TPCs spark at the new setting and can no longer be used. Cause: Rough specs on three individual field cage ring. Actual problem: QC procedure did not specify passing criteria for spark testing of field cage. Only nominal field value used. QA did not specify visual inspection of rings. Three of the TPCs have a lower signal. We have to flow more gas to recover, and run out of funds, due to the expensive gas vendor at KEK. Cause: there is food grease on three Kapton shields. Log reveals these three TPCs were assembled by one particular student. Actual problems: QC: Did not measure outgassing of all final field cages. QA: Did not prescribe use of gloves. Such failures are very typical in experimental HEP(!) Minimize or avoid through careful Design – what do build Quality Assurance (QA) – how to build Quality Control (QC) – how to test

Design: All aspects of design should be Agreed on – shown in production meeting Approved – by all three Ph.D.s: Igal, Peter, Sven Documented – on Wiki Exact design specification (shop drawing, design file, part number, web page link or similar) Date approved, and by whom QA/QC procedure is part of design, must also be agreed on, approved, and documented We did some rough documentation of prototype design here: https://wiki.phys.hawaii.edu/bin/view/BEAST/TechnicalDocumentation Need more detailed page for production

Quality Assurance (QA) We need written instructions for how to build each part There should be a checklist on a printed piece of paper, where people checks off each production step, put initials, and date There can be multiple people signing off Example (rough) for FE DAQ boards: Procure circuit board from vendor A Vendor B loads components Send to LBNL for chip loading Glue chip with epoxy of type TBD Wire bond Ultrasonic cleaning Ship back to Hawaii Characterize FE chip Assemble onto field cage structure As the TPCs get integrated, the QA/QC sheet for all parts get put into a common folder (one folder per TPC) There can be separate levels of sheets. For instance, characterizing FE chip may get a separate QA sheet with more detail. And one top-level sheet per TPC.

Quality Control (QC) We need written instructions for how to test each part There should be a checklist on a printed piece of paper, where people checks off each test step, put initials, a few key summary tests results, date, location of test data Detailed test data should go into a common location on dcube server [As the TPCs get integrated, the QA/QC sheet for all parts get put into a common folder (one folder per TPC)

Final Comment What you just heard may sounds pedantic But, such steps were crucial for construction of complex detectors systems in the past. E.g. ATLAS pixel detector If production is well documented, you can often figure out cause of failures by studying the log books carefully, and correct procedures in time If not well documented, failure is likely