05.03.2007 TPC QA and Amore Marian Ivanov. Marian Ivanov TPC calibration meeting Motivation The TPC (online) QA consist from two parts Raw data monitoring.

Slides:



Advertisements
Similar presentations
T0 offline status Alla Maevskaya Institute for Nuclear Research, Moscow 8 October 2007 ALICE offline week For T0 group.
Advertisements

Kondo GNANVO Florida Institute of Technology, Melbourne FL.
5/2/  Online  Offline 5/2/20072  Online  Raw data : within the DAQ monitoring framework  Reconstructed data : with the HLT monitoring framework.
11th April 2008TOF DA & ppChiara Zampolli. DAQ-DA Three DAQ-DAs implemented, deployed, validated, and tested: TOFda TOFnoiseda TOFpulserda DCS-DA One.
Normal text - click to edit Status of implementation of Detector Algorithms in the HLT framework Calibration Session – OFFLINE week ( ) M. Richter,
1 TPC Online Monitoring Guide – P. Christiansen (Lund) TPC Online Monitoring Guide P. Christiansen (Lund) “Old” online monitors (/ RAW data monitors) 
TPC shift guide1 Offline monitoring This guide explains: Where the RAW data are stored and how to access them A pointer to a common AliRoot setup on lxplus.
ACORDE REPORT Pedro Podesta UAS Mexico. Geometry ( No changes) Alignment (No changes) QA (No changes ) Shuttle (In progress) To do Outline.
Chiara Zampolli in collaboration with C. Cheshkov, A. Dainese ALICE Offline Week Feb 2009C. Zampolli 1.
Quality Control B. von Haller 8th June 2015 CERN.
SSD Status P. Christakoglou (NIKHEF-UU) for the SSD collaboration Thanks to: Marco vL, Enrico, Mino, Marek and Massimo.
Experience with analysis of TPC data Marian Ivanov.
AMORE Quality Assurance Integration Filimon Roukoutakis CERN Physics Department ALICE DAQ ALICE Offline Week CERN, 11/10/2007.
PHOS offline status report Yuri Kharlov ALICE offline week 7 April 2008.
Online Monitoring and Analysis for Muon Tomography Readout System M. Phipps, M. Staib, C. Zelenka, M. Hohlmann Florida Institute of Technology Department.
Real data reconstruction A. De Caro (University and INFN of Salerno) CERN Building 29, December 9th, 2009ALICE TOF General meeting.
Offline report – 7TeV data taking period (Mar.30 – Apr.6) ALICE SRC April 6, 2010.
5/2/  Online  Offline 5/2/20072  Online  Raw data : within the DAQ monitoring framework  Reconstructed data : with the HLT monitoring framework.
Planning and status of the Full Dress Rehearsal Latchezar Betev ALICE Offline week, Oct.12, 2007.
4 Oct 2005 / Offline week Shuttle program for gathering conditions data from external DB Boyko Yordanov 4 October 2005 ALICE Offline week.
PHOS offline status report Dmitri Peressounko ALICE offline week,
1 ITS Quality Assurance (& DQM) P. Cerello, P. Christakoglou, W. Ferrarese, M. Nicassio, M. Siciliano ALICE OFFLINE WEEK – April 2008.
September 2007CHEP 07 Conference 1 A software framework for Data Quality Monitoring in ATLAS S.Kolos, A.Corso-Radu University of California, Irvine, M.Hauschild.
1 SDD: DA and preprocessor Francesco Prino INFN Sezione di Torino ALICE offline week – April 11th 2008.
EMCAL : Online Software Status 1) General info/intro 2) DCS-related: detector configuration, Data Points 3) DAQ: Detector Algorithms 4) QA, AMORE 5) Offline-related:
LM Feb SSD status and Plans for Year 5 Lilian Martin - SUBATECH STAR Collaboration Meeting BNL - February 2005.
TPC QA + experience with the AMORE framework Marian Ivanov, Peter Christiansen + GSI group.
1 Checks on SDD Data Piergiorgio Cerello, Francesco Prino, Melinda Siciliano.
1 SDD offline status Francesco Prino INFN sezione di Torino ALICE offline week – March 15th 2010.
Statistical feature extraction, calibration and numerical debugging Marian Ivanov.
Alberto Colla - CERN ALICE off-line week 1 Alberto Colla ALICE off-line week Cern, May 31, 2005 Table of contents: ● Summary of requirements ● Description.
Computing for Alice at GSI (Proposal) (Marian Ivanov)
1 The status of the SDD detector - OFFLINE - Francesco Prino INFN Sezione di Torino ALICE CLUB – October 14th 2008.
ALICE Offline Week October 4 th 2006 Silvia Arcelli & Chiara Zampolli TOF Online Calibration - Strategy - TOF Detector Algorithm - TOF Preprocessor.
1 SDD offline status Francesco Prino INFN sezione di Torino ALICE offline week – October 20th 2008.
Quality assurance for TPC. Quality assurance ● Process: ● Detect the problems ● Define, what is the problem ● What do we expect? ● Defined in the TDR.
PHOS offline status report Yuri Kharlov ALICE offline week 7 July 2008.
Calibration algorithm and detector monitoring - TPC Marian Ivanov.
 offline code: changes/updates, open items, readiness  1 st data taking plans and readiness.
AliRoot Classes for access to Calibration and Alignment objects Magali Gruwé CERN PH/AIP ALICE Offline Meeting February 17 th 2005 To be presented to detector.
D. Elia (INFN Bari)Offline week / CERN Status of the SPD Offline Domenico Elia (INFN Bari) Overview:  Response simulation (timing info, dead/noisy.
AliRoot survey: Calibration P.Hristov 11/06/2013.
Barthélémy von Haller CERN PH/AID For the ALICE Collaboration The ALICE data quality monitoring system.
10/8/ HMPID offline status D. Di Bari, A. Mastroserio, L.Molnar, G. Volpe HMPID Group Alice Offline Week.
DAQ thoughts about upgrade 11/07/2012
CALIBRATION: PREPARATION FOR RUN2 ALICE Offline Week, 25 June 2014 C. Zampolli.
ACORDE OFFLINE STATUS. OUTLINE ACORDE Visualization Raw Data Shuttle.
V4-18-Release P. Hristov 21/06/2010.
(New) Root Memory checker
Marian Ivanov, Anar Manafov
Jacek Otwinowski (Data Preparation Group)
Christoph Blume Offline Week, July, 2008
Online Monitoring : Detector and Performance check
Marian Ivanov TPC status report.
DPG Activities DPG Session, ALICE Monthly Mini Week
Massimo Masera INFN sezione di Torino
News on the CDB Framework
fields of possible improvement
Calibrating ALICE.
v4-18-Release: really the last revision!
New calibration strategy – follow-up from the production review
Commissioning of the ALICE HLT, TPC and PHOS systems
ZDC Status Report Outline C. Oppedisano E. Scomparin
Jacek Otwinowski (for the DPG QA tools and WP7 groups)
Online Calibration Online calibration: validation: L3fCalCalibTool –
ALICE Offline Week, CERN
EMCal Offline Code Status: Introduction and tasks
Analysis framework - status
QA tools – introduction and summary of activities
Offline framework for conditions data
Presentation transcript:

TPC QA and Amore Marian Ivanov

Marian Ivanov TPC calibration meeting Motivation The TPC (online) QA consist from two parts Raw data monitoring e.g. Amplitude spectra (1D, Profiles) ->require noise map + primitive calibration Time dependence of mean Amplitude Monitoring of calibration parameters Check the detector behauvior Check the calibration algorithm itself

Marian Ivanov TPC calibration meeting Algorithm 0 -Example - 2D noise distribution A-Side

Marian Ivanov TPC calibration meeting Pulser Q measurement

Marian Ivanov TPC calibration meeting Time 0 CE

Marian Ivanov TPC calibration meeting

DA0DA1DAi FXS SHUTTLE OCDB FXS End of run ?????

Marian Ivanov TPC calibration meeting

TPC implementation All amore related code in SVN AliRoot/TPC/amoreTPC-QA Amore QA part – libAmoreTPCPublisher AliTPCDataMakerRec – AliTPCdataQA part GUI – libAmoreTPCUI Simple histograms + Expert mode (class AliTPCCalibViewerGUI used also in AliEve)

Marian Ivanov TPC calibration meeting DA export implementation 1. DAs itself - (TPCCEda.cxx.diff) +#include +int amore::da::Updated(char const*){return 0;} -+ amore::da::AmoreDA amoreDA; + amoreDA.Send("CE",&calibCE); 2. MakefileDA: -CXXFLAGS+=-I${ALICE_ROOT}/$(DAMODULE) +CXXFLAGS+=-I${ALICE_ROOT}/$(DAMODULE) $(shell amore-config --includes) -DAQDALIB=$(DAQDADIR)/libdaqDA.a +DAQDALIB=$(DAQDADIR)/libdaqDA.a $(AMORE)/lib/libAmoreDA.a $(ROOTLIBDIR)/mysql.a ${DIMBIN}/libdim.a -CXXFLAGS+=-I${ALICE_ROOT}/$(EXTRADAMODULE) +CXXFLAGS+=-I${ALICE_ROOT}/$(EXTRADAMODULE) $(shell amore-config –includes) Subscriber - GUI part UIQA::GetNoise(){ amore::da::AmoreDA amoreDA; TObject *temp=0; amoreDA.Receive("PEDESTAL/NOISE",temp);